Rowland Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Aug 2026
- Last 24 months
- 8 permits filed
30 permits since 2000: 26 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 in progress. Typically 5 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2025 | In progress issued Jun 2026 | 140 Chicago Wy | to comply with nov# 202431573. add 2 bedrooms & 1 bathroom on the ground floor,remove the 1-story wet bar addition at the northwest,relocate (shift) existing 2-story deck with stairs to be 3 feet away from property lineDetails
to comply with nov# 202431573. add 2 bedrooms & 1 bathroom on the ground floor,remove the 1-story wet bar addition at the northwest,relocate (shift) existing 2-story deck with stairs to be 3 feet away from property line | $20,000 |
| Jun 12, 2025 | Completed final sign-off Nov 2025 | 2130 34th Av | extend existing wood deck to rear the yard of the existing building at 2nd floor with stairs. change (e) bedroom to be (n) home office at ground levelDetails
extend existing wood deck to rear the yard of the existing building at 2nd floor with stairs. change (e) bedroom to be (n) home office at ground level | $12,000 |
| Aug 19, 2024 | Completed final sign-off Oct 2024 | 416 Wilde Av | obtaining a permit for the 2nd floor window replacement in kind. same opening. [2 aluminum horizonal sliders to fiberglass] and removal of the infill underneath the rear deck as per complaint #202424671Details
obtaining a permit for the 2nd floor window replacement in kind. same opening. [2 aluminum horizonal sliders to fiberglass] and removal of the infill underneath the rear deck as per complaint #202424671 | $500 |
| Oct 11, 2022 | Completed final sign-off Mar 2024 | 1962 43rd Av | replace (e) window with new sliding door at rear of house at 2/f. construct new deck with stairscase at rear of house.Details
replace (e) window with new sliding door at rear of house at 2/f. construct new deck with stairscase at rear of house. | $8,700 |
| Jul 14, 2017 | Completed final sign-off Dec 2017 | 472 Nevada St | construct (n) deck at rear of bldg (approx 14x13). convert (e) window to window & door.Details
construct (n) deck at rear of bldg (approx 14x13). convert (e) window to window & door. | $18,000 |