Back to bathroom remodel contractors
Reliable Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2014 to Sep 2026
- Last 24 months
- 97 permits filed
326 permits since 2000: 257 completed, 43 in progress, 17 never finaled, 9 expired or cancelled.
Of the 17 never-finaled permits, 4 are 3 to 5 years old, 13 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
132 bathroom remodel permits: 109 completed, 16 in progress, 4 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 167 days from permit to final inspection.
Showing the 100 most recent of 132.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Sep 2026 | 3620 Ulloa St | infill of (e) space under (e) 2nd floor. garage conversion into livable space. new bathroom.Details
infill of (e) space under (e) 2nd floor. garage conversion into livable space. new bathroom. | $85,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 812 Vallejo St | remodel kitchen and bath in kind. repair drywall from pipe refit.Details
remodel kitchen and bath in kind. repair drywall from pipe refit. | $61,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 820 Vallejo St | remodel kitchen and bathroom in kind. no wall moves.Details
remodel kitchen and bathroom in kind. no wall moves. | $61,000 |
| Jun 22, 2026 | Expired or cancelled cancelled Jul 2026 | 1 Topaz Wy | remodel bathroom, change out counter top. upgrade house electrical.Details
remodel bathroom, change out counter top. upgrade house electrical. | $41,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 63 Jules Av | add bathroom at garage level.Details
add bathroom at garage level. | $38,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 1505 Revere Av | revise/expand the scope of the previously approved, no plans kitchen and bath remodel 2026-0527-2003 p/a to include interior remodel of unit 203 to create a new bathroom, bedroom and office. new partition walls, finishes, cabinetry, fistures, plumbing, lighting.Details
revise/expand the scope of the previously approved, no plans kitchen and bath remodel 2026-0527-2003 p/a to include interior remodel of unit 203 to create a new bathroom, bedroom and office. new partition walls, finishes, cabinetry, fistures, plumbing, lighting. | $63,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 1416 25th Av | partial kitchen remodel. (new countertop psiny cabinets). 2 bathroom remodel in kind. replace floors, modernize laundry - add door to laundry closet.Details
partial kitchen remodel. (new countertop psiny cabinets). 2 bathroom remodel in kind. replace floors, modernize laundry - add door to laundry closet. | $75,000 |
| May 27, 2026 | In progress issued May 2026 | 1505 Revere Av | unit #203: remodel kitchen and one bathroom in kind. no change to wall layout. no change to floor layout. no structural work.Details
unit #203: remodel kitchen and one bathroom in kind. no change to wall layout. no change to floor layout. no structural work. | $55,000 |
| May 27, 2026 | In progress issued May 2026 | 63 Jules Av | remodel kitchen & bathroom in kindDetails
remodel kitchen & bathroom in kind | $41,000 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 1782 27th Av | bathroom remodel- 47 sqft , all fixtures in same location. like for like.Details
bathroom remodel- 47 sqft , all fixtures in same location. like for like. | $27,000 |
| May 11, 2026 | In progress issued Sep 2026 | 1424 Underwood Av | erect 2-story, type 5b, detached adu at rear, with 3-bedrooms, 2-baths, kitchen, living room and office nook.Details
erect 2-story, type 5b, detached adu at rear, with 3-bedrooms, 2-baths, kitchen, living room and office nook. | $200,000 |
