Rockland Construction Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Jun 2026
- Last 24 months
- 5 permits filed
45 permits since 2000: 33 completed, 4 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 1 days from filing to permit and 257 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2022 | Completed final sign-off Feb 2023 | 151 Venus St | remodel/relocate kitchen and bath, add full bath, relocate stairs enclose patio, remove walls, add a deck and stair at rear on 2nd floor. add 2 bedroom, a full bath, media and kitchenette on 1st floor. replace w/ aluminum windows and entry door at front. replace vinyl doors at rear. replace water heDetails
remodel/relocate kitchen and bath, add full bath, relocate stairs enclose patio, remove walls, add a deck and stair at rear on 2nd floor. add 2 bedroom, a full bath, media and kitchenette on 1st floor. replace w/ aluminum windows and entry door at front. replace vinyl doors at rear. replace water he | $200,000 |
| Dec 1, 2017 | Never finaled issued Dec 2017, no final | 2174 28th Av | 1st fl - convert part 0f (e) garge and tunnel entrance to living space and add shear walls, media room, laundry, storage and bathroom; 2nd fl - add roof over stair, install skylight, remove main door, and create open visual and spatial connection between floorsDetails
1st fl - convert part 0f (e) garge and tunnel entrance to living space and add shear walls, media room, laundry, storage and bathroom; 2nd fl - add roof over stair, install skylight, remove main door, and create open visual and spatial connection between floors | $60,000 |
| Jul 31, 2017 | Completed final sign-off Feb 2018 | 2115 16th Av | remodel/relocate kitchen & bath, add a full bath, convert dining to bedroom, remove interior stairs, replace main stairs, add skylight on 2/f, add family/study/2 full bath, entry doors on 1/fl, replace with aluminum clad wood windows in kind @ front, vinyl window @ rear, replace water heater,furnaceDetails
remodel/relocate kitchen & bath, add a full bath, convert dining to bedroom, remove interior stairs, replace main stairs, add skylight on 2/f, add family/study/2 full bath, entry doors on 1/fl, replace with aluminum clad wood windows in kind @ front, vinyl window @ rear, replace water heater,furnace | $98,000 |