Rock & Iron Builders Llc
- Based in
- Pacifica
- On San Francisco permits
- Jul 2026 to Jul 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 34 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2026 | Completed final sign-off Sep 2026 | 126 Lisbon St | install 5/8" gyp-x fire rated drywall in corridor with insulation. install wood pt frence in backyard under staircase less than 50 % and less than 6 feet.Details
install 5/8" gyp-x fire rated drywall in corridor with insulation. install wood pt frence in backyard under staircase less than 50 % and less than 6 feet. | $15,000 |