Back to bathroom remodel contractors
Residential Restoration Co
- Based in
- Oakland
- On San Francisco permits
- Jul 2011 to Jun 2025
- Last 24 months
- 1 permit filed
65 permits since 2000: 56 completed, 1 in progress, 8 never finaled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 28 completed, 3 never finaled. Typically 6 days from filing to permit and 137 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2021 | Completed final sign-off Feb 2023 | 2445 Larkin St | revision to pa# 201209048875 s2 r2. basement: relocate bath, reduce size of family room, add wet bar. level 1: open wall between columns, enlarge bath, reduce laundry. level 2: minor kitchen reconfiguration, relocate powder room. level 3: minor kitchen & bath reconfiguration, remove 1 bath, createDetails
revision to pa# 201209048875 s2 r2. basement: relocate bath, reduce size of family room, add wet bar. level 1: open wall between columns, enlarge bath, reduce laundry. level 2: minor kitchen reconfiguration, relocate powder room. level 3: minor kitchen & bath reconfiguration, remove 1 bath, create | |
| Jun 18, 2020 | Completed final sign-off Dec 2020 | 1019 Ashbury St | unit #1: kitchen ( ~251 sqft) and bathroom (~84 sq ft) remodel - fixtures and finishes in the kitchen and baths getting replaced in kind with no floor plan changes.Details
unit #1: kitchen ( ~251 sqft) and bathroom (~84 sq ft) remodel - fixtures and finishes in the kitchen and baths getting replaced in kind with no floor plan changes. | $20,000 |
| Apr 27, 2018 | Completed final sign-off Jul 2018 | 10 Lunado Wy | per nov #201532362 remove and replace structural beam in garage, add replace post. per nov, remodel bathroom, new electric in various areas was permitted on 200608088909Details
per nov #201532362 remove and replace structural beam in garage, add replace post. per nov, remodel bathroom, new electric in various areas was permitted on 200608088909 | |
| Dec 4, 2017 | Completed final sign-off Aug 2018 | 420 Panorama Dr | level 1 - add 2 bedrooms, bathrm and media rm, add window at media rm. replace (e) windows in new bedrooms with casment windows to meet egress requirements. relocate furnace & water heater; level 2 - remodel kitchen and 2 bathrooms, add furnace in hallwayDetails
level 1 - add 2 bedrooms, bathrm and media rm, add window at media rm. replace (e) windows in new bedrooms with casment windows to meet egress requirements. relocate furnace & water heater; level 2 - remodel kitchen and 2 bathrooms, add furnace in hallway | $150,000 |
| Jul 10, 2017 | Completed final sign-off Oct 2017 | 2614 39th Av | remodel kitchen, bedroom and closet. remodel existing bath and add bath where existing powder bath is.Details
remodel kitchen, bedroom and closet. remodel existing bath and add bath where existing powder bath is. | $75,000 |
| May 18, 2017 | Completed final sign-off Sep 2017 | 1627 24th Av | remodel kitchen and bedroom closets, add hall bath and remodel exsiting bath on level 2. no work on level 1.Details
remodel kitchen and bedroom closets, add hall bath and remodel exsiting bath on level 2. no work on level 1. | $75,000 |
| Mar 30, 2017 | Completed final sign-off Jun 2017 | 214 Castro St | add a new bathroom and laundry in extg utility room area. no increase of sq ft.Details
add a new bathroom and laundry in extg utility room area. no increase of sq ft. | $80,000 |
| Mar 28, 2017 | Completed final sign-off Oct 2017 | 501 Panorama Dr | 1/f- add 2 bedrooms, bath and media room. 2/f- remodel kitchen & bath, add closet. no exterior work visible from street.Details
1/f- add 2 bedrooms, bath and media room. 2/f- remodel kitchen & bath, add closet. no exterior work visible from street. | $150,000 |
| Mar 2, 2017 | Completed final sign-off Mar 2018 | 2807 Steiner St | to comply with nov 201758142: interior renovation of all 9 unitd to include kitchen and ada bath remodel & interior finishes. mep. included. maher naDetails
to comply with nov 201758142: interior renovation of all 9 unitd to include kitchen and ada bath remodel & interior finishes. mep. included. maher na | $270,000 |
| Aug 18, 2016 | Completed final sign-off Nov 2016 | 1642 41st Av | add bedroom, bathroom and laundry closet to lower (garage) level.Details
