- 1 permit filed
65 permits since 2000: 56 completed, 1 in progress, 8 never finaled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2025 | In progress filed Jun 2025, not yet issued | 2538 California St | erect a 4-story over basement, type 5b, mixed use with 3 residential units & one ground floor parking garage & ground floor commercial space. demo under separate permit #202108096072 - demo one commercial structure.Details
erect a 4-story over basement, type 5b, mixed use with 3 residential units & one ground floor parking garage & ground floor commercial space. demo under separate permit #202108096072 - demo one commercial structure. | $2,248,481 |
| Aug 21, 2024 | Completed final sign-off Oct 2024 | 653 Fell St | rev 201501236592, 202008282883, 202305318951.- no work to reflect minor preservation facade and landscaping changes and (e) gross square footage to clarify sleeping areas.Details
rev 201501236592, 202008282883, 202305318951.- no work to reflect minor preservation facade and landscaping changes and (e) gross square footage to clarify sleeping areas. | |
| Feb 21, 2024 | Completed final sign-off Oct 2024 | 653 Fell St | rev to pa202305318951: clarification to 1-hr fire rated fence detail only.Details
rev to pa202305318951: clarification to 1-hr fire rated fence detail only. | |
| Sep 11, 2023 | Completed final sign-off Oct 2024 | 653 Fell St | front planter use mse railing and pg&e meter locations ref pa# 2020-0828-2883Details
front planter use mse railing and pg&e meter locations ref pa# 2020-0828-2883 | |
| May 31, 2023 | Completed final sign-off Oct 2024 | 653 Fell St | revision to bpa#202008282883, (e) construction record drawing to revise conditions @ rear yard found in field for (e) constructed condition to be kept in place per terms of conditional use. reduce man door @ garage to 28"Details
revision to bpa#202008282883, (e) construction record drawing to revise conditions @ rear yard found in field for (e) constructed condition to be kept in place per terms of conditional use. reduce man door @ garage to 28" | $10,000 |
| Mar 5, 2021 | Completed final sign-off Feb 2023 | 2445 Larkin St | revision to pa# 201209048875 s2 r2. basement: relocate bath, reduce size of family room, add wet bar. level 1: open wall between columns, enlarge bath, reduce laundry. level 2: minor kitchen reconfiguration, relocate powder room. level 3: minor kitchen & bath reconfiguration, remove 1 bath, createDetails
revision to pa# 201209048875 s2 r2. basement: relocate bath, reduce size of family room, add wet bar. level 1: open wall between columns, enlarge bath, reduce laundry. level 2: minor kitchen reconfiguration, relocate powder room. level 3: minor kitchen & bath reconfiguration, remove 1 bath, create | |
| Nov 12, 2020 | Completed final sign-off Dec 2020 | 1019 Ashbury St | #1: replacement of street facing windows in kind at first floor; specs as existing window. (8) street facing windows wood double hung w/ integrated ogee lugs no rough opening changes. u-factor for new window shall not exceed 0.32. (2) non- street facing windows. (10) total.Details
#1: replacement of street facing windows in kind at first floor; specs as existing window. (8) street facing windows wood double hung w/ integrated ogee lugs no rough opening changes. u-factor for new window shall not exceed 0.32. (2) non- street facing windows. (10) total. | $15,000 |
| Sep 4, 2020 | Completed final sign-off Dec 2020 | 1019 Ashbury St | unit #1: minor wall reconfiguration of partition walls only. new recessed cans, network wiring, new washer/dryer; enlarge 2 showers. no strutural contractor to verify on site. 4 sq ft added under existing stair to unit. no changes to exterior.Details
unit #1: minor wall reconfiguration of partition walls only. new recessed cans, network wiring, new washer/dryer; enlarge 2 showers. no strutural contractor to verify on site. 4 sq ft added under existing stair to unit. no changes to exterior. | $35,000 |