| May 4, 2026 | In progress issued May 2026 | 24 Thor Av | kitchen and bathroom remodel in kind. no wall changes.Details
kitchen and bathroom remodel in kind. no wall changes. | $53,000 |
| Mar 31, 2026 | Completed final sign-off Jun 2026 | 660 Douglass St | kitchen/bath remodel, no wall movesDetails
kitchen/bath remodel, no wall moves | $58,000 |
| Mar 4, 2026 | In progress issued Mar 2026 | 1350 Ortega St | convert (e) garage/basement area into livable space with 2 bedrooms and 1 bathroom; remove wall between existing garage and hallDetails
convert (e) garage/basement area into livable space with 2 bedrooms and 1 bathroom; remove wall between existing garage and hall | $80,000 |
| Feb 9, 2026 | Completed final sign-off Apr 2026 | 39 West View Av | bathroom remodel in kind.Details
bathroom remodel in kind. | $35,000 |
| Feb 5, 2026 | Completed final sign-off May 2026 | 1845 Pacheco St | 2/f: remodel (1) existing bathroom in kind.Details
2/f: remodel (1) existing bathroom in kind. | $30,000 |
| Jan 22, 2026 | Completed final sign-off Sep 2026 | 275 Christopher Dr | convert portion of the garage into a master bedroom with walk in closet and master bath, family room and dedicated laundry room with a closet. voluntary seismic upgrade.Details
convert portion of the garage into a master bedroom with walk in closet and master bath, family room and dedicated laundry room with a closet. voluntary seismic upgrade. | $68,000 |
| Jan 12, 2026 | Completed final sign-off Mar 2026 | 32 Sussex St | bathroom remodel, replace fixtures, title, cabinets etc.Details
bathroom remodel, replace fixtures, title, cabinets etc. | $22,000 |
| Dec 5, 2025 | Completed final sign-off Jul 2026 | 275 Christopher Dr | remodel (2) bathrooms in kind. remodel kitchen in kind. upgrade panel to 200 amps. install new he (high efficiency) furnace.Details
remodel (2) bathrooms in kind. remodel kitchen in kind. upgrade panel to 200 amps. install new he (high efficiency) furnace. | $53,000 |
| Oct 16, 2025 | Completed final sign-off Jun 2026 | 1499 Sanchez St | kitchen remodel, bathrooms remodel, remove wall between kitchen and dining room.Details
kitchen remodel, bathrooms remodel, remove wall between kitchen and dining room. | $100,000 |
| Oct 16, 2025 | In progress issued Oct 2025 | 332 Hill St | remodel 2 bathrooms in kind, like for like, same locationDetails
remodel 2 bathrooms in kind, like for like, same location | $68,000 |
| Sep 8, 2025 | Completed final sign-off Mar 2026 | 2290 26th Av | remodel kicthen and 2 bathrooms in kind. no wall moves or structual changes.Details
remodel kicthen and 2 bathrooms in kind. no wall moves or structual changes. | $70,000 |
| Sep 5, 2025 | In progress issued Sep 2025 | 332 Hill St | remodel kitchen and bath in kind.Details
remodel kitchen and bath in kind. | $72,000 |
| Jul 29, 2025 | Completed final sign-off Nov 2025 | 167 Cresta Vista Dr | conversion of (e) laundry into 1/2 bath. partial conversion of (e) living room into office. replace (1) (e) picture window with an operable window. add (1) (n) window in office space.Details
conversion of (e) laundry into 1/2 bath. partial conversion of (e) living room into office. replace (1) (e) picture window with an operable window. add (1) (n) window in office space. | $35,000 |
| Jul 29, 2025 | In progress issued Nov 2025 | 2167 Union St | remodel of office, kitchenette and bathroom- wall paper, appliances, fixtures, doors, paint etc. like for like.Details
remodel of office, kitchenette and bathroom- wall paper, appliances, fixtures, doors, paint etc. like for like. | $35,000 |
