Back to kitchen remodel contractors
Reliance Building & Maintanance
- Based in
- Salida
- On San Francisco permits
- Jan 2016 to Aug 2019
- Last 24 months
- 0 permits filed
19 permits since 2000: 14 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 7 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 285 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2019 | Completed final sign-off Aug 2023 | 357 Vallejo St | comply w. complaint 201866075. repair fire escape ladders. remodel 3 units, modify floor plans, remodel kitchen and baths. infill below (e) habitable space at ground level. add partition walls at ground level for storage. provide roof top decks for 2 private upper level units.Details
comply w. complaint 201866075. repair fire escape ladders. remodel 3 units, modify floor plans, remodel kitchen and baths. infill below (e) habitable space at ground level. add partition walls at ground level for storage. provide roof top decks for 2 private upper level units. | $80,000 |
| Jul 11, 2019 | Completed final sign-off Dec 2022 | 359 Vallejo St | remodeling 3 apartment units only. #1, #3, #4. kitchen and bathroom only. 1 kitchen & 2 bathrooms per unit x 3 apartments. kitchen size 8x10, bathroom 5x6. remodel same location, no alteration of walls.Details
remodeling 3 apartment units only. #1, #3, #4. kitchen and bathroom only. 1 kitchen & 2 bathrooms per unit x 3 apartments. kitchen size 8x10, bathroom 5x6. remodel same location, no alteration of walls. | $240,000 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 821 Hampshire St | kitchen and bathroom upgrade, 3 apartment units. no change to existing wall layouts and life safety equipments. units 821,825,829Details
kitchen and bathroom upgrade, 3 apartment units. no change to existing wall layouts and life safety equipments. units 821,825,829 | $60,000 |
| Mar 7, 2019 | Expired or cancelled expired Apr 2022 | 1367 Natoma St | replace extg sub-standard brick foundation with new concrete foundation. same location. modify walls relocate bath room & kitchen.Details
replace extg sub-standard brick foundation with new concrete foundation. same location. modify walls relocate bath room & kitchen. | $60,000 |
| Jun 21, 2018 | Completed final sign-off Apr 2019 | 2112 Hyde St | unit #4: sub-panel change. add 16 recessed lights. move plumbing in master bath to accomodate 2 sinks. rewire kitchen. reframe bedroom closetDetails
unit #4: sub-panel change. add 16 recessed lights. move plumbing in master bath to accomodate 2 sinks. rewire kitchen. reframe bedroom closet | $8,000 |
| Jun 21, 2018 | Completed final sign-off Apr 2019 | 2112 Hyde St | unit #2: sub-panel change. add 16 recessed lights. move plumbing in master bath to accomodate 2 sinks. rewire kitchen. reframe bedroom closetDetails
unit #2: sub-panel change. add 16 recessed lights. move plumbing in master bath to accomodate 2 sinks. rewire kitchen. reframe bedroom closet | $8,000 |
| Jun 21, 2018 | Completed final sign-off Apr 2019 | 2112 Hyde St | unit #5: sub-panel change. add 16 recessed lights. move plumbing in master bath to accomodate 2 sinks. rewire kitchen. reframe bedroom closetDetails
unit #5: sub-panel change. add 16 recessed lights. move plumbing in master bath to accomodate 2 sinks. rewire kitchen. reframe bedroom closet | $8,000 |
| Jun 21, 2018 | Completed final sign-off Apr 2019 | 2112 Hyde #1 St | unit #1: sub-panel change. add 16 recessed lights. move plumbing in master bath to accomodate 2 sinks. rewire kitchen. reframe bedroom closetDetails
unit #1: sub-panel change. add 16 recessed lights. move plumbing in master bath to accomodate 2 sinks. rewire kitchen. reframe bedroom closet | $8,000 |
| Jun 21, 2018 | Completed final sign-off Apr 2019 | 2112 Hyde St | unit # 3: sub-panel change. add 16 recessed lights. move plumbing in master bath to accomodate 2 sinks. rewire kitchen. reframe bedroom closetDetails
unit # 3: sub-panel change. add 16 recessed lights. move plumbing in master bath to accomodate 2 sinks. rewire kitchen. reframe bedroom closet | $8,000 |