| Aug 28, 2020 | Completed final sign-off Oct 2024 | 653 Fell St | revision to pa# 201501236592 comply with planning enforcement case no. 2018-014623enf. demolition of an existing (2)-family dwelling per section 317 of planning code. restoration of the building exterior.Details
revision to pa# 201501236592 comply with planning enforcement case no. 2018-014623enf. demolition of an existing (2)-family dwelling per section 317 of planning code. restoration of the building exterior. | $250,000 |
| Jun 18, 2020 | Completed final sign-off Dec 2020 | 1019 Ashbury St | unit #1: kitchen ( ~251 sqft) and bathroom (~84 sq ft) remodel - fixtures and finishes in the kitchen and baths getting replaced in kind with no floor plan changes.Details
unit #1: kitchen ( ~251 sqft) and bathroom (~84 sq ft) remodel - fixtures and finishes in the kitchen and baths getting replaced in kind with no floor plan changes. | $20,000 |
| Jun 29, 2018 | Never finaled issued Jun 2018, no final | 1019 Ashbury St | dry rot repair approx 12' at side, rear. not visible from street. repair in-kindDetails
dry rot repair approx 12' at side, rear. not visible from street. repair in-kind | $2,000 |
| Jun 20, 2018 | Completed final sign-off Mar 2019 | 1019 Ashbury St | interior residential at unit 8 & 9, first floor & second floors.Details
interior residential at unit 8 & 9, first floor & second floors. | $100,000 |
| Apr 27, 2018 | Completed final sign-off Jul 2018 | 10 Lunado Wy | per nov #201532362 remove and replace structural beam in garage, add replace post. per nov, remodel bathroom, new electric in various areas was permitted on 200608088909Details
per nov #201532362 remove and replace structural beam in garage, add replace post. per nov, remodel bathroom, new electric in various areas was permitted on 200608088909 | |
| Dec 18, 2017 | Completed final sign-off Jan 2018 | 2807 Steiner St | comply with nov#201065867. removal of extg chimney. repair wall in kind at removed chimney.Details
comply with nov#201065867. removal of extg chimney. repair wall in kind at removed chimney. | $10,000 |
| Dec 18, 2017 | Completed final sign-off Mar 2018 | 2807 Steiner St | comply w/ nov#200004155. legalize rear deck at 3rd level.Details
comply w/ nov#200004155. legalize rear deck at 3rd level. | $18,000 |
| Dec 4, 2017 | Completed final sign-off Aug 2018 | 420 Panorama Dr | level 1 - add 2 bedrooms, bathrm and media rm, add window at media rm. replace (e) windows in new bedrooms with casment windows to meet egress requirements. relocate furnace & water heater; level 2 - remodel kitchen and 2 bathrooms, add furnace in hallwayDetails
level 1 - add 2 bedrooms, bathrm and media rm, add window at media rm. replace (e) windows in new bedrooms with casment windows to meet egress requirements. relocate furnace & water heater; level 2 - remodel kitchen and 2 bathrooms, add furnace in hallway | $150,000 |
| Nov 9, 2017 | Completed final sign-off Jan 2020 | 1019 Ashbury St | conversion of existing storage space to an apartment dwelling unit & common building storage untis per ordinance 162-16Details
conversion of existing storage space to an apartment dwelling unit & common building storage untis per ordinance 162-16 | $20,000 |
| Oct 12, 2017 | Completed final sign-off Mar 2018 | 2807 Steiner St | revision to #201703020495 to address dbi correction notice. additional work to repair dry-rot and replace interior existing framing as shown on plans. maher naDetails
revision to #201703020495 to address dbi correction notice. additional work to repair dry-rot and replace interior existing framing as shown on plans. maher na | $4,000 |
| Jul 10, 2017 | Completed final sign-off Oct 2017 | 2614 39th Av | remodel kitchen, bedroom and closet. remodel existing bath and add bath where existing powder bath is.Details
remodel kitchen, bedroom and closet. remodel existing bath and add bath where existing powder bath is. | $75,000 |
