Back to kitchen remodel contractors
Rokit Construction Company
- Based in
- Daly City
- On San Francisco permits
- Dec 2010 to Aug 2017
- Last 24 months
- 0 permits filed
42 permits since 2000: 36 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 18 completed, 1 never finaled. Typically 7 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2017 | Completed final sign-off Oct 2017 | 619 Clayton St | remodel extg bathroom and unit #4: kitchen in unit #4 on 3rd floor.Details
remodel extg bathroom and unit #4: kitchen in unit #4 on 3rd floor. | $20,000 |
| May 31, 2017 | Completed final sign-off Oct 2017 | 1458 Hayes St | revision to 201705267762. correct address to job site from 1460 to 1458 hayes. keep the (e) wall between kitchen and living/dining roomDetails
revision to 201705267762. correct address to job site from 1460 to 1458 hayes. keep the (e) wall between kitchen and living/dining room | |
| May 26, 2017 | Completed final sign-off Oct 2017 | 1460 Hayes St | remodel existing kitchen, bathrooms, upgrade electrical panel. add bedroomDetails
remodel existing kitchen, bathrooms, upgrade electrical panel. add bedroom | $25,000 |
| Mar 10, 2017 | Completed final sign-off Apr 2017 | 901 Faxon Av | new permit for windos (2) in kitchen and anywhere else there are new windows going in. fire culking penetration to garage, not visible from the street on the side on walk way.Details
new permit for windos (2) in kitchen and anywhere else there are new windows going in. fire culking penetration to garage, not visible from the street on the side on walk way. | $500 |
| Feb 10, 2017 | Completed final sign-off Apr 2017 | 901 Faxon Av | kitchen remodel: replace appliances, cabinets, countertop, remove non-bearing partition for pass through; no walls to be altered or removed.Details
kitchen remodel: replace appliances, cabinets, countertop, remove non-bearing partition for pass through; no walls to be altered or removed. | $10,000 |
| Nov 14, 2016 | Never finaled issued Jan 2017, no final | 1389 21st Av | ground floor renovation, relayout (e) ground floor with one bedroom, one bath & family room with 2 car parking. relocate (e) kitchen & convert dining room to bedroom on 2nd and 3rd floorDetails
ground floor renovation, relayout (e) ground floor with one bedroom, one bath & family room with 2 car parking. relocate (e) kitchen & convert dining room to bedroom on 2nd and 3rd floor | $45,000 |
| May 27, 2016 | Completed final sign-off Oct 2016 | 619 Clayton St | unit #3: remodel kitchennette, (n) cabinets, electrcial, flooring, appliances.Details
unit #3: remodel kitchennette, (n) cabinets, electrcial, flooring, appliances. | $10,000 |
| Jan 21, 2016 | Completed final sign-off Aug 2016 | 619 Clayton St | 2nd floor: unit 2: remodel (e) kitchen and bathroom.Details
2nd floor: unit 2: remodel (e) kitchen and bathroom. | $15,000 |
| Jul 31, 2015 | Completed final sign-off Feb 2016 | 50 Eastman St | kitchen remodel, remodel full bath & 1/2 bath, install new electrical throughout existing walls to remain, patch plaster walls as needed. convert bedroom to livingroom.Details
kitchen remodel, remodel full bath & 1/2 bath, install new electrical throughout existing walls to remain, patch plaster walls as needed. convert bedroom to livingroom. | $35,000 |
| Jun 12, 2015 | Completed final sign-off Aug 2015 | 49 Missouri St | replace kitchen cabinets, no relocation of electrical of plumbing fixtures, (e) disable accessibility of kitchen shall be maintained. no structural work.Details
replace kitchen cabinets, no relocation of electrical of plumbing fixtures, (e) disable accessibility of kitchen shall be maintained. no structural work. | $10,000 |
