Back to kitchen remodel contractors
Rise Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Feb 2018
- Last 24 months
- 0 permits filed
39 permits since 2000: 30 completed, 1 never finaled, 8 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 11 completed, 3 expired or cancelled. Typically 0 days from filing to permit and 155 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2017 | Completed final sign-off Dec 2017 | 3505 Pacific Av | remodeling kitchen & foure bathrooms. install new wood floor.Details
remodeling kitchen & foure bathrooms. install new wood floor. | $285,000 |
| Nov 17, 2016 | Completed final sign-off Sep 2017 | 1908 Filbert St | demo (e) bathroom wet bar & closets, new kitchen & island fixtrues. improve/expand bathroom & closets. no exterior alterations.Details
demo (e) bathroom wet bar & closets, new kitchen & island fixtrues. improve/expand bathroom & closets. no exterior alterations. | $83,486 |
| Apr 29, 2014 | Expired or cancelled expired Aug 2018 | 550 Clipper St | rear yard add'n. grade level: kitchen, dinning, living, 1/2 bath, deck w/roof deck above street level, modify stair.Details
rear yard add'n. grade level: kitchen, dinning, living, 1/2 bath, deck w/roof deck above street level, modify stair. | $50,000 |
| Apr 16, 2014 | Completed final sign-off Nov 2014 | 3954 26th St | remodel gr fl apartment with updated electrical, plumbing, add new bathroom. remove non load bearing wall at kitchen. remove non lad bearing wall between sunroom & living room. replace 4 windows not visible from streetDetails
remodel gr fl apartment with updated electrical, plumbing, add new bathroom. remove non load bearing wall at kitchen. remove non lad bearing wall between sunroom & living room. replace 4 windows not visible from street | $150,000 |
| Apr 18, 2011 | Completed final sign-off Oct 2011 | 170 San Anselmo Av | remodel kitchen & 3 bathrooms, replace exterior windows (total of 36 windows). interior remodel, no change to bldg envelope.Details
remodel kitchen & 3 bathrooms, replace exterior windows (total of 36 windows). interior remodel, no change to bldg envelope. | $215,000 |
| Oct 19, 2010 | Completed final sign-off Mar 2011 | 281 Chestnut St | rear bldg. kitchen and bath remodel including floor plan change for kitchen and bath of non structural wallsDetails
rear bldg. kitchen and bath remodel including floor plan change for kitchen and bath of non structural walls | $85,000 |
| Oct 13, 2009 | Completed final sign-off Feb 2010 | 574 Alvarado St | remodel kitchen-demo to studs, update electrical to meet code & include ten (n) recessed cans. install one (n) pocket door. change laundry room into bathroom. change closet into laundry closet.Details
remodel kitchen-demo to studs, update electrical to meet code & include ten (n) recessed cans. install one (n) pocket door. change laundry room into bathroom. change closet into laundry closet. | $80,000 |
| Oct 6, 2009 | Completed final sign-off Oct 2011 | 4349 25th St | 224 sq ft 2nd floor addition over (e) 1st floor kitchen. new addition will include a master bedtoom & bathroom. rear addition/horizontal addition. no change to (e) footprintDetails
224 sq ft 2nd floor addition over (e) 1st floor kitchen. new addition will include a master bedtoom & bathroom. rear addition/horizontal addition. no change to (e) footprint | $50,000 |
| Jun 17, 2008 | Expired or cancelled expired Jan 2010 | 150 Lombard St | work @ apt# 902 only. remove existing cabinets & appliances. install new cabinets, appliances, light fixtures in kitchen & living room ceiling. provide h.e. lights per title 24.Details
work @ apt# 902 only. remove existing cabinets & appliances. install new cabinets, appliances, light fixtures in kitchen & living room ceiling. provide h.e. lights per title 24. | $65,000 |
| Jan 24, 2008 | Completed final sign-off May 2008 | 1999 Broadway | work @ unit# 21 only. kitchen remodel, remove and install new cabinets, new recessed electrical lighting, new appliances, new washer/dryer in unit. no structural changes. removal of 8' of non load bearing wall @ kitchen @ 2nd @ unit# 21 only.Details
work @ unit# 21 only. kitchen remodel, remove and install new cabinets, new recessed electrical lighting, new appliances, new washer/dryer in unit. no structural changes. removal of 8' of non load bearing wall @ kitchen @ 2nd @ unit# 21 only. | $100,000 |
| Sep 6, 2006 | Completed final sign-off Jan 2007 | 1367 03rd Av | interior kkitchen and living room errmodel new appliances, new cabinets, new windows, refurbish floors, fenestration added is lessthan 50 sf u factor for replacement new windows 42 maxDetails
interior kkitchen and living room errmodel new appliances, new cabinets, new windows, refurbish floors, fenestration added is lessthan 50 sf u factor for replacement new windows 42 max | $50,000 |
| Jun 21, 2006 | Completed final sign-off Nov 2006 | 2206 Pine St | remove/replace kitchen cabinets, install new sink in new location, install new wiring to meet code, widen existing entry to kitchen adding a bar top. demolish interior of master bath & install new plumbing fixtures, cabinets, tile.Details
remove/replace kitchen cabinets, install new sink in new location, install new wiring to meet code, widen existing entry to kitchen adding a bar top. demolish interior of master bath & install new plumbing fixtures, cabinets, tile. | $100,000 |
| Jan 16, 2004 | Completed final sign-off May 2004 | 2539 Clay St | remodel kitchen -cabinets,appl,light fixtures,drywall&flooring.reframe wall .install plumb&elec.Details
remodel kitchen -cabinets,appl,light fixtures,drywall&flooring.reframe wall .install plumb&elec. | $40,000 |
| Jan 15, 2004 | Expired or cancelled cancelled Nov 2024 | 2539 Clay St | remodel kitchen -cabinets,appl,light fixtures,drywall&flooring.reframe wall .install plumb&elec.Details
remodel kitchen -cabinets,appl,light fixtures,drywall&flooring.reframe wall .install plumb&elec. |