| Jun 3, 2025 | In progress issued Sep 2025 | 1099 Holloway Av | addition to (e) sfr in rear yard, new bedroom, closet, bathroom over crawl space. minor remodel to (e) bedrooms. new exterior doors, windows and deck. see "project scope" on cover page for complete descriptions for this permit.Details
addition to (e) sfr in rear yard, new bedroom, closet, bathroom over crawl space. minor remodel to (e) bedrooms. new exterior doors, windows and deck. see "project scope" on cover page for complete descriptions for this permit. | $120,000 |
| May 30, 2025 | Completed final sign-off Nov 2025 | 763 36th Av | remodel kitchen, relocate window, 2 remodel bathrooms, add 2 new skylights, and infill interior lightwell (18 sq ft). upgrade panel to 200 amps.Details
remodel kitchen, relocate window, 2 remodel bathrooms, add 2 new skylights, and infill interior lightwell (18 sq ft). upgrade panel to 200 amps. | $75,000 |
| Apr 28, 2025 | Completed final sign-off Nov 2025 | 890 Wisconsin St | legalize/ remodel existing ground floor space bedroom, bathroom, kitchenette with 2-burner and laundry. remove non conforming patio below existing deck.Details
legalize/ remodel existing ground floor space bedroom, bathroom, kitchenette with 2-burner and laundry. remove non conforming patio below existing deck. | $75,000 |
| Mar 27, 2025 | Completed final sign-off Oct 2025 | 1634 Hayes St | non structural interior remodel of kitchen, bathroom, laundry room. new exterior windows not street visibleDetails
non structural interior remodel of kitchen, bathroom, laundry room. new exterior windows not street visible | $45,000 |
| Mar 19, 2025 | Completed final sign-off Jun 2025 | 890 Wisconsin St | 2/f: revision to permit 202503031456 to include adding a 2nd bathroom, minor non-structural wall moves and adding a closet in a bedroom.Details
2/f: revision to permit 202503031456 to include adding a 2nd bathroom, minor non-structural wall moves and adding a closet in a bedroom. | $25,000 |
| Mar 3, 2025 | Completed final sign-off Jun 2025 | 890 Wisconsin St | remodel bathroom in kind, repair back deck dryrot 25%Details
remodel bathroom in kind, repair back deck dryrot 25% | $35,000 |
| Dec 12, 2024 | Completed final sign-off Feb 2025 | 745 Chestnut St | remodel bathroom in kind.Details
remodel bathroom in kind. | $42,000 |
| Dec 10, 2024 | Completed final sign-off Jan 2025 | 8 Gaviota Wy | add a 2nd bathroom at 2nd flr, add a french drain at backyard. no structural changes.Details
add a 2nd bathroom at 2nd flr, add a french drain at backyard. no structural changes. | $52,000 |
| Dec 5, 2024 | Completed final sign-off Feb 2025 | 58 Rudden Av | remodel bathroom in-kind no wall movesDetails
remodel bathroom in-kind no wall moves | $30,000 |
| Oct 28, 2024 | Completed final sign-off Jan 2025 | 8 Gaviota Wy | remodel kitchen and bathroom in kind; replace in kind and no change in layout.Details
remodel kitchen and bathroom in kind; replace in kind and no change in layout. | $42,000 |
| Oct 17, 2024 | Completed final sign-off Nov 2024 | 106 Cordova St | remodel (e) bathroom in kind, no change in plumbing fixture count, no wall demolition or construction.Details
remodel (e) bathroom in kind, no change in plumbing fixture count, no wall demolition or construction. | $32,000 |
| Oct 12, 2024 | In progress issued Apr 2026 | 643 39th Av | remodel (e) kitchen. remove (e) load bearing wall at hallway. add (n) bath to master bedroom. add (n) media room to garage level. infill addition below (e) 2nd story sunroom at rear yard.Details
remodel (e) kitchen. remove (e) load bearing wall at hallway. add (n) bath to master bedroom. add (n) media room to garage level. infill addition below (e) 2nd story sunroom at rear yard. | $65,000 |
