Remus Contractors Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Jan 2021
- Last 24 months
- 0 permits filed
16 permits since 2000: 15 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2021 | Completed final sign-off Apr 2021 | 2665 Sacramento St | repair to wall opening from pa201905301973.Details
repair to wall opening from pa201905301973. | $1,000 |
| May 30, 2019 | Completed final sign-off Jun 2019 | 2665 Sacramento St | 2nd fl: install new 2-8" wide door on the laundry room and close existing 2-8" door existing on the bedroom and living room, kitchen and laundryDetails
2nd fl: install new 2-8" wide door on the laundry room and close existing 2-8" door existing on the bedroom and living room, kitchen and laundry | $1,500 |
| May 30, 2019 | Never finaled issued May 2019, no final | 555 Arch St | install new electrical service 200 amps, new sub panel, plumbing r/e galunase pipes for copper, install new doors, r/r ceremic tiles, refinish hardwood floors.Details
install new electrical service 200 amps, new sub panel, plumbing r/e galunase pipes for copper, install new doors, r/r ceremic tiles, refinish hardwood floors. | $40,000 |
| May 22, 2018 | Completed final sign-off Feb 2020 | 2665 Sacramento St | install new electrical 200 amp, subpanel, rewire unit; replace galvanized pipes for copper, new doors, trim moulding, new marvin wood windows, block frame to replace (e) on the back & side of houseDetails
install new electrical 200 amp, subpanel, rewire unit; replace galvanized pipes for copper, new doors, trim moulding, new marvin wood windows, block frame to replace (e) on the back & side of house | $60,000 |
| Oct 30, 2015 | Completed final sign-off Feb 2016 | 525 Peru Av | to obtain final inspection for work approved under pa#'s 201209210306, 201002186747 & 201312093672. all work is complete.Details
to obtain final inspection for work approved under pa#'s 201209210306, 201002186747 & 201312093672. all work is complete. | |
| Apr 23, 2013 | Completed final sign-off Aug 2013 | 3992 25th St | kitchen and bath remodel, for the kitchen, replace cabinets, floor tiles, counter tops and change plumbing for sinks; for bath - change tub, shower, faucet, vanity, tiles and change plumbing. no new lighting work under this permit.Details
kitchen and bath remodel, for the kitchen, replace cabinets, floor tiles, counter tops and change plumbing for sinks; for bath - change tub, shower, faucet, vanity, tiles and change plumbing. no new lighting work under this permit. | $20,000 |
| Mar 25, 2013 | Completed final sign-off Jul 2013 | 425 Hyde St | revision to permit #201302210683. show fur wall and studwall work on plans for units #3,4,5. no shear walls affected.Details
revision to permit #201302210683. show fur wall and studwall work on plans for units #3,4,5. no shear walls affected. | $5,000 |
| Feb 21, 2013 | Completed final sign-off Aug 2013 | 1050 Lake St | remodeling kitchen, master bathroom, kids bathroom, 1/2 hallway bathroom, laundry room, paint and restore extg wood. structural framing.Details
remodeling kitchen, master bathroom, kids bathroom, 1/2 hallway bathroom, laundry room, paint and restore extg wood. structural framing. | $89,000 |
| Feb 21, 2013 | Completed final sign-off Jul 2013 | 425 Hyde St | bathroom and kitchen remodeling. apt #3, 4, &5. paint, prime, floor installation.Details
bathroom and kitchen remodeling. apt #3, 4, &5. paint, prime, floor installation. | $17,600 |
| Jan 2, 2013 | Completed final sign-off Feb 2013 | 1695 12th Av | #1: convert (e) closet to full bathroom, shower, sink & toilet, paint & primer.Details
#1: convert (e) closet to full bathroom, shower, sink & toilet, paint & primer. | $6,800 |
| Aug 2, 2012 | Completed final sign-off Dec 2012 | 411 Pierce St | unit 6:remodel kitchen and bath. plumbing and electric, floor, paint. exterior paint, subpanel. will comply with title 24Details
unit 6:remodel kitchen and bath. plumbing and electric, floor, paint. exterior paint, subpanel. will comply with title 24 | $18,000 |
| May 7, 2012 | Completed final sign-off Jun 2012 | 146 Mcallister St | bath remodel apt 207Details
bath remodel apt 207 | $8,000 |
| Apr 25, 2012 | Completed final sign-off Sep 2012 | 146 Mcallister St | to legalize kitchen cabinets remodeling for units #417,418,419,420; and unit 71 reinstall new sheetrock, new insulation, patching and paint in kind, lighting toc omply with cec (150(k)Details
to legalize kitchen cabinets remodeling for units #417,418,419,420; and unit 71 reinstall new sheetrock, new insulation, patching and paint in kind, lighting toc omply with cec (150(k) | $25,000 |
| Sep 9, 2011 | Completed final sign-off Apr 2012 | 146 Mcallister St | to comply with nov 201145887; sheetrock installation, electric, plumbing, kitchen cabinets new bathroom, point floor, unit #416, unit#616, unit #316, convenient store ceiling, 12x10 sheetrock installation (cosmetic work handicapped access issued exempted under this permit), provide high efficiency 1Details
to comply with nov 201145887; sheetrock installation, electric, plumbing, kitchen cabinets new bathroom, point floor, unit #416, unit#616, unit #316, convenient store ceiling, 12x10 sheetrock installation (cosmetic work handicapped access issued exempted under this permit), provide high efficiency 1 | $35,000 |
| Oct 13, 2010 | Completed final sign-off Feb 2012 | 2350 Union St | replacement window installation, new siding vinyl installation; u-factor 0.4 maximum. fiberglass clad wood windows or aluminum clad wood, double hung front; vinyl window and siding rearDetails
replacement window installation, new siding vinyl installation; u-factor 0.4 maximum. fiberglass clad wood windows or aluminum clad wood, double hung front; vinyl window and siding rear | $23,000 |
| Oct 13, 2010 | Completed final sign-off Nov 2010 | 935 Capp St | repair stairway areas, remove wooden utility ladder, repair leaking drain pipe at exterior, rpovide handrails for the stairway. to comply with nov 201058986Details
repair stairway areas, remove wooden utility ladder, repair leaking drain pipe at exterior, rpovide handrails for the stairway. to comply with nov 201058986 | $2,500 |