| May 18, 2017 | Completed final sign-off Sep 2017 | 1627 24th Av | remodel kitchen and bedroom closets, add hall bath and remodel exsiting bath on level 2. no work on level 1.Details
remodel kitchen and bedroom closets, add hall bath and remodel exsiting bath on level 2. no work on level 1. | $75,000 |
| Mar 30, 2017 | Completed final sign-off Jun 2017 | 214 Castro St | add a new bathroom and laundry in extg utility room area. no increase of sq ft.Details
add a new bathroom and laundry in extg utility room area. no increase of sq ft. | $80,000 |
| Mar 28, 2017 | Completed final sign-off Oct 2017 | 501 Panorama Dr | 1/f- add 2 bedrooms, bath and media room. 2/f- remodel kitchen & bath, add closet. no exterior work visible from street.Details
1/f- add 2 bedrooms, bath and media room. 2/f- remodel kitchen & bath, add closet. no exterior work visible from street. | $150,000 |
| Mar 2, 2017 | Completed final sign-off Mar 2018 | 2807 Steiner St | to comply with nov 201758142: interior renovation of all 9 unitd to include kitchen and ada bath remodel & interior finishes. mep. included. maher naDetails
to comply with nov 201758142: interior renovation of all 9 unitd to include kitchen and ada bath remodel & interior finishes. mep. included. maher na | $270,000 |
| Mar 1, 2017 | Completed final sign-off Jan 2020 | 1019 Ashbury St | soft story retrofit per sfbc chap 34b engineering criteria: 2012 iebc appendix a-4Details
soft story retrofit per sfbc chap 34b engineering criteria: 2012 iebc appendix a-4 | $120,000 |
| Dec 5, 2016 | Completed final sign-off Mar 2018 | 2807 Steiner St | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4. n/a for maherDetails
soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4. n/a for maher | $110,000 |
| Aug 18, 2016 | Completed final sign-off Nov 2016 | 1642 41st Av | add bedroom, bathroom and laundry closet to lower (garage) level.Details
add bedroom, bathroom and laundry closet to lower (garage) level. | $15,000 |
| Aug 18, 2016 | Completed final sign-off Dec 2016 | 130 Denslowe Dr | add (1) bedroom, (1) bathroom and laundry closet to lower (garage) level. remodel kitchen and master bathroom. revision to permit 201606170231Details
add (1) bedroom, (1) bathroom and laundry closet to lower (garage) level. remodel kitchen and master bathroom. revision to permit 201606170231 | $15,000 |
| Jun 17, 2016 | Completed final sign-off Dec 2016 | 130 Denslowe Dr | remodel kitchen and bathroom inkind. complete section and repair work on termite report by fox structural and termite control dated 6/9/16, report # 15916Details
remodel kitchen and bathroom inkind. complete section and repair work on termite report by fox structural and termite control dated 6/9/16, report # 15916 | $40,000 |
| May 27, 2016 | Completed final sign-off Aug 2016 | 54 Kempton Av | add bathroom at garage (lower) level, legalize bedroomDetails
add bathroom at garage (lower) level, legalize bedroom | $10,000 |
| May 19, 2016 | Never finaled issued May 2016, no final | 1619 38th Av | replace front windows with new configuration. install new dual glazed windows in same size openings. new sash to be vinyl-clad wood (andersen 400 series). u-factor 0.32 max.Details
replace front windows with new configuration. install new dual glazed windows in same size openings. new sash to be vinyl-clad wood (andersen 400 series). u-factor 0.32 max. | $3,500 |
| May 10, 2016 | Never finaled issued May 2016, no final | 3792 Cesar Chavez St | partial foundation replacement. approx. 20 linear feet of foundation along the reat east property line.Details
partial foundation replacement. approx. 20 linear feet of foundation along the reat east property line. | $1,500 |
| Apr 26, 2016 | Never finaled issued Apr 2016, no final | 3790 Cesar Chavez St | relocate electric meter from interior of home to the exterior. install new meter panel and weather head per pg&eDetails
relocate electric meter from interior of home to the exterior. install new meter panel and weather head per pg&e | $3,000 |
