Back to kitchen remodel contractors
Richard Freitas Construction
- Based in
- Oakland
- On San Francisco permits
- Mar 2015 to Jan 2018
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 374 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2017 | Completed final sign-off Aug 2017 | 2167 25th Av | no plans kitchen remodel, lower sink drain, add water line for fridge add required electrical circuits, new drywall, tile floor & backsplash , hang cabinets, add hood vent through roofDetails
no plans kitchen remodel, lower sink drain, add water line for fridge add required electrical circuits, new drywall, tile floor & backsplash , hang cabinets, add hood vent through roof | $15,000 |
| Mar 16, 2015 | Completed final sign-off Jan 2017 | 4096 17th St | kitchen remodel. repair drywall removed for plumbing & electrical work.Details
kitchen remodel. repair drywall removed for plumbing & electrical work. | $15,000 |