Rittenbach Roofing & Waterproo
- Based in
- Tracy
- On San Francisco permits
- Jun 2022 to Apr 2026
- Last 24 months
- 4 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 58 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2025 | Completed final sign-off Sep 2025 | 1111 17th St | remove top cap sheet with sbs no hot works. install 3 in. 150 board insulation. overlay roof and parapets w/ white 60 mil tpo. roof in the vents, curbs and roof jacks with tpo. replace overflows with tpo overflows. installtpo nosing around the perimeter 21,722 sq ft with deck parapetsDetails
remove top cap sheet with sbs no hot works. install 3 in. 150 board insulation. overlay roof and parapets w/ white 60 mil tpo. roof in the vents, curbs and roof jacks with tpo. replace overflows with tpo overflows. installtpo nosing around the perimeter 21,722 sq ft with deck parapets | $159,515 |