Back to kitchen remodel contractors
Ru Huang Construction Co
- Based in
- Daly City
- On San Francisco permits
- Aug 2005 to Jan 2013
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2008 | Completed final sign-off Jul 2008 | 2025 15th St | remodel 1 bath 1 kitchen. 2nd story right hand unit. no structural work. (e) lighting to remain.Details
remodel 1 bath 1 kitchen. 2nd story right hand unit. no structural work. (e) lighting to remain. | $12,000 |
| Oct 31, 2005 | Completed final sign-off Apr 2006 | 364 02nd Av | repair items per nov #200563558, repair rear siding, and 4th and 6th tread on 2nd flight of rear stairs, replace floor tiel and kitchen sink and cabinets in kitchen, and replace shower wall tilesDetails
repair items per nov #200563558, repair rear siding, and 4th and 6th tread on 2nd flight of rear stairs, replace floor tiel and kitchen sink and cabinets in kitchen, and replace shower wall tiles | $15,000 |