Rtc Construction Co.
- Based in
- Millbrae
- On San Francisco permits
- Apr 2004 to Nov 2018
- Last 24 months
- 0 permits filed
25 permits since 2000: 17 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 6 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 2 never finaled. Typically 40 days from filing to permit and 806 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2018 | Completed final sign-off Feb 2020 | 1294 Vallejo St | residential only: replace extg footing with new concrete footing and relocate plywood shear wall. add new ada bathroom in the 1 floor. revision to app#201603182483Details
residential only: replace extg footing with new concrete footing and relocate plywood shear wall. add new ada bathroom in the 1 floor. revision to app#201603182483 | $40,000 |
| Dec 19, 2017 | Completed final sign-off Jan 2020 | 1294 Vallejo St | revision to pa #201603182484. replace existing footing with new concrete footing and relocate plywood shearwall. add new ada bathroom in the first floor (commercial) maher naDetails
revision to pa #201603182484. replace existing footing with new concrete footing and relocate plywood shearwall. add new ada bathroom in the first floor (commercial) maher na | $20,000 |
| Aug 18, 2017 | Never finaled issued Aug 2017, no final | 301 Crescent Ct | tile replacement in vanity area and bathroom, bathroom, retile shower, and toilet replacement.Details
tile replacement in vanity area and bathroom, bathroom, retile shower, and toilet replacement. | $3,000 |
| Dec 20, 2016 | Completed final sign-off Jul 2019 | 1400 Grant Av | commercial space, ground floor work only. soft story retrofit , 2 steel frames and footing, 7 plywood shear walls, epoxy bolt. add 1 handicap bath, replace 9 entrance hardwares.Details
commercial space, ground floor work only. soft story retrofit , 2 steel frames and footing, 7 plywood shear walls, epoxy bolt. add 1 handicap bath, replace 9 entrance hardwares. | $85,000 |
| Dec 20, 2016 | Completed final sign-off Jul 2019 | 1400 Grant Av | residential ground floor only. soft story retrofit, 2 steel frames and footing, 7 plywood shear walls, epoxy bolts. add 1 handicap bathroom, replace 9 entrance door handware.Details
residential ground floor only. soft story retrofit, 2 steel frames and footing, 7 plywood shear walls, epoxy bolts. add 1 handicap bathroom, replace 9 entrance door handware. | |
| May 17, 2016 | Never finaled issued Jan 2017, no final | 1197 Dolores St | renovate and add bath @ dwelling unit @ 1/fl. consist living/dining area, kitchen & bath. new unit to be fully sprinklers (1/fl only). remodel kitchen at unit 1197 @ 2/fl. replace windows @1/fl & 2/fl, facing the street. infill @ lightwell,Details
renovate and add bath @ dwelling unit @ 1/fl. consist living/dining area, kitchen & bath. new unit to be fully sprinklers (1/fl only). remodel kitchen at unit 1197 @ 2/fl. replace windows @1/fl & 2/fl, facing the street. infill @ lightwell, | $50,000 |
| Aug 5, 2015 | Completed final sign-off Nov 2016 | 3775 25th St | renovate ground level plan to include an exercise room & bathroom. work includes excavation, new foundation, new electrical, plumb, heating, & minor modifiations to the plan below the overhang of the story directly above.Details
renovate ground level plan to include an exercise room & bathroom. work includes excavation, new foundation, new electrical, plumb, heating, & minor modifiations to the plan below the overhang of the story directly above. | $39,000 |
| Oct 30, 2013 | Completed final sign-off Oct 2016 | 195 18th Av | remodel (e) bathroom. replace bathtub, sink, & toilet.Details
remodel (e) bathroom. replace bathtub, sink, & toilet. | $8,000 |