Back to kitchen remodel contractors
Rodriguez Sc Construction
- Based in
- Brisbane
- On San Francisco permits
- May 2000 to Mar 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 3 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 50 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2013 | Completed final sign-off May 2013 | 1800 23rd Av | replace existing base & wall cabinets, kitchen at unit 1; maximum 50% of total wattage of permanently installed lighting shall be high efficacyDetails
replace existing base & wall cabinets, kitchen at unit 1; maximum 50% of total wattage of permanently installed lighting shall be high efficacy | $8,750 |
| Apr 26, 2012 | Expired or cancelled expired Aug 2013 | 1800 23rd Av | #4- replace (e) counter top & base (kitchenDetails
#4- replace (e) counter top & base (kitchen | $7,500 |