Rtc Construction Co.
- Based in
- Millbrae
- On San Francisco permits
- Apr 2004 to Nov 2018
- Last 24 months
- 0 permits filed
25 permits since 2000: 17 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 6 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 19, 2018 | Never finaled issued Aug 2019, no final | 1400 Grant Av | replace extg front doors at units #1412, #1414 & #1420. comply with planning enforcement case no. 2018-014458enf.Details
replace extg front doors at units #1412, #1414 & #1420. comply with planning enforcement case no. 2018-014458enf. | $4,500 |
| Aug 17, 2018 | Completed final sign-off Jan 2020 | 1800 Hyde St | tenant improvement for existing sandwich shop due to soft story renovation under permit #201603182484 (address 1294 vallejo st.) install new kitchen equipment, new plumbing and lighting.Details
tenant improvement for existing sandwich shop due to soft story renovation under permit #201603182484 (address 1294 vallejo st.) install new kitchen equipment, new plumbing and lighting. | $75,000 |
| Jun 12, 2018 | Never finaled issued Jun 2018, no final | 1197 Dolores St | revision to 201605177697 & 201605177696 to create separate storage areas withing (e) garage area no reduction in parking spacesDetails
revision to 201605177697 & 201605177696 to create separate storage areas withing (e) garage area no reduction in parking spaces | $2,500 |
| Apr 11, 2018 | Never finaled issued Apr 2018, no final | 702 Vallejo St | install 3 underpinnings for temp shoring of new retaining wall construction at 1415 stockton st. ref: 2018103073096Details
install 3 underpinnings for temp shoring of new retaining wall construction at 1415 stockton st. ref: 2018103073096 | $25,000 |
| Mar 22, 2018 | Completed final sign-off Jul 2019 | 1400 Grant Av | revision to soft story app# 201612205485, revised anchor bolts to existing brick footings.Details
revision to soft story app# 201612205485, revised anchor bolts to existing brick footings. | $2,000 |
| Jan 5, 2018 | Completed final sign-off Feb 2020 | 1294 Vallejo St | residential only: replace extg footing with new concrete footing and relocate plywood shear wall. add new ada bathroom in the 1 floor. revision to app#201603182483Details
residential only: replace extg footing with new concrete footing and relocate plywood shear wall. add new ada bathroom in the 1 floor. revision to app#201603182483 | $40,000 |
| Dec 19, 2017 | Completed final sign-off Jan 2020 | 1294 Vallejo St | revision to pa #201603182484. replace existing footing with new concrete footing and relocate plywood shearwall. add new ada bathroom in the first floor (commercial) maher naDetails
revision to pa #201603182484. replace existing footing with new concrete footing and relocate plywood shearwall. add new ada bathroom in the first floor (commercial) maher na | $20,000 |
| Sep 14, 2017 | Expired or cancelled cancelled Oct 2019 | 5027 California St | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $65,000 |
| Aug 18, 2017 | Never finaled issued Aug 2017, no final | 301 Crescent Ct | tile replacement in vanity area and bathroom, bathroom, retile shower, and toilet replacement.Details
tile replacement in vanity area and bathroom, bathroom, retile shower, and toilet replacement. | $3,000 |
| Dec 20, 2016 | Completed final sign-off Jul 2019 | 1400 Grant Av | commercial space, ground floor work only. soft story retrofit , 2 steel frames and footing, 7 plywood shear walls, epoxy bolt. add 1 handicap bath, replace 9 entrance hardwares.Details
commercial space, ground floor work only. soft story retrofit , 2 steel frames and footing, 7 plywood shear walls, epoxy bolt. add 1 handicap bath, replace 9 entrance hardwares. | $85,000 |
| Dec 20, 2016 | Completed final sign-off Jul 2019 | 1400 Grant Av | residential ground floor only. soft story retrofit, 2 steel frames and footing, 7 plywood shear walls, epoxy bolts. add 1 handicap bathroom, replace 9 entrance door handware.Details
residential ground floor only. soft story retrofit, 2 steel frames and footing, 7 plywood shear walls, epoxy bolts. add 1 handicap bathroom, replace 9 entrance door handware. | |