add bedroom, bathroom and laundry closet to lower (garage) level. | $15,000 |
| Aug 18, 2016 | Completed final sign-off Dec 2016 | 130 Denslowe Dr | add (1) bedroom, (1) bathroom and laundry closet to lower (garage) level. remodel kitchen and master bathroom. revision to permit 201606170231Details
add (1) bedroom, (1) bathroom and laundry closet to lower (garage) level. remodel kitchen and master bathroom. revision to permit 201606170231 | $15,000 |
| Jun 17, 2016 | Completed final sign-off Dec 2016 | 130 Denslowe Dr | remodel kitchen and bathroom inkind. complete section and repair work on termite report by fox structural and termite control dated 6/9/16, report # 15916Details
remodel kitchen and bathroom inkind. complete section and repair work on termite report by fox structural and termite control dated 6/9/16, report # 15916 | $40,000 |
| May 27, 2016 | Completed final sign-off Aug 2016 | 54 Kempton Av | add bathroom at garage (lower) level, legalize bedroomDetails
add bathroom at garage (lower) level, legalize bedroom | $10,000 |
| Mar 3, 2016 | Completed final sign-off Jun 2016 | 2331 21st Av | unit #1: remodel kitchen and (2) bathrooms, in-kind. replace light fixtures, plugs, switches therein. no change in wall and opening layout. min. 50% kitchen lighting high efficacy, high efficacy bathroom lighting or controlled by manual on sensor w/ high efficacy main light.Details
unit #1: remodel kitchen and (2) bathrooms, in-kind. replace light fixtures, plugs, switches therein. no change in wall and opening layout. min. 50% kitchen lighting high efficacy, high efficacy bathroom lighting or controlled by manual on sensor w/ high efficacy main light. | $50,000 |
| Mar 3, 2016 | Completed final sign-off May 2016 | 1155 Filbert St | remodel kitchen, in-kind. replace master bath faucet. no change in wall or opening layout.Details
remodel kitchen, in-kind. replace master bath faucet. no change in wall or opening layout. | $20,000 |
| Mar 3, 2016 | Completed final sign-off Nov 2016 | 1642 41st Av | remodel kitchen & (1) bath in-kind; replace (4) damaged windows with new u<0.32; (2) front of building, (2) at rear all in upper level; to comply with nov #201577212 (partially) dated 10/12/2015.Details
remodel kitchen & (1) bath in-kind; replace (4) damaged windows with new u<0.32; (2) front of building, (2) at rear all in upper level; to comply with nov #201577212 (partially) dated 10/12/2015. | $40,000 |
| Feb 12, 2016 | Completed final sign-off Aug 2016 | 1770 24th Av | remodel kitchen and bathroom per plans on 2/f, open up wall at downstairs, relocate fire door from garage to living space, legalize media room & bath #3 at garage level. no exterior or facade work.Details
remodel kitchen and bathroom per plans on 2/f, open up wall at downstairs, relocate fire door from garage to living space, legalize media room & bath #3 at garage level. no exterior or facade work. | $80,000 |
| Jan 22, 2016 | Never finaled issued Jan 2016, no final | 600 Chestnut St | remodel kitchen, in-kind; replace hardwood flooring; remodel 2 baths, in-kind; compliance with maher ordinance no 155-13 not required.Details
remodel kitchen, in-kind; replace hardwood flooring; remodel 2 baths, in-kind; compliance with maher ordinance no 155-13 not required. | $25,000 |
| Nov 20, 2015 | Completed final sign-off May 2016 | 719 42nd Av | remodel existing baths, add lower level bedroom, media room. relocate furnace, water heater, add powder room, remodel kitchen, add deck to existing roof, add bathroom at level three.Details
remodel existing baths, add lower level bedroom, media room. relocate furnace, water heater, add powder room, remodel kitchen, add deck to existing roof, add bathroom at level three. | $300,000 |
| Oct 14, 2015 | Completed final sign-off Nov 2015 | 2563 16th Av | remodel kitchen and bathroom in kind.Details
remodel kitchen and bathroom in kind. | $20,000 |
| Oct 1, 2015 | Completed final sign-off Jun 2016 | 1619 38th Av | add 2 bedroom, 2 bathrooms & a media room on garage level, remodel existing kitchen & main bath on upper level, add powder bath on upper level, replace rear deck in kind. no expansion of footprint, no facade changes.Details
