Block 6518, lot 021
941 Capp St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 4
- Rooms
- 8 bedrooms, 4 bathrooms
- Building
- 4,690 sq ft
- Lot
- 4,600 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 23, 2023 | Completed final sign-off Sep 2023 | 941 Capp St | Glam Construction Inc. | reroofing, changing shingle/malarki brank, sloped/gabled roofDetails
reroofing, changing shingle/malarki brank, sloped/gabled roof | $34,000 |
| Jun 8, 2022 | Completed final sign-off Jul 2022 | 941 Capp St | Glam Construction Inc. | removal of two non-loadbearing partitions & add (1) bathroom fan.Details
removal of two non-loadbearing partitions & add (1) bathroom fan. | $10,000 |
| Mar 11, 2016 | Completed final sign-off Nov 2016 | 939 Capp St | Deluxe Windows And Doors | to replace 5 windows on the facade with wood aluminum clad, double hung, and 6 windows on the rear with vinyl single and double hung. maintain egress window requirements.Details
to replace 5 windows on the facade with wood aluminum clad, double hung, and 6 windows on the rear with vinyl single and double hung. maintain egress window requirements. | $6,600 |
| Jan 11, 2016 | Completed final sign-off May 2016 | 937 Capp St | Deluxe Windows And Doors | replace 5 windows at front with aluminum-clad wood and 6 rear windows with vinyl windows at back, same size and location and openings. u factor .32 maxDetails
replace 5 windows at front with aluminum-clad wood and 6 rear windows with vinyl windows at back, same size and location and openings. u factor .32 max | $5,900 |
| Jan 6, 2016 | Completed final sign-off Feb 2016 | 935 Capp St | to comply with complaint # 201577432 & 201577431 , remodel kitchen & bath 1 new kitchen window, 1 new bath window, new plumbing & electrical , also electrical var chargerDetails
to comply with complaint # 201577432 & 201577431 , remodel kitchen & bath 1 new kitchen window, 1 new bath window, new plumbing & electrical , also electrical var charger | ||
| Oct 13, 2010 | Completed final sign-off Nov 2010 | 935 Capp St | Remus Contractors Inc. | repair stairway areas, remove wooden utility ladder, repair leaking drain pipe at exterior, rpovide handrails for the stairway. to comply with nov 201058986Details
repair stairway areas, remove wooden utility ladder, repair leaking drain pipe at exterior, rpovide handrails for the stairway. to comply with nov 201058986 | $2,500 |
| Jun 11, 2007 | Completed final sign-off Jun 2007 | 937 Capp St | James Whereat | voluntary seismic upgrade, 2 6x6 posts in garage, remount to concrete pier 12" above ground. 18 below ground, no 4 rebar and cbs 66. rear stair/deck remount 4x4 posts on concrete piers 12" above. 18 below ground no. 4 rebar and cbsq 44.Details
voluntary seismic upgrade, 2 6x6 posts in garage, remount to concrete pier 12" above ground. 18 below ground, no 4 rebar and cbs 66. rear stair/deck remount 4x4 posts on concrete piers 12" above. 18 below ground no. 4 rebar and cbsq 44. | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Deluxe Windows And Doors (2), Glam Construction Inc. (2), James Whereat, Remus Contractors Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.