Rock And Rose Landscaping & Birkmyer
- Based in
- San Francisco
- On San Francisco permits
- Dec 2005 to Oct 2024
- Last 24 months
- 1 permit filed
35 permits since 2000: 23 completed, 5 never finaled, 7 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 5 completed, 2 expired or cancelled. Typically 62 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2021 | Completed final sign-off May 2022 | 230 Valley St | repair in kind. renovate (e) rear yard deck: replace (e) deck boards and guardrail, leave extg framing, ledger at residence and posts as is. replace extg stairway deck to grade with new realigned stairs. alter deck framing at stairway location per plan.Details
repair in kind. renovate (e) rear yard deck: replace (e) deck boards and guardrail, leave extg framing, ledger at residence and posts as is. replace extg stairway deck to grade with new realigned stairs. alter deck framing at stairway location per plan. | $25,000 |
| Jul 1, 2020 | Completed final sign-off Mar 2021 | 121 San Pablo Av | new concrete retaining walls to replace ex. p.t. ret. walls new concrete stairs to replace ex. timber stairs. new brick on sand & concrete paving new plantingsDetails
new concrete retaining walls to replace ex. p.t. ret. walls new concrete stairs to replace ex. timber stairs. new brick on sand & concrete paving new plantings | $75,000 |
| Aug 23, 2019 | Completed final sign-off Dec 2019 | 1521 Shrader St | revision to pa 201807316028. change of layout at deck stair and set benchDetails
revision to pa 201807316028. change of layout at deck stair and set bench | |
| Jun 1, 2016 | Expired or cancelled withdrawn Dec 2016 | 734 39th Av | building a landing, concrete piers, stairs and railing at rear building. construction rear deck/stairs)Details
building a landing, concrete piers, stairs and railing at rear building. construction rear deck/stairs) | $12,000 |
| Aug 14, 2014 | Completed final sign-off Sep 2014 | 2601 Broadway | revision appl 2014.0702.0322. reduce scope of work to omit wall and stair improvement at front yard. existing condition shall remain. original appl. 2013.0225.0852. revision to 2013-0731-3264Details
revision appl 2014.0702.0322. reduce scope of work to omit wall and stair improvement at front yard. existing condition shall remain. original appl. 2013.0225.0852. revision to 2013-0731-3264 | |
| Jul 31, 2013 | Completed final sign-off Sep 2014 | 2601 Broadway | new retaining walls, stairs, handrails, planting, irrigation and lighting.Details
new retaining walls, stairs, handrails, planting, irrigation and lighting. | $50,000 |
| Feb 25, 2013 | Expired or cancelled expired Sep 2014 | 2601 Broadway | re-finish (e) stairs, add handrail, new metal gate & fire pit in rear yard. all exterior work only. build stucco fence.Details
re-finish (e) stairs, add handrail, new metal gate & fire pit in rear yard. all exterior work only. build stucco fence. | $20,000 |