| Sep 25, 2024 | Completed final sign-off Jan 2025 | 1505 Revere Av | unit 101- kitchen/bath remodel, add bathroom and remove walls.Details
unit 101- kitchen/bath remodel, add bathroom and remove walls. | $65,000 |
| Sep 12, 2024 | Completed final sign-off Mar 2025 | 766 36th Av | kitchen and bath remodel in kind. no wall moves.Details
kitchen and bath remodel in kind. no wall moves. | $41,000 |
| Aug 27, 2024 | Completed final sign-off Aug 2024 | 137 06th Av | revise p/a 202312273173 to remove scope of work item #3 (bathroom remodel at basement) listed on sheet a0.0 from scope of work per inspector requirememt. additionally to document the construction shown in detail 2/a1.0 of the approved plans will not be performed.Details
revise p/a 202312273173 to remove scope of work item #3 (bathroom remodel at basement) listed on sheet a0.0 from scope of work per inspector requirememt. additionally to document the construction shown in detail 2/a1.0 of the approved plans will not be performed. | |
| Aug 16, 2024 | Completed final sign-off Dec 2024 | 3417 16th St | revision to 202404230611 to include structural sheets, structural calcs, title 24 documentation not included with the drawings previously approved. to document the change of use of the ground fl unit (3417) from commercial to a resid unit to include 3 bdrms,2 baths,laundry.gr lvl deck at rearDetails
revision to 202404230611 to include structural sheets, structural calcs, title 24 documentation not included with the drawings previously approved. to document the change of use of the ground fl unit (3417) from commercial to a resid unit to include 3 bdrms,2 baths,laundry.gr lvl deck at rear | $30,000 |
| Jul 17, 2024 | Completed final sign-off Oct 2024 | 1505 Revere Av | unit #102: kitchen/bath remodel, add bedroom and new partition walls.Details
unit #102: kitchen/bath remodel, add bedroom and new partition walls. | $32,000 |
| Jun 21, 2024 | Completed final sign-off Aug 2024 | 662 Mangels Av | remodel one bathroom in kind no structuralDetails
remodel one bathroom in kind no structural | $21,000 |
| Apr 10, 2024 | Expired or cancelled cancelled Apr 2024 | 1754 Grove St | remodel bathroom no structural or wall changes.Details
remodel bathroom no structural or wall changes. | $31,000 |
| Apr 1, 2024 | Completed final sign-off Apr 2025 | 85 Turquoise Wy | remodel kitchen & 2.5 bathroom in kind. no wall movesDetails
remodel kitchen & 2.5 bathroom in kind. no wall moves | $80,000 |
| Feb 26, 2024 | Completed final sign-off May 2024 | 2478 42nd Av | revise 202401043428 to add in two additional bathroom remodel in kind. 1st and 2nd floor, no wall change.Details
revise 202401043428 to add in two additional bathroom remodel in kind. 1st and 2nd floor, no wall change. | $36,000 |
| Feb 23, 2024 | Completed final sign-off Aug 2024 | 137 06th Av | revision to 202312273173. increase scope of work to include like for like replacement of 2nd fl bathroom fixtures for (2 total bathrooms at 2nd floor) in kindDetails
revision to 202312273173. increase scope of work to include like for like replacement of 2nd fl bathroom fixtures for (2 total bathrooms at 2nd floor) in kind | $10,000 |
| Jan 4, 2024 | Completed final sign-off May 2024 | 2478 42nd Av | remodel kitchen and bath in kind. no wall moves.Details
remodel kitchen and bath in kind. no wall moves. | $55,000 |
| Dec 27, 2023 | Completed final sign-off Aug 2024 | 137 06th Av | revision to permit# 202309086194: interior remodel - change (e) bath into living space, convert (e) storage to bathroom, expand kitchen by removing a load bearing wall between (e) kitchen and bedroom.Details