| Feb 24, 2015 | Completed final sign-off Nov 2016 | 1594 Golden Gate Av | convert commercial unit into residential apartment. conersion includes: 1 bedroom, 1 bathroom, 1 kitchen and living space. project to comply with section 307(h)(1)(d) conversion of non-conforming uses residential uses. shall comply with nov. #200921583 and nov. #200837721 n/a for maher ordinance.Details
convert commercial unit into residential apartment. conersion includes: 1 bedroom, 1 bathroom, 1 kitchen and living space. project to comply with section 307(h)(1)(d) conversion of non-conforming uses residential uses. shall comply with nov. #200921583 and nov. #200837721 n/a for maher ordinance. | $35,000 |
| Jan 8, 2015 | Completed final sign-off May 2015 | 1265 Union St | kitchen remodel, remodel full bath & 1/2 bath per plan, install new electrical outlets and lights throughout unit; patch plaster walls as needed.Details
kitchen remodel, remodel full bath & 1/2 bath per plan, install new electrical outlets and lights throughout unit; patch plaster walls as needed. | $3,500 |
| Jan 15, 2014 | Completed final sign-off Apr 2014 | 1592 Golden Gate Av | to comply w/ nov #'s 200799235, 200797936, 20079255, 200678833 & 200837721. remodel 3 bathrooms, kitchen, laundry, water heater & furnace on top fl.Details
to comply w/ nov #'s 200799235, 200797936, 20079255, 200678833 & 200837721. remodel 3 bathrooms, kitchen, laundry, water heater & furnace on top fl. | $30,000 |
| Aug 19, 2013 | Completed final sign-off May 2014 | 2713 Folsom St | comply with his violations 200673867, 200234065, 201122481, 200455287, 200451686 - customer brought new set 8/22/13 h.s. kitchen remodel include demolition of non-bearing wall between kitchen and living room. bathroom remodel:convert bathroom/water closet room to one full bath 1/2 bath.Details
comply with his violations 200673867, 200234065, 201122481, 200455287, 200451686 - customer brought new set 8/22/13 h.s. kitchen remodel include demolition of non-bearing wall between kitchen and living room. bathroom remodel:convert bathroom/water closet room to one full bath 1/2 bath. | $50,000 |
| Apr 2, 2013 | Completed final sign-off Jun 2013 | 114 Everson St | kitchen remodel open part of wall between living room & kitchen. install new psl beam. install new closet in bedroom.Details
kitchen remodel open part of wall between living room & kitchen. install new psl beam. install new closet in bedroom. | $8,000 |
| May 21, 2012 | Completed final sign-off Sep 2012 | 19 Forest View Dr | remodel (e) bathroom & kitchen at 2nd. floor plan. in-kind.Details
remodel (e) bathroom & kitchen at 2nd. floor plan. in-kind. | $12,000 |
| Feb 17, 2012 | Completed final sign-off Jun 2012 | 557 10th Av | remodel kitchen & powder room at ground floor - replace counter, cabinet, elec, appliances, sink, toilet, light, fan. remodle 2nd floor hallway & bath - new tub, sink, toilet, light, fan.Details
remodel kitchen & powder room at ground floor - replace counter, cabinet, elec, appliances, sink, toilet, light, fan. remodle 2nd floor hallway & bath - new tub, sink, toilet, light, fan. | $13,000 |
| Jul 12, 2011 | Completed final sign-off Nov 2011 | 455 Bowdoin St | 1)remodel extg bathrooms and kitchen at 2nd floor.2) 3 bedrooms,2 bath rooms,1 family and storage room to be constructed at ground floor per plan.Details
1)remodel extg bathrooms and kitchen at 2nd floor.2) 3 bedrooms,2 bath rooms,1 family and storage room to be constructed at ground floor per plan. | $70,000 |
| Dec 13, 2010 | Completed final sign-off Feb 2012 | 1941 Cabrillo St | bathroom, kitchen, home office. interior remodel and alteration of dwelling units 1941 and 1943 at 3rd and 2nd floors. relocation of heaters and waterheaters at garage. new hallway at 1st fl connecting entry with garageDetails
bathroom, kitchen, home office. interior remodel and alteration of dwelling units 1941 and 1943 at 3rd and 2nd floors. relocation of heaters and waterheaters at garage. new hallway at 1st fl connecting entry with garage | $60,000 |