Back to kitchen remodel contractors
Ronald H Campos
- Based in
- Daly City
- On San Francisco permits
- Jul 2005 to Jun 2017
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 20 days from filing to permit and 964 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2011 | Completed final sign-off Mar 2014 | 1210 34th Av | remodel (e) kitchen: replace cabinets, fixtures, appliances, no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting shall be high efficacy. repair & replace siding in (e) lightwell in-kind, approx. 400 sf of south wall, not visible from street.Details
remodel (e) kitchen: replace cabinets, fixtures, appliances, no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting shall be high efficacy. repair & replace siding in (e) lightwell in-kind, approx. 400 sf of south wall, not visible from street. | $15,000 |