Rising Design & Construction
- Based in
- San Rafael
- On San Francisco permits
- Dec 2011 to Apr 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2022 | Completed final sign-off Jan 2023 | 975 San Bruno Av | interior remodel including addtion of utility room and bath @ 1st floor (ground). upgrade dhw and fau.Details
interior remodel including addtion of utility room and bath @ 1st floor (ground). upgrade dhw and fau. | $75,000 |
| Aug 14, 2017 | Completed final sign-off Apr 2018 | 3956 18th St | kitchen and bathroom remodel. new toilet, vanity & shower receptor. new bath fan & lighting. kitchen - new cabinets, lightingDetails
kitchen and bathroom remodel. new toilet, vanity & shower receptor. new bath fan & lighting. kitchen - new cabinets, lighting | $60,000 |
| Sep 23, 2015 | Completed final sign-off Oct 2015 | 556 Chenery St | replace (1) one gable window with exact same shape & size. replace w/ painted fiberglass unit.Details
replace (1) one gable window with exact same shape & size. replace w/ painted fiberglass unit. | $4,000 |
| Jan 21, 2015 | Completed final sign-off Mar 2015 | 1271 Bosworth St | revision to appl #2013.0220.0571 - convert storage to home office @ ground floor, frame & drywall interior walls, add window, add electrical outlets.Details
revision to appl #2013.0220.0571 - convert storage to home office @ ground floor, frame & drywall interior walls, add window, add electrical outlets. | $9,000 |
| Jan 24, 2014 | Completed final sign-off Feb 2014 | 66 Caire Tr | minor bath remodel, replace fiberglass surround with new receptor, new mixing valve, new tile, no new electrical. fixture layout and wall layout to remain unchanged. no additional work.Details
minor bath remodel, replace fiberglass surround with new receptor, new mixing valve, new tile, no new electrical. fixture layout and wall layout to remain unchanged. no additional work. | $5,500 |
| May 20, 2013 | Completed final sign-off Aug 2013 | 244 Richland Av | construct new wall, new pass through existing wall. install gas fireplace.Details
construct new wall, new pass through existing wall. install gas fireplace. | $33,000 |
| Apr 19, 2013 | Completed final sign-off Aug 2013 | 244 Richland Av | install two solar panels 4'x8'(113 lbs.wt.) on top of back roof not visible from street.replace (e)water heater at garage,heater will either be seating on 18" ht.platform or the pilots & heating elements of heater be located at 18" minimum above floor. seismic strap at top & bottom of heater.Details
install two solar panels 4'x8'(113 lbs.wt.) on top of back roof not visible from street.replace (e)water heater at garage,heater will either be seating on 18" ht.platform or the pilots & heating elements of heater be located at 18" minimum above floor. seismic strap at top & bottom of heater. | $28,828 |
| Dec 13, 2011 | Never finaled issued Dec 2011, no final | 20 Chaves Av | one bathroom remodel, new plumbing fixtures, new shower pan, new electrical, 3 lights, 2 gfi, 1 fanDetails
one bathroom remodel, new plumbing fixtures, new shower pan, new electrical, 3 lights, 2 gfi, 1 fan | $18,000 |