Back to kitchen remodel contractors
Rene Arias Construction
- Based in
- Hayward
- On San Francisco permits
- Apr 2002 to Jan 2014
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 1 days from filing to permit and 30 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2014 | Completed final sign-off Feb 2014 | 1083 Hampshire St | bathroom and kitchen repair per three counties termite report #10437 items #10a; 10bDetails
bathroom and kitchen repair per three counties termite report #10437 items #10a; 10b | $10,000 |
| Aug 1, 2012 | Completed final sign-off Nov 2012 | 1151 Naples St | remodel (e) kitchenm, remove non-bearing wall between kitchen & dining rm. convert (e) walk-in-closet to bathroom.Details
remodel (e) kitchenm, remove non-bearing wall between kitchen & dining rm. convert (e) walk-in-closet to bathroom. | $23,000 |
| May 21, 2012 | Completed final sign-off May 2012 | 801 Mount Vernon Av | comply with nov# 201216821-new door opening on ground floor & remove kitchen. rooms down build with pa# 7702283Details
comply with nov# 201216821-new door opening on ground floor & remove kitchen. rooms down build with pa# 7702283 | $300 |