Back to bathroom remodel contractors
Rising Design & Construction
- Based in
- San Rafael
- On San Francisco permits
- Dec 2011 to Apr 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 248 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2022 | Completed final sign-off Jan 2023 | 975 San Bruno Av | interior remodel including addtion of utility room and bath @ 1st floor (ground). upgrade dhw and fau.Details
interior remodel including addtion of utility room and bath @ 1st floor (ground). upgrade dhw and fau. | $75,000 |
| Aug 14, 2017 | Completed final sign-off Apr 2018 | 3956 18th St | kitchen and bathroom remodel. new toilet, vanity & shower receptor. new bath fan & lighting. kitchen - new cabinets, lightingDetails
kitchen and bathroom remodel. new toilet, vanity & shower receptor. new bath fan & lighting. kitchen - new cabinets, lighting | $60,000 |
| Jan 24, 2014 | Completed final sign-off Feb 2014 | 66 Caire Tr | minor bath remodel, replace fiberglass surround with new receptor, new mixing valve, new tile, no new electrical. fixture layout and wall layout to remain unchanged. no additional work.Details
minor bath remodel, replace fiberglass surround with new receptor, new mixing valve, new tile, no new electrical. fixture layout and wall layout to remain unchanged. no additional work. | $5,500 |
| Dec 13, 2011 | Never finaled issued Dec 2011, no final | 20 Chaves Av | one bathroom remodel, new plumbing fixtures, new shower pan, new electrical, 3 lights, 2 gfi, 1 fanDetails
one bathroom remodel, new plumbing fixtures, new shower pan, new electrical, 3 lights, 2 gfi, 1 fan | $18,000 |