Back to pergola or trellis contractors
Rockaway Construction Inc.
- Based in
- Pacifica
- On San Francisco permits
- Aug 2003 to May 2026
- Last 24 months
- 3 permits filed
78 permits since 2000: 60 completed, 3 in progress, 7 never finaled, 8 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for pergola or trellis across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Pergola or trellis permits
1 pergola or trellis permit: 1 expired or cancelled. Typically 14 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2009 | Expired or cancelled expired Aug 2011 | 729 Kirkwood Av | revisio to 200703206741 by eliminating exterior trellis and therefore special inspection requirements for item 2 bolts installed in conc, 5al-single pass fillet welds and 7 structural masonry as noted on drawing.Details
revisio to 200703206741 by eliminating exterior trellis and therefore special inspection requirements for item 2 bolts installed in conc, 5al-single pass fillet welds and 7 structural masonry as noted on drawing. |