| Apr 18, 2016 | Completed final sign-off Jun 2016 | 54 Kempton Av | kitchen remodel, in kind. comply cec140(k)Details
kitchen remodel, in kind. comply cec140(k) | $30,000 |
| Mar 3, 2016 | Completed final sign-off May 2016 | 1155 Filbert St | remodel kitchen, in-kind. replace master bath faucet. no change in wall or opening layout.Details
remodel kitchen, in-kind. replace master bath faucet. no change in wall or opening layout. | $20,000 |
| Mar 3, 2016 | Completed final sign-off Jun 2016 | 2331 21st Av | unit #1: remodel kitchen and (2) bathrooms, in-kind. replace light fixtures, plugs, switches therein. no change in wall and opening layout. min. 50% kitchen lighting high efficacy, high efficacy bathroom lighting or controlled by manual on sensor w/ high efficacy main light.Details
unit #1: remodel kitchen and (2) bathrooms, in-kind. replace light fixtures, plugs, switches therein. no change in wall and opening layout. min. 50% kitchen lighting high efficacy, high efficacy bathroom lighting or controlled by manual on sensor w/ high efficacy main light. | $50,000 |
| Mar 3, 2016 | Completed final sign-off Nov 2016 | 1642 41st Av | remodel kitchen & (1) bath in-kind; replace (4) damaged windows with new u<0.32; (2) front of building, (2) at rear all in upper level; to comply with nov #201577212 (partially) dated 10/12/2015.Details
remodel kitchen & (1) bath in-kind; replace (4) damaged windows with new u<0.32; (2) front of building, (2) at rear all in upper level; to comply with nov #201577212 (partially) dated 10/12/2015. | $40,000 |
| Feb 12, 2016 | Completed final sign-off Aug 2016 | 1770 24th Av | remodel kitchen and bathroom per plans on 2/f, open up wall at downstairs, relocate fire door from garage to living space, legalize media room & bath #3 at garage level. no exterior or facade work.Details
remodel kitchen and bathroom per plans on 2/f, open up wall at downstairs, relocate fire door from garage to living space, legalize media room & bath #3 at garage level. no exterior or facade work. | $80,000 |
| Jan 22, 2016 | Never finaled issued Jan 2016, no final | 600 Chestnut St | remodel kitchen, in-kind; replace hardwood flooring; remodel 2 baths, in-kind; compliance with maher ordinance no 155-13 not required.Details
remodel kitchen, in-kind; replace hardwood flooring; remodel 2 baths, in-kind; compliance with maher ordinance no 155-13 not required. | $25,000 |
| Nov 20, 2015 | Completed final sign-off May 2016 | 719 42nd Av | remodel existing baths, add lower level bedroom, media room. relocate furnace, water heater, add powder room, remodel kitchen, add deck to existing roof, add bathroom at level three.Details
remodel existing baths, add lower level bedroom, media room. relocate furnace, water heater, add powder room, remodel kitchen, add deck to existing roof, add bathroom at level three. | $300,000 |
| Oct 14, 2015 | Completed final sign-off Nov 2015 | 2563 16th Av | remodel kitchen and bathroom in kind.Details
remodel kitchen and bathroom in kind. | $20,000 |
| Oct 1, 2015 | Completed final sign-off Jun 2016 | 1619 38th Av | add 2 bedroom, 2 bathrooms & a media room on garage level, remodel existing kitchen & main bath on upper level, add powder bath on upper level, replace rear deck in kind. no expansion of footprint, no facade changes.Details
add 2 bedroom, 2 bathrooms & a media room on garage level, remodel existing kitchen & main bath on upper level, add powder bath on upper level, replace rear deck in kind. no expansion of footprint, no facade changes. | $60,000 |
| Sep 9, 2015 | Completed final sign-off Sep 2015 | 2300 43rd Av | revision to app#201504072945. revised plans showing no landscaping work performed per aproved plans. all landscaping concrete extg new planting only.Details
revision to app#201504072945. revised plans showing no landscaping work performed per aproved plans. all landscaping concrete extg new planting only. | |
| Jul 29, 2015 | Completed final sign-off Jan 2016 | 719 42nd Av | repair work per termite report dated 2/10/15. section 1 items: 1c, 1g, 2a, 3b,3c, 5a, 5d.Details
