Back to kitchen remodel contractors
Rhodes Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2012 to Jan 2021
- Last 24 months
- 0 permits filed
23 permits since 2000: 22 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 3 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2020 | Completed final sign-off Jan 2021 | 164 Eastwood Dr | revision to pa#201903226027: decrease scopy of work from approved plans. no engineering needed to only be add master bathroom, remodel (e) kitchen & bathroom.Details
revision to pa#201903226027: decrease scopy of work from approved plans. no engineering needed to only be add master bathroom, remodel (e) kitchen & bathroom. | |
| May 28, 2019 | Completed final sign-off Oct 2019 | 2622 Sutter St | 2622a sutter street: new kitchen cabinets, new bath vanity, reframe interior partitions closet walls, non load bearing, add washer dryer, update lighting, insulate ceiling, remove and replace sheetrock ceiling in lower unitDetails
2622a sutter street: new kitchen cabinets, new bath vanity, reframe interior partitions closet walls, non load bearing, add washer dryer, update lighting, insulate ceiling, remove and replace sheetrock ceiling in lower unit | $12,000 |
| Apr 4, 2019 | Completed final sign-off Aug 2019 | 324 Connecticut St | 324b connecticut st: remodel kitchen & bathroom: replace 3 windows (vinyl) in (e) openings (size remain unchanged) at rear unit (b). windows u-factor 0.32 or better.Details
324b connecticut st: remodel kitchen & bathroom: replace 3 windows (vinyl) in (e) openings (size remain unchanged) at rear unit (b). windows u-factor 0.32 or better. | $11,000 |
| Mar 22, 2019 | Completed final sign-off Mar 2021 | 164 Eastwood Dr | remodel (e) 2 story sfd. 1/f: add bedroom #2, bath #2, playroom, laundry, lounge, bath #3 & storage. 2/f: remodel kitchen & bath #1, add master bath & closet. new stairwell to 1st fl. new water heater & furnace relocted. new windows & exterior doors.Details
remodel (e) 2 story sfd. 1/f: add bedroom #2, bath #2, playroom, laundry, lounge, bath #3 & storage. 2/f: remodel kitchen & bath #1, add master bath & closet. new stairwell to 1st fl. new water heater & furnace relocted. new windows & exterior doors. | $195,000 |
| Mar 15, 2017 | Completed final sign-off Aug 2017 | 1403 Lake St | kitchen remodel - remove and replace cabinets & counter tops. aal lightingDetails
kitchen remodel - remove and replace cabinets & counter tops. aal lighting | $24,000 |
| Dec 1, 2014 | Completed final sign-off Dec 2015 | 70 South Park | convert existing art gallery to office space. add kitchenette, conference room and 2 storage rooms.n/a for the maherDetails
convert existing art gallery to office space. add kitchenette, conference room and 2 storage rooms.n/a for the maher | $7,500 |
| Nov 1, 2013 | Completed final sign-off Mar 2014 | 908 Kansas St | removal of interior walls at kitchen of 2nd flDetails
removal of interior walls at kitchen of 2nd fl | $20,000 |