Back to bathroom remodel contractors
Rowland Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Aug 2026
- Last 24 months
- 8 permits filed
30 permits since 2000: 26 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 10 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2025 | In progress issued Jun 2026 | 140 Chicago Wy | to comply with nov# 202431573. add 2 bedrooms & 1 bathroom on the ground floor,remove the 1-story wet bar addition at the northwest,relocate (shift) existing 2-story deck with stairs to be 3 feet away from property lineDetails
to comply with nov# 202431573. add 2 bedrooms & 1 bathroom on the ground floor,remove the 1-story wet bar addition at the northwest,relocate (shift) existing 2-story deck with stairs to be 3 feet away from property line | $20,000 |
| Oct 7, 2024 | Completed final sign-off Dec 2024 | 2030 47th Av | remodel upstairs bathroom/kitchen same location. install 10 recess lights, new tub, sink, cabinet, toilet. change 2 front windows and 6 windows in the rear.Details
remodel upstairs bathroom/kitchen same location. install 10 recess lights, new tub, sink, cabinet, toilet. change 2 front windows and 6 windows in the rear. | $25,000 |
| Aug 19, 2021 | Completed final sign-off Mar 2022 | 2944 Gough St | unit #4: remodel (e) kitchen: replace counter & cabinets. remodel (e) bathroom & add lavatory in toilet room. all work at 3rd floor.Details
unit #4: remodel (e) kitchen: replace counter & cabinets. remodel (e) bathroom & add lavatory in toilet room. all work at 3rd floor. | $30,000 |
| May 24, 2021 | Completed final sign-off Sep 2021 | 536 18th Av | remodel (e) kitchen & convert (e) half bathroom into full bath. all work at 3rd floor. comply with complaint 202060433Details
remodel (e) kitchen & convert (e) half bathroom into full bath. all work at 3rd floor. comply with complaint 202060433 | $23,000 |
| Oct 22, 2020 | Completed final sign-off Jun 2021 | 2643 46th Av | 1/f: construct 1 bedroom, 1 bathroom. remodel of family room & relocated washer/dryer.Details
1/f: construct 1 bedroom, 1 bathroom. remodel of family room & relocated washer/dryer. | $45,000 |
| Jul 10, 2020 | Completed final sign-off Jun 2021 | 2643 46th Av | remodel bath and kitchen. same location. update elec and plumbing. . no wall change. bathroom is about 5' x 11 kitchen is 11'x12Details
remodel bath and kitchen. same location. update elec and plumbing. . no wall change. bathroom is about 5' x 11 kitchen is 11'x12 | $20,000 |
| Jun 25, 2018 | Completed final sign-off Jan 2019 | 247 Schwerin St | remove/replacd new sheetrock in study rm, excercise rm, remodel bath rm at ground fl. remodel (e) kitchen (2) bath rm. remove replace sheet rock w/new at whole 1st fl. remodel (e) 2 bath rm. remove/replace sheetrock w/ new at whole 2nd fl.Details
remove/replacd new sheetrock in study rm, excercise rm, remodel bath rm at ground fl. remodel (e) kitchen (2) bath rm. remove replace sheet rock w/new at whole 1st fl. remodel (e) 2 bath rm. remove/replace sheetrock w/ new at whole 2nd fl. | $60,000 |
| Apr 9, 2018 | Expired or cancelled cancelled Sep 2018 | 17 Sonoma St | 2nd fl bathroom remodel. new vanity, toilet, shower head, floor tile & wall 5x8. lighting per cec 150.0 (k).Details
2nd fl bathroom remodel. new vanity, toilet, shower head, floor tile & wall 5x8. lighting per cec 150.0 (k). | $10,000 |
| Dec 18, 2015 | Completed final sign-off Mar 2016 | 1838 Broadway | remodel existing kitchen. 1 bath room, rewire lighting at 3rd flDetails
remodel existing kitchen. 1 bath room, rewire lighting at 3rd fl | $23,000 |
| Dec 18, 2015 | Completed final sign-off Mar 2016 | 1836 Broadway | remodel existing kitchen. 1 bath, rewire lighting at 2nd flDetails
remodel existing kitchen. 1 bath, rewire lighting at 2nd fl | $23,000 |
| Dec 23, 2014 | Completed final sign-off Sep 2015 | 42 West View Av | 1/f - kitchen and 1 1/2 bathrooms remodel- and replace 2 non-street facing windows in each bedrooms; u factor .4 ; comply with cec150.0(k)3 & 5Details
1/f - kitchen and 1 1/2 bathrooms remodel- and replace 2 non-street facing windows in each bedrooms; u factor .4 ; comply with cec150.0(k)3 & 5 | $15,000 |
| Aug 14, 2014 | Never finaled issued Aug 2014, no final | 42 West View Av | construct one bedroom, one family room, storage room and one full bath room, all work at ground floor.Details
construct one bedroom, one family room, storage room and one full bath room, all work at ground floor. | $32,000 |
| Dec 9, 2013 | Completed final sign-off Jul 2014 | 15 Teresita Bl | master bathroom, replace sink, shower & toilet, patching & replace, tiles, kitchen add 4 recess lights, lighting to comply with cec 150(k)Details
master bathroom, replace sink, shower & toilet, patching & replace, tiles, kitchen add 4 recess lights, lighting to comply with cec 150(k) | $25,000 |