repair work per termite report dated 2/10/15. section 1 items: 1c, 1g, 2a, 3b,3c, 5a, 5d. | $4,500 |
| Jul 29, 2015 | Completed final sign-off Dec 2015 | 2647 43rd Av | add furnace unit & duct work to the home.Details
add furnace unit & duct work to the home. | $3,000 |
| Jul 29, 2015 | Completed final sign-off Sep 2015 | 1518 34th Av | termite report repair work. report dated 2/9/15, sec. # 1 items: 1e,1i,3a,4c,4f,5c,5eDetails
termite report repair work. report dated 2/9/15, sec. # 1 items: 1e,1i,3a,4c,4f,5c,5e | $6,000 |
| Jul 29, 2015 | Completed final sign-off Oct 2015 | 2563 16th Av | termite report repair work. report dated 2/9/15, sec. # 1 items: 18,1c, 1g, 1h,3b, 3c,4d, 4f,5b,5dDetails
termite report repair work. report dated 2/9/15, sec. # 1 items: 18,1c, 1g, 1h,3b, 3c,4d, 4f,5b,5d | $5,000 |
| Apr 17, 2015 | Completed final sign-off Dec 2015 | 2647 43rd Av | remodel existing kitchen & bath on 2nd flr, like for like , lighting to comply with cec 150(k)Details
remodel existing kitchen & bath on 2nd flr, like for like , lighting to comply with cec 150(k) | $35,000 |
| Apr 7, 2015 | Completed final sign-off Sep 2015 | 1518 34th Av | remodel kitchen, add bath #1 upstairs, add bath & storage on garage level. comply with nov #200118277Details
remodel kitchen, add bath #1 upstairs, add bath & storage on garage level. comply with nov #200118277 | $40,000 |
| Apr 7, 2015 | Completed final sign-off Sep 2015 | 2300 43rd Av | remodel kitchen & bathroom @ 2nd level, remodel bath & bedroom @ ground floor, like for like. open up wall between kitchen & living room area.Details
remodel kitchen & bathroom @ 2nd level, remodel bath & bedroom @ ground floor, like for like. open up wall between kitchen & living room area. | $40,000 |
| Mar 18, 2015 | Completed final sign-off Apr 2015 | 10 Lunado Wy | complete termite report section 1 repairs; termite report #15322 by fox structural & termite control; - items 1b, 1c, 1e, 1f, 1g, 2c, 4a, 4b, 4c, 5a & 5b onlyDetails
complete termite report section 1 repairs; termite report #15322 by fox structural & termite control; - items 1b, 1c, 1e, 1f, 1g, 2c, 4a, 4b, 4c, 5a & 5b only | $4,000 |
| Mar 18, 2015 | Completed final sign-off Apr 2015 | 10 Lunado Wy | to obtain final inspection for work approved under pa#2006-0808-8909. all work is complete.Details
to obtain final inspection for work approved under pa#2006-0808-8909. all work is complete. | |
| Mar 16, 2015 | Completed final sign-off Mar 2015 | 10 Lunado Wy | reinstate expired permit #201112019876. to obtain final inspection for work approved under pa#201112019876. all work is complete.Details
reinstate expired permit #201112019876. to obtain final inspection for work approved under pa#201112019876. all work is complete. | |
| Mar 5, 2015 | Completed final sign-off Jul 2015 | 886 Junipero Serra Bl | revision to appl.# 2014.0828.4913. change kitchen layout, remove 1/2 bath and revise master bedroom closet per plan. shear wall relocation.Details
revision to appl.# 2014.0828.4913. change kitchen layout, remove 1/2 bath and revise master bedroom closet per plan. shear wall relocation. | |
| Dec 10, 2014 | Completed final sign-off Feb 2015 | 855 Folsom St | #522 - internal alteration of loft area, relocate door to bathroom, new closet & w/d configuration, closet/storage to home office, new recessed lighting. n/a maher ordinanceDetails
#522 - internal alteration of loft area, relocate door to bathroom, new closet & w/d configuration, closet/storage to home office, new recessed lighting. n/a maher ordinance | $3,000 |
| Sep 29, 2014 | Never finaled issued Oct 2014, no final | 2563 16th Av | reconfiguration of inteiror spaces per plans, new landscape & replace windows in kind, new fixtures, finishes, no building footprint expansion, new skylights & half bath on 2nd floor. new wet bar @ ground floor.Details