| Dec 16, 2016 | Completed final sign-off Sep 2017 | 85 Anzavista Av | construct 7- 24" diameter drilled piers and grade beams to reinforce existing retaining walls at rear yardDetails
construct 7- 24" diameter drilled piers and grade beams to reinforce existing retaining walls at rear yard | $75,000 |
| Aug 12, 2016 | Completed final sign-off Mar 2017 | 2870 Sacramento St | revise shear walls location to pa#2016-0523-8096. n/a ordinance #155-13Details
revise shear walls location to pa#2016-0523-8096. n/a ordinance #155-13 | |
| May 23, 2016 | Completed final sign-off Mar 2017 | 2870 Sacramento St | soft storey retrofit including adding 2 steel frame, plywood shear walls and anchor bolts to (e) footing. new concrete footing, all works in garage.Details
soft storey retrofit including adding 2 steel frame, plywood shear walls and anchor bolts to (e) footing. new concrete footing, all works in garage. | $65,000 |
| May 17, 2016 | Never finaled issued Jan 2017, no final | 1197 Dolores St | renovate and add bath @ dwelling unit @ 1/fl. consist living/dining area, kitchen & bath. new unit to be fully sprinklers (1/fl only). remodel kitchen at unit 1197 @ 2/fl. replace windows @1/fl & 2/fl, facing the street. infill @ lightwell,Details
renovate and add bath @ dwelling unit @ 1/fl. consist living/dining area, kitchen & bath. new unit to be fully sprinklers (1/fl only). remodel kitchen at unit 1197 @ 2/fl. replace windows @1/fl & 2/fl, facing the street. infill @ lightwell, | $50,000 |
| May 17, 2016 | Never finaled issued Jan 2017, no final | 3780 25th St | per unit legalization ordinance# 43-14. legalize existing 1st floor dwelling unit.Details
per unit legalization ordinance# 43-14. legalize existing 1st floor dwelling unit. | $50,000 |
| Apr 13, 2016 | Completed final sign-off Nov 2016 | 3775 25th St | revision to pa 2015/0805/3454, change storage closet to a showerDetails
revision to pa 2015/0805/3454, change storage closet to a shower | $300 |
| Mar 18, 2016 | Completed final sign-off Feb 2020 | 1294 Vallejo St | seismic retrofit of soft storey- comply with sfbc 34b mandatory seismic retrofit iebc a4 - residentail. n/a maher ordinanceDetails
seismic retrofit of soft storey- comply with sfbc 34b mandatory seismic retrofit iebc a4 - residentail. n/a maher ordinance | $35,000 |
| Mar 18, 2016 | Completed final sign-off Feb 2020 | 1294 Vallejo St | seismic retrofit of soft storey- comply with sfbc 34b mandatory seismic retrofit iebc a4 - commercialDetails
seismic retrofit of soft storey- comply with sfbc 34b mandatory seismic retrofit iebc a4 - commercial | $9,000 |
| Oct 16, 2015 | Completed final sign-off Oct 2016 | 195 18th Av | to obtain final inspection for work approved under pa #201310300698. all work is complete.Details
to obtain final inspection for work approved under pa #201310300698. all work is complete. | |
| Aug 5, 2015 | Completed final sign-off Nov 2016 | 3775 25th St | renovate ground level plan to include an exercise room & bathroom. work includes excavation, new foundation, new electrical, plumb, heating, & minor modifiations to the plan below the overhang of the story directly above.Details
renovate ground level plan to include an exercise room & bathroom. work includes excavation, new foundation, new electrical, plumb, heating, & minor modifiations to the plan below the overhang of the story directly above. | $39,000 |
| Aug 13, 2014 | Never finaled issued Sep 2014, no final | 3324 Broderick St | add recreation room & workshop at ground floor including:toilet, sink. new ceiling lights, wall heaters. ** maher: compliance with ordinance no# 155-13 not required **Details
add recreation room & workshop at ground floor including:toilet, sink. new ceiling lights, wall heaters. ** maher: compliance with ordinance no# 155-13 not required ** | $60,000 |
| Oct 30, 2013 | Completed final sign-off Oct 2016 | 195 18th Av | remodel (e) bathroom. replace bathtub, sink, & toilet.Details
remodel (e) bathroom. replace bathtub, sink, & toilet. | $8,000 |
| Dec 23, 2004 | Completed final sign-off Dec 2004 | 41 Santa Monica Wy | renew 200302207869 for final inspection onlyDetails
renew 200302207869 for final inspection only | |
| Apr 1, 2004 | Completed final sign-off Apr 2004 | 2499 34th Av | renew app #200303311099Details
renew app #200303311099 |