Back to kitchen remodel contractors
Rock Construction And Consulting Inc
- Based in
- Redwood City
- On San Francisco permits
- Nov 2020 to Apr 2026
- Last 24 months
- 2 permits filed
5 permits since 2000: 1 completed, 2 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 in progress. Typically 0 days from filing to permit and 414 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2025 | In progress issued Aug 2025 | 357 Collingwood St | replacing in same location dryrott bathroom wall and kitchenfuring wall. both are same location. also, sheetrock @ceiling that had mold. replace wood framing, insulation and sheetrock at areas described above. remodel (1) kitchen and (1) bath.Details
replacing in same location dryrott bathroom wall and kitchenfuring wall. both are same location. also, sheetrock @ceiling that had mold. replace wood framing, insulation and sheetrock at areas described above. remodel (1) kitchen and (1) bath. | $25,000 |
| Dec 14, 2020 | Completed final sign-off Feb 2022 | 366 Collingwood St | unit#366, remodel kitchen, no change in wall and opening layout. to abate complaint no. 202069081.Details
unit#366, remodel kitchen, no change in wall and opening layout. to abate complaint no. 202069081. | $15,000 |