revision to permit# 202309086194: interior remodel - change (e) bath into living space, convert (e) storage to bathroom, expand kitchen by removing a load bearing wall between (e) kitchen and bedroom. | $40,000 |
| Oct 10, 2023 | Completed final sign-off Nov 2023 | 766 36th Av | 2/f: remodel (e) bathroom in kind. no structuralDetails
2/f: remodel (e) bathroom in kind. no structural | $38,000 |
| Sep 8, 2023 | Completed final sign-off Aug 2024 | 137 06th Av | kitchen and bathroom remodel in kind. kitchen = 60 sqft. bathroom = 40 sqft. whole house electrical upgrade.Details
kitchen and bathroom remodel in kind. kitchen = 60 sqft. bathroom = 40 sqft. whole house electrical upgrade. | $75,000 |
| Jul 14, 2023 | Completed final sign-off Oct 2023 | 4475 17th St | in-kind bathroom remodel. 60 sqft. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. number of plumbing fixtures remain same as existing.Details
in-kind bathroom remodel. 60 sqft. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. number of plumbing fixtures remain same as existing. | $28,000 |
| May 31, 2023 | Completed final sign-off Dec 2023 | 4079 25th St | remodel kitchen and bath in kind, upgrade house electrical panelDetails
remodel kitchen and bath in kind, upgrade house electrical panel | $31,000 |
| May 23, 2023 | Completed final sign-off Aug 2023 | 445 Valley St | renovate bathroom in-kind, upgrade house electrical.Details
renovate bathroom in-kind, upgrade house electrical. | $48,000 |
| Apr 24, 2023 | Completed final sign-off Aug 2023 | 307 Oak St | construct new bathroom (approx. 45sf) in existing space.Details
construct new bathroom (approx. 45sf) in existing space. | $30,000 |
| Mar 22, 2023 | Completed final sign-off Jun 2023 | 309 Oak St | revision for 202303143671: to include a second bathroomDetails
revision for 202303143671: to include a second bathroom | $15,000 |
| Mar 14, 2023 | Completed final sign-off Jun 2023 | 309 Oak St | remodel bathroom in kind. replace tile, toilet and sink.Details
remodel bathroom in kind. replace tile, toilet and sink. | $23,000 |
| Nov 22, 2022 | Completed final sign-off Jul 2023 | 1846 43rd Av | repair fire damage in kind, kitchen/bath remodel.Details
repair fire damage in kind, kitchen/bath remodel. | $100,000 |
| Oct 31, 2022 | Completed final sign-off Dec 2022 | 1501 Revere Av | revision to pa 202209061918 to provide plans. interior remodel of unit #204 remodel kitchen, bath, add bedroom, non structural work only.Details
revision to pa 202209061918 to provide plans. interior remodel of unit #204 remodel kitchen, bath, add bedroom, non structural work only. | |
| Sep 6, 2022 | Completed final sign-off Dec 2022 | 1501 Revere Av | unit #204: kitchen/bath remodel in kind. new 80 amp subpanel.Details
unit #204: kitchen/bath remodel in kind. new 80 amp subpanel. | $39,000 |
| Jun 29, 2022 | Completed final sign-off Aug 2022 | 14 Ora Wy | remodel 2 bathrooms in kind, no structural or wall moves. upgrade house electrical. two bathrooms at 75 sq ft each on 2nd floor.Details
remodel 2 bathrooms in kind, no structural or wall moves. upgrade house electrical. two bathrooms at 75 sq ft each on 2nd floor. | $38,000 |
| Jun 8, 2022 | Completed final sign-off May 2023 | 2546 42nd Av | revision to pa #202008312961. relocate ground floor bath and add kitchenette with 2 burner cooktop only no oven. non structural interior work only not visible from street.Details
revision to pa #202008312961. relocate ground floor bath and add kitchenette with 2 burner cooktop only no oven. non structural interior work only not visible from street. | $10,000 |
