Back to bathroom remodel contractors
Rockaway Construction Inc.
- Based in
- Pacifica
- On San Francisco permits
- Aug 2003 to May 2026
- Last 24 months
- 3 permits filed
78 permits since 2000: 60 completed, 3 in progress, 7 never finaled, 8 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 10 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 9, 2023 | Completed final sign-off Nov 2023 | 88 Rossi Av | kitchen remodel. change floor. cabinet, fixtures, relocate non load bearing wall. bath remodel;. closet remodel.Details
kitchen remodel. change floor. cabinet, fixtures, relocate non load bearing wall. bath remodel;. closet remodel. | $50,000 |
| Oct 20, 2022 | Completed final sign-off Jul 2023 | 2841 Lincoln Wy | kitchen & bath remodel.Details
kitchen & bath remodel. | $11,000 |
| Mar 21, 2022 | Completed final sign-off Jun 2022 | 2942 Turk Bl | bathroom in kind remodel.Details
bathroom in kind remodel. | $60,000 |
| Sep 26, 2017 | Never finaled issued Nov 2017, no final | 74 Brady St | #4: demo walls & fixtuers per plan. remodel (e) kitchen, bathrooms, & laundry room. new electrical & plumbing per plan.Details
#4: demo walls & fixtuers per plan. remodel (e) kitchen, bathrooms, & laundry room. new electrical & plumbing per plan. | $200,000 |
| Aug 18, 2016 | Completed final sign-off Oct 2016 | 1151 Washington St | add wall to family room to build new bathroom. new fixtures, electrical. trench through (e) concrete slab to tie into (e) drain; maher ord 155-13 n/aDetails
add wall to family room to build new bathroom. new fixtures, electrical. trench through (e) concrete slab to tie into (e) drain; maher ord 155-13 n/a | $10,000 |
| Jun 11, 2013 | Never finaled issued Jun 2013, no final | 314 Walnut St | interior remodel: remodel (e) baths kitchen, new bath, new stair, new electrical, structural upgrades. exterior improvements: new windows, new skylights, new dormers, new rear stair & wall reduction.Details
interior remodel: remodel (e) baths kitchen, new bath, new stair, new electrical, structural upgrades. exterior improvements: new windows, new skylights, new dormers, new rear stair & wall reduction. | $200,000 |
| Mar 11, 2013 | Completed final sign-off Oct 2013 | 139 Peralta Av | convert (e) 475 sq ft basement level storage to (n) habitable space, including (n) entry foyer, (n) one master bedroom, (n) one bathroom, (n) 4 closets & laundry closet. (n) internal stairs between basement & 1st level. remove (e) exterior front entry stairs. (n) entry door and windows at front bsmtDetails
convert (e) 475 sq ft basement level storage to (n) habitable space, including (n) entry foyer, (n) one master bedroom, (n) one bathroom, (n) 4 closets & laundry closet. (n) internal stairs between basement & 1st level. remove (e) exterior front entry stairs. (n) entry door and windows at front bsmt | $65,000 |
| Aug 9, 2012 | Expired or cancelled expired Sep 2013 | 601 Van Ness Av | unit #241-remodel bathroom in kind. provide high efficacy lightingDetails
unit #241-remodel bathroom in kind. provide high efficacy lighting | $20,000 |
| Jan 27, 2012 | Completed final sign-off Jul 2012 | 154 29th Av | replace (14) windows - marvin aluminum clad wood windows (12) replace bathroom windows -milgard ultra fiberglass window (2)Details
replace (14) windows - marvin aluminum clad wood windows (12) replace bathroom windows -milgard ultra fiberglass window (2) | $10,000 |
| Aug 18, 2008 | Completed final sign-off Apr 2011 | 1158 Haight St | work @ unit# 4 only. replace cabinets, add recessed lighting in kitchen , bath & family room. replace windows in bedrooms, hallway & kitchen, replace sliding glass door in kind. replace tile in bath. windows not visible from street.Details
work @ unit# 4 only. replace cabinets, add recessed lighting in kitchen , bath & family room. replace windows in bedrooms, hallway & kitchen, replace sliding glass door in kind. replace tile in bath. windows not visible from street. | $11,000 |
| Jul 20, 2005 | Completed final sign-off Feb 2006 | 216 Anzavista Av | remodel 2 existing bathrooms retile install new cabinets sinks toiletDetails
remodel 2 existing bathrooms retile install new cabinets sinks toilet | $25,000 |
| Sep 13, 2004 | Completed final sign-off Jan 2005 | 147 Parker Av | revised, permit#200404211895. interior kitchen, living, master bath arrangment. window placement chaDetails
revised, permit#200404211895. interior kitchen, living, master bath arrangment. window placement cha | $10,000 |
| Oct 14, 2003 | Completed final sign-off Apr 2004 | 90 Rossi Av | kitchen & bath remodelDetails
kitchen & bath remodel | $100,000 |