Back to kitchen remodel contractors
Robert B Lewis Renovations
- Based in
- San Francisco
- On San Francisco permits
- Jul 2009 to Mar 2026
- Last 24 months
- 4 permits filed
31 permits since 2000: 27 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 in progress. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2026 | In progress issued Mar 2026 | 1170 Sacramento St | unit 7d: remove non-structural partition between dining room & living room. remodel kitchen all appliances in (e) locations. remodel 3 full baths and 1 powder 1/2 bath. refinish hardwood floors, paint throughout. new outlets and lighting in kitchen and bath.Details
unit 7d: remove non-structural partition between dining room & living room. remodel kitchen all appliances in (e) locations. remodel 3 full baths and 1 powder 1/2 bath. refinish hardwood floors, paint throughout. new outlets and lighting in kitchen and bath. | $195,000 |
| Aug 22, 2022 | Completed final sign-off Dec 2022 | 1000 Mason St | unit #205: fixture and finish replacement for one kitchen and one bath. no structural work.Details
unit #205: fixture and finish replacement for one kitchen and one bath. no structural work. | $65,000 |
| Apr 26, 2022 | Completed final sign-off Dec 2022 | 1000 Mason St | unit #302: fixture and finish replacement for 3 bathrooms and one kitchen. no structural work.Details
unit #302: fixture and finish replacement for 3 bathrooms and one kitchen. no structural work. | $75,000 |
| Dec 11, 2020 | Completed final sign-off Apr 2021 | 1000 Mason St | unit 505 - kitchen remodle in-kind - fixture and finish replace. no change in wall and layout.Details
unit 505 - kitchen remodle in-kind - fixture and finish replace. no change in wall and layout. | $32,000 |
| Dec 17, 2018 | Completed final sign-off Jun 2019 | 1000 Mason St | apt 204: kitchen & bathroom remodel. new fixtures and finish replacement.Details
apt 204: kitchen & bathroom remodel. new fixtures and finish replacement. | $35,000 |
| Feb 3, 2017 | Completed final sign-off Aug 2017 | 2222 Bay St | remove wall at (e) garage. partial remodel (e) kitchen open wall.Details
remove wall at (e) garage. partial remodel (e) kitchen open wall. | $50,000 |
| Oct 1, 2015 | Completed final sign-off Feb 2017 | 2000 Judah St | interior tenant improvement-adding a new bathroom and a breakroom to include full kitchen.Details
interior tenant improvement-adding a new bathroom and a breakroom to include full kitchen. | $36,800 |
| Mar 15, 2011 | Completed final sign-off May 2011 | 2111 Franklin St | 1 for 1 replacement of east wall cabinets in kitchen. sink to remain in current location. new countertops new lighting and electrical circuits. new washer and dryer in closet adjacent to kitchen. reconfigure of aforementioned closet system. no structurtal work. fire inpsection not required.Details
1 for 1 replacement of east wall cabinets in kitchen. sink to remain in current location. new countertops new lighting and electrical circuits. new washer and dryer in closet adjacent to kitchen. reconfigure of aforementioned closet system. no structurtal work. fire inpsection not required. | $16,000 |
| May 4, 2010 | Completed final sign-off Dec 2010 | 999 Green St | demo (e) non-bearing walls & partitions. replace with (n) as per drawings. one for one replacement for kitchen & bath.Details
demo (e) non-bearing walls & partitions. replace with (n) as per drawings. one for one replacement for kitchen & bath. | $205,000 |