Permit GraphShortlistSan Francisco building permits since 2000

Rittenbach Roofing & Waterproo

Contractor license
1077069
State license record
Based in
Tracy
On San Francisco permits
Jun 2022 to Apr 2026
Last 24 months
4 permits filed

5 permits since 2000: 5 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllDeck 1
FiledOutcomeAddressWork described on the permitDeclared cost
Apr 2, 2026Completed
final sign-off Jul 2026
2675 Geary Blreroofing for loading dock: no torch down.
Details
Permit
202604028759
Permit issued
Apr 2, 2026
Final sign-off
Jul 17, 2026

reroofing for loading dock: no torch down.

Open the permit page

$110,525
Jul 16, 2025Completed
final sign-off Sep 2025
1111 17th Stremove top cap sheet with sbs no hot works. install 3 in. 150 board insulation. overlay roof and parapets w/ white 60 mil tpo. roof in the vents, curbs and roof jacks with tpo. replace overflows with tpo overflows. installtpo nosing around the perimeter 21,722 sq ft with deck parapets
Details
Permit
202507160964
Permit issued
Jul 16, 2025
Final sign-off
Sep 12, 2025

remove top cap sheet with sbs no hot works. install 3 in. 150 board insulation. overlay roof and parapets w/ white 60 mil tpo. roof in the vents, curbs and roof jacks with tpo. replace overflows with tpo overflows. installtpo nosing around the perimeter 21,722 sq ft with deck parapets

Open the permit page

$159,515
Jul 16, 2025Completed
final sign-off Aug 2025
2675 Geary Blequipment roof 13: install tpo grave stop flashing around perimeter. overlay roof with 1/2 in. fan fold & 60 mil tpo mechanically attached. roof in the vents, curbs, drains and roof jacks w/tpo flashing. over hang roof 1: remove (e) membrane & gravel & dispose. apply water base primer.
Details
Permit
202507160961
Permit issued
Jul 16, 2025
Final sign-off
Aug 26, 2025

equipment roof 13: install tpo grave stop flashing around perimeter. overlay roof with 1/2 in. fan fold & 60 mil tpo mechanically attached. roof in the vents, curbs, drains and roof jacks w/tpo flashing. over hang roof 1: remove (e) membrane & gravel & dispose. apply water base primer.

Open the permit page

$76,774
Feb 27, 2025Completed
final sign-off Apr 2025
1424 18th Streroofing - no torch down
Details
Permit
202502271217
Permit issued
Feb 27, 2025
Final sign-off
Apr 14, 2025

reroofing - no torch down

Open the permit page

$45,930
Jun 16, 2022Completed
final sign-off Jul 2022
1828 Broadwayreroofing.
Details
Permit
202206166477
Permit issued
Jun 16, 2022
Final sign-off
Jul 19, 2022

reroofing.

Open the permit page

$87,512