Back to kitchen remodel contractors
Renew Builder Inc
- Based in
- South San Francisco
- On San Francisco permits
- May 2013 to Apr 2026
- Last 24 months
- 4 permits filed
16 permits since 2000: 13 completed, 1 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 2 days from filing to permit and 208 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2026 | Completed final sign-off Jul 2026 | 40 Walter St | (2) bathroom remodels. (1) kitchen remodel- new sinks. all work in kind. bathrooms approx 40 sq ft and 48 sq ft. kitchen approx 150 sq ft.Details
(2) bathroom remodels. (1) kitchen remodel- new sinks. all work in kind. bathrooms approx 40 sq ft and 48 sq ft. kitchen approx 150 sq ft. | $35,000 |
| Feb 26, 2025 | Completed final sign-off Jul 2025 | 2 20th Av | kitchen cabinet replacing doors, new sink, disposal, new stove. relocate ceiling lights- kitchen and dining only.Details
kitchen cabinet replacing doors, new sink, disposal, new stove. relocate ceiling lights- kitchen and dining only. | $35,000 |
| Sep 6, 2023 | Completed final sign-off May 2024 | 81 Alviso St | demo (e) interior plaster, add insulation. rewiring, replace plaster with 5/8" type'x'sheetrock. taping and paint. kitchen remodeling, bathroom remodeling, paint outside. fence around the property. all new drywall to be 5/8" type x.Details
demo (e) interior plaster, add insulation. rewiring, replace plaster with 5/8" type'x'sheetrock. taping and paint. kitchen remodeling, bathroom remodeling, paint outside. fence around the property. all new drywall to be 5/8" type x. | $75,000 |
| Nov 28, 2022 | Completed final sign-off Jan 2023 | 1650 Jackson St | one kitchen remodel (non structural): new countertops and new sink and disposal. replace kitchen flooring.Details
one kitchen remodel (non structural): new countertops and new sink and disposal. replace kitchen flooring. | $10,000 |
| Aug 8, 2022 | Completed final sign-off Jan 2023 | 38 El Sereno Ct | remodel (1) kitchen in kind, 11' x 12' used existing layout. new appliances, new dry wall, tile, and paint.Details
remodel (1) kitchen in kind, 11' x 12' used existing layout. new appliances, new dry wall, tile, and paint. | $18,500 |
| Apr 9, 2021 | Completed final sign-off Jun 2023 | 211 Miramar Av | referece complaint 2020222772. revision to pa 201906183679. relocate kitchen, entrance door. rearrange bathrm at g/f. rearrange bathrm and reinstall (e) lightwell, match to original at 2/f. rearrange 2 bathrms/dormers at 3/f.Details
referece complaint 2020222772. revision to pa 201906183679. relocate kitchen, entrance door. rearrange bathrm at g/f. rearrange bathrm and reinstall (e) lightwell, match to original at 2/f. rearrange 2 bathrms/dormers at 3/f. | $3,000 |
| Jun 18, 2019 | Completed final sign-off Jun 2023 | 211 Miramar Av | 1)remodel extg kitchen, relocate extg bathrm, & construct 1 bed room, 1 full bathroom at ground flr. 2) relocate extg kitchen, bathroom, add 1 nw bath room, & convert extg kitchen space to bedroom at 2nd flr. 3)const. 2 bedroom, 2 full bath room at 3rd floor. 4)rebuilt interior staircase.Details
1)remodel extg kitchen, relocate extg bathrm, & construct 1 bed room, 1 full bathroom at ground flr. 2) relocate extg kitchen, bathroom, add 1 nw bath room, & convert extg kitchen space to bedroom at 2nd flr. 3)const. 2 bedroom, 2 full bath room at 3rd floor. 4)rebuilt interior staircase. | $180,000 |
| May 14, 2013 | Completed final sign-off Oct 2025 | 447 Bright St | horizontal addition - add guest rm, family rm & full bath on grd fl. rearrange bed rm, dining rm, living rm, bath & kitchen on 2nd fl. add a new bath & rear deck at 2nd floor.Details
horizontal addition - add guest rm, family rm & full bath on grd fl. rearrange bed rm, dining rm, living rm, bath & kitchen on 2nd fl. add a new bath & rear deck at 2nd floor. | $65,000 |