reconfiguration of inteiror spaces per plans, new landscape & replace windows in kind, new fixtures, finishes, no building footprint expansion, new skylights & half bath on 2nd floor. new wet bar @ ground floor. | $75,000 |
| Apr 8, 2014 | Never finaled issued May 2014, no final | 3790 Cesar Chavez St | first floor: convert storage room into bedroom and full bath. new 2-4'x4' sliding wood clad windows at front. remodel 2nd floor kitchen and bath, and 3rd floor bath. convert laundry to den on 2nd fl.Details
first floor: convert storage room into bedroom and full bath. new 2-4'x4' sliding wood clad windows at front. remodel 2nd floor kitchen and bath, and 3rd floor bath. convert laundry to den on 2nd fl. | $60,000 |
| Dec 21, 2012 | Completed final sign-off Dec 2013 | 2296 15th Av | to comply with violation nov # 200736993 kitchen remodel - new cabinets, finish plumbing, finish electrical, granite counters, appliances, replace (e) 3' x 5' window with like for like.Details
to comply with violation nov # 200736993 kitchen remodel - new cabinets, finish plumbing, finish electrical, granite counters, appliances, replace (e) 3' x 5' window with like for like. | $15,000 |
| Oct 22, 2012 | Never finaled filed Oct 2012, never issued | 650 Fell St | re-build rear deck on the 2nd floor. to comply with nov #201263781 due to fire, replace deck in kind.Details
re-build rear deck on the 2nd floor. to comply with nov #201263781 due to fire, replace deck in kind. | $5,000 |
| Sep 4, 2012 | Completed final sign-off Mar 2023 | 2447 Larkin St | raise the existing 3 units bldg in order to make to following alterations; insert a new 3 car garage and rear basement level; horizontal expand penthouse level; and construct new rear decks.Details
raise the existing 3 units bldg in order to make to following alterations; insert a new 3 car garage and rear basement level; horizontal expand penthouse level; and construct new rear decks. | $600,000 |
| Aug 3, 2012 | Completed final sign-off May 2013 | 2414 Moraga St | convert lower basement level into conditioned living space. add 2 bedrooms, 1 full bath to this space. approx 725 sf added to existing square footage.Details
convert lower basement level into conditioned living space. add 2 bedrooms, 1 full bath to this space. approx 725 sf added to existing square footage. | $28,000 |
| Jun 29, 2012 | Completed final sign-off Aug 2012 | 2022 Keith St | to comply with nov dated 6/14/12 @201231981 - remove kitchen & bathroom on ground floor, remove wet bar counters & cabinets, some drywall partition non-bearing walls. cap kitchen plumbing pipeDetails
to comply with nov dated 6/14/12 @201231981 - remove kitchen & bathroom on ground floor, remove wet bar counters & cabinets, some drywall partition non-bearing walls. cap kitchen plumbing pipe | $1,500 |
| Jun 13, 2012 | Completed final sign-off Jul 2012 | 266 Cresta Vista Dr | foundation repairs/alteration, include plywood for area under lower floor. remodel under seperate permit pa#201205241219Details
foundation repairs/alteration, include plywood for area under lower floor. remodel under seperate permit pa#201205241219 | $5,000 |
| May 24, 2012 | Completed final sign-off Jul 2012 | 266 Cresta Vista Dr | remodel (e) one kitchen and 2 (e) bathrooms, no structural work new lighting comply cec 150(k)Details
remodel (e) one kitchen and 2 (e) bathrooms, no structural work new lighting comply cec 150(k) | $22,000 |
| Aug 18, 2011 | Completed final sign-off Sep 2011 | 434 Hanover St | to obtain final inspection for work approved under pa#200605101189. all work is complete.Details
to obtain final inspection for work approved under pa#200605101189. all work is complete. | |
| Jul 28, 2011 | Completed final sign-off Sep 2011 | 434 Hanover St | kitchen remodel: new cabinets/ counters/ gfci outlets/ 2 can lights with switches/ new appliances. at least 50% high efficacy lighting (by wattage), cec 150 (k)Details
kitchen remodel: new cabinets/ counters/ gfci outlets/ 2 can lights with switches/ new appliances. at least 50% high efficacy lighting (by wattage), cec 150 (k) | $10,000 |