Back to kitchen remodel contractors
Ren Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2019 to May 2026
- Last 24 months
- 4 permits filed
6 permits since 2000: 1 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 1 completed, 4 in progress. Typically 20 days from filing to permit and 173 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 28, 2026 | In progress issued Jun 2026 | 75 Montana St | remodel kitchen and 2 bathrooms; remove a wall btw kitchen and living room; replace 2 windows on the 2nd fl bedrooms; install sliding glass door on the 1st fl bedroom recess front wall opening o its original construction conditionDetails
remodel kitchen and 2 bathrooms; remove a wall btw kitchen and living room; replace 2 windows on the 2nd fl bedrooms; install sliding glass door on the 1st fl bedroom recess front wall opening o its original construction condition | $40,000 |
| Oct 27, 2025 | In progress issued Nov 2025 | 913 Pacific Av | units 913 and 915- 2 & 3/fl- remodel (e) kitchen and bathrooms, add (n) bathroom to each unit and (n) furnaceDetails
units 913 and 915- 2 & 3/fl- remodel (e) kitchen and bathrooms, add (n) bathroom to each unit and (n) furnace | $110,786 |
| Jun 25, 2025 | Completed final sign-off Dec 2025 | 225 Juanita Wy | kitchen remodel. primary bathroom remodel (lower). guest bathroom remodel (upper).Details
kitchen remodel. primary bathroom remodel (lower). guest bathroom remodel (upper). | $80,000 |
| Jan 8, 2025 | In progress issued May 2025 | 48 Brentwood Av | create a new junior accessory dwelling unit per gvmt code ss65852.2 on 1st floor to include 1 new bedroom, bathroom, living room and kitchen.Details
create a new junior accessory dwelling unit per gvmt code ss65852.2 on 1st floor to include 1 new bedroom, bathroom, living room and kitchen. | $135,000 |
| Nov 5, 2019 | In progress issued Dec 2023 | 51 Wanda St | legalize a 2nd dwelling unit w/ 2 bedrooms & 2 bath, on 1st flr of an (e) single family per ord# 43-14. (n) landscaping @ front proposed (2) bedroom & (2) bath (1) kitchen in dining area on 1st fl. remove (e) shed storage at rear. legalize rear addition under separate permit #201912109122-s.Details
legalize a 2nd dwelling unit w/ 2 bedrooms & 2 bath, on 1st flr of an (e) single family per ord# 43-14. (n) landscaping @ front proposed (2) bedroom & (2) bath (1) kitchen in dining area on 1st fl. remove (e) shed storage at rear. legalize rear addition under separate permit #201912109122-s. | $8,000 |