add 2 bedroom, 2 bathrooms & a media room on garage level, remodel existing kitchen & main bath on upper level, add powder bath on upper level, replace rear deck in kind. no expansion of footprint, no facade changes. | $60,000 |
| Apr 17, 2015 | Completed final sign-off Dec 2015 | 2647 43rd Av | remodel existing kitchen & bath on 2nd flr, like for like , lighting to comply with cec 150(k)Details
remodel existing kitchen & bath on 2nd flr, like for like , lighting to comply with cec 150(k) | $35,000 |
| Apr 7, 2015 | Completed final sign-off Sep 2015 | 2300 43rd Av | remodel kitchen & bathroom @ 2nd level, remodel bath & bedroom @ ground floor, like for like. open up wall between kitchen & living room area.Details
remodel kitchen & bathroom @ 2nd level, remodel bath & bedroom @ ground floor, like for like. open up wall between kitchen & living room area. | $40,000 |
| Apr 7, 2015 | Completed final sign-off Sep 2015 | 1518 34th Av | remodel kitchen, add bath #1 upstairs, add bath & storage on garage level. comply with nov #200118277Details
remodel kitchen, add bath #1 upstairs, add bath & storage on garage level. comply with nov #200118277 | $40,000 |
| Mar 5, 2015 | Completed final sign-off Jul 2015 | 886 Junipero Serra Bl | revision to appl.# 2014.0828.4913. change kitchen layout, remove 1/2 bath and revise master bedroom closet per plan. shear wall relocation.Details
revision to appl.# 2014.0828.4913. change kitchen layout, remove 1/2 bath and revise master bedroom closet per plan. shear wall relocation. | |
| Dec 10, 2014 | Completed final sign-off Feb 2015 | 855 Folsom St | #522 - internal alteration of loft area, relocate door to bathroom, new closet & w/d configuration, closet/storage to home office, new recessed lighting. n/a maher ordinanceDetails
#522 - internal alteration of loft area, relocate door to bathroom, new closet & w/d configuration, closet/storage to home office, new recessed lighting. n/a maher ordinance | $3,000 |
| Sep 29, 2014 | Never finaled issued Oct 2014, no final | 2563 16th Av | reconfiguration of inteiror spaces per plans, new landscape & replace windows in kind, new fixtures, finishes, no building footprint expansion, new skylights & half bath on 2nd floor. new wet bar @ ground floor.Details
reconfiguration of inteiror spaces per plans, new landscape & replace windows in kind, new fixtures, finishes, no building footprint expansion, new skylights & half bath on 2nd floor. new wet bar @ ground floor. | $75,000 |
| Apr 8, 2014 | Never finaled issued May 2014, no final | 3790 Cesar Chavez St | first floor: convert storage room into bedroom and full bath. new 2-4'x4' sliding wood clad windows at front. remodel 2nd floor kitchen and bath, and 3rd floor bath. convert laundry to den on 2nd fl.Details
first floor: convert storage room into bedroom and full bath. new 2-4'x4' sliding wood clad windows at front. remodel 2nd floor kitchen and bath, and 3rd floor bath. convert laundry to den on 2nd fl. | $60,000 |
| Aug 3, 2012 | Completed final sign-off May 2013 | 2414 Moraga St | convert lower basement level into conditioned living space. add 2 bedrooms, 1 full bath to this space. approx 725 sf added to existing square footage.Details
convert lower basement level into conditioned living space. add 2 bedrooms, 1 full bath to this space. approx 725 sf added to existing square footage. | $28,000 |
| Jun 29, 2012 | Completed final sign-off Aug 2012 | 2022 Keith St | to comply with nov dated 6/14/12 @201231981 - remove kitchen & bathroom on ground floor, remove wet bar counters & cabinets, some drywall partition non-bearing walls. cap kitchen plumbing pipeDetails
to comply with nov dated 6/14/12 @201231981 - remove kitchen & bathroom on ground floor, remove wet bar counters & cabinets, some drywall partition non-bearing walls. cap kitchen plumbing pipe | $1,500 |
| May 24, 2012 | Completed final sign-off Jul 2012 | 266 Cresta Vista Dr | remodel (e) one kitchen and 2 (e) bathrooms, no structural work new lighting comply cec 150(k)Details
remodel (e) one kitchen and 2 (e) bathrooms, no structural work new lighting comply cec 150(k) | $22,000 |