| Apr 7, 2022 | Completed final sign-off Dec 2022 | 1369 04th Av | bathroom remodel. add kitchenette.Details
bathroom remodel. add kitchenette. | $28,000 |
| Apr 4, 2022 | Completed final sign-off Jan 2024 | 957 Church St | remodel kitchen and bath in kind. kitchen is 100sqft. bath 55sqft, no wall moves. no structural work/ no wall modificationDetails
remodel kitchen and bath in kind. kitchen is 100sqft. bath 55sqft, no wall moves. no structural work/ no wall modification | $36,000 |
| Apr 4, 2022 | Completed final sign-off Jan 2024 | 959 Church St | remodel kitchen and bath in kind. kitchen is 100sqft, bathroom 55sqft. no wall movesDetails
remodel kitchen and bath in kind. kitchen is 100sqft, bathroom 55sqft. no wall moves | $36,000 |
| Mar 10, 2022 | Completed final sign-off Oct 2022 | 1474 Newcomb Av | infill under extg sunroom in rear yard. add 2 bedrooms, office, bathroom, family room, kitchenette at ground floor. add bath at upper floor. no expansion of bldg envelope or work visible from street. ref pa#202111122306Details
infill under extg sunroom in rear yard. add 2 bedrooms, office, bathroom, family room, kitchenette at ground floor. add bath at upper floor. no expansion of bldg envelope or work visible from street. ref pa#202111122306 | $100,000 |
| Jan 26, 2022 | Completed final sign-off Apr 2022 | 25 Latona St | repair drywall after fire upgrade house electrical restore fixtures in bathroom, kitchen replace flooring repaint.Details
repair drywall after fire upgrade house electrical restore fixtures in bathroom, kitchen replace flooring repaint. | $31,000 |
| Jan 5, 2022 | Completed final sign-off Apr 2022 | 2645 Van Ness Av | unit 2, 6, 9. kitchen/bath remodel in kind. electrical upgrade. paint.Details
unit 2, 6, 9. kitchen/bath remodel in kind. electrical upgrade. paint. | $38,000 |
| Jan 5, 2022 | Completed final sign-off Jun 2022 | 1271 02nd Av | bathroom remodel. no shower pan, no underground. replace fixtures, cabs, tile, etc.Details
bathroom remodel. no shower pan, no underground. replace fixtures, cabs, tile, etc. | $24,000 |
| Nov 12, 2021 | Completed final sign-off Oct 2022 | 1474 Newcomb Av | kitchen, bath, 1 and 1/2 bath remodels upgrade house electrical, new 200 amp panel. change out flooring, appliances, cabinets and fixtures, -+Details
kitchen, bath, 1 and 1/2 bath remodels upgrade house electrical, new 200 amp panel. change out flooring, appliances, cabinets and fixtures, -+ | $31,000 |
| Oct 19, 2021 | Completed final sign-off Jan 2022 | 651 Scott St | apt 12: remodel kitchen & 1 bathroom in-kind. no wall modifcation, or layout changes.Details
apt 12: remodel kitchen & 1 bathroom in-kind. no wall modifcation, or layout changes. | $31,000 |
| Oct 6, 2021 | Never finaled issued Oct 2021, no final | 230 Central Av | unit #6: remodel 1 kitchen & 1 bath in kind. paint. no structural.Details
unit #6: remodel 1 kitchen & 1 bath in kind. paint. no structural. | $32,000 |
| Sep 27, 2021 | Completed final sign-off Oct 2022 | 1584 Funston Av | remodel kitchen & living room & (e) bathroom. build (n) bath, add(n) windows in stairwell. replace (e) window in stairwell.Details
remodel kitchen & living room & (e) bathroom. build (n) bath, add(n) windows in stairwell. replace (e) window in stairwell. | $40,000 |
| Sep 20, 2021 | Completed final sign-off Jan 2022 | 1133 Fell St | unit 2: kitchen remodel, partial bathroom remodel. no wall changes or appliances moves. h.e. lighting & controlled per cec 150.0(k)Details
unit 2: kitchen remodel, partial bathroom remodel. no wall changes or appliances moves. h.e. lighting & controlled per cec 150.0(k) | $37,000 |
| Aug 27, 2021 | Completed final sign-off Dec 2021 | 12 Carson St | build new bath & closet on 3rd fl; replace door on to (e) deckDetails
build new bath & closet on 3rd fl; replace door on to (e) deck | $15,000 |
| Aug 25, 2021 | Completed final sign-off Mar 2022 | 2600 35th Av | compliance with ground floor rooms down complaint 202176895. legalize existing unpermitted walls and rooms down. 2nd kitchen, bedroom, bath. no expansion of building envelope or work visible from street.Details
compliance with ground floor rooms down complaint 202176895. legalize existing unpermitted walls and rooms down. 2nd kitchen, bedroom, bath. no expansion of building envelope or work visible from street. | $45,000 |
| Aug 18, 2021 | Completed final sign-off May 2022 | 675 39th Av | convert garage area to living area with 2 bedrooms, 1 bath and laundry remodel (e) 2nd fl. kitchen, bathroom and powder room , replace some windows no work is visible from public wayDetails
convert garage area to living area with 2 bedrooms, 1 bath and laundry remodel (e) 2nd fl. kitchen, bathroom and powder room , replace some windows no work is visible from public way | $150,000 |
| Aug 17, 2021 | Completed final sign-off Apr 2022 | 3140 Octavia St | apt 3: remodel of (e) unit on 3rd fl kitchen, 1 bath, 2 bedrooms.Details
apt 3: remodel of (e) unit on 3rd fl kitchen, 1 bath, 2 bedrooms. | $40,000 |
| Jul 2, 2021 | Completed final sign-off Jan 2025 | 18 Harlow St | build new bedroom, bath, living, kitchen on ground flr. rebuild interior stair. remodel 2nd flr bedrooms and bathrooms. replace (e) garage doors with windows. remove windows in rear of property. pour new gradebeam and concrete slab on ground floor.Details
build new bedroom, bath, living, kitchen on ground flr. rebuild interior stair. remodel 2nd flr bedrooms and bathrooms. replace (e) garage doors with windows. remove windows in rear of property. pour new gradebeam and concrete slab on ground floor. | $50,000 |
| Jun 22, 2021 | Completed final sign-off Jan 2022 | 1231 Grove St | unit 1: remodel kitchen & bath in-kind, upgrade unit electrical, add 14 lights, maintain 1-hour separation between units @ area of new work. no change to layout of walls & openings.Details
unit 1: remodel kitchen & bath in-kind, upgrade unit electrical, add 14 lights, maintain 1-hour separation between units @ area of new work. no change to layout of walls & openings. | $43,000 |
| Jun 21, 2021 | Completed final sign-off Nov 2021 | 651 Scott St | apt 7: remodel kitchen & bathroom, in-kind, upgrade unit electrical, add 14 led lights.Details
apt 7: remodel kitchen & bathroom, in-kind, upgrade unit electrical, add 14 led lights. | $43,000 |
| May 25, 2021 | Never finaled issued May 2021, no final | 1584 Funston Av | kitchen 100 sq. ft., bath remodel 80 sq. ft., in-kindDetails
kitchen 100 sq. ft., bath remodel 80 sq. ft., in-kind | $33,000 |
| May 11, 2021 | Completed final sign-off Jan 2022 | 3140 Octavia St | unit 4 - kitchen & bath remodel. upgrade house electrical new panelDetails
unit 4 - kitchen & bath remodel. upgrade house electrical new panel | $80,000 |
| Apr 14, 2021 | Completed final sign-off Aug 2021 | 246 02nd St | unit #502: kitchen and 2 bathrooms remodel in kind. kitchen ~80 sqft. 2 bathrooms ~ 100 sqft total. no structural work.Details
unit #502: kitchen and 2 bathrooms remodel in kind. kitchen ~80 sqft. 2 bathrooms ~ 100 sqft total. no structural work. | $49,000 |
| Mar 4, 2021 | Never finaled issued Jul 2021, no final | 81 Santa Rita Av | ground floor interior remodel: excavation at (e) ground floor mechanical and storage space for relocated master bath and closet, new office and new bathroom. no expansion to building envelope or footