Riechers Construction
- Based in
- Napa
- On San Francisco permits
- Jul 2018 to Feb 2022
- Last 24 months
- 0 permits filed
13 permits since 2000: 9 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 193 days from filing to permit and 368 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2019 | Completed final sign-off Jun 2021 | 402 Prentiss St | revision to pa# 2019/0801/7540 - ti add bathroom, move bedroom. convert (e) attic to habitable space by addiiton of (2) dormers to include (2) br & (1) full bath. add internal stair to connect attic.Details
revision to pa# 2019/0801/7540 - ti add bathroom, move bedroom. convert (e) attic to habitable space by addiiton of (2) dormers to include (2) br & (1) full bath. add internal stair to connect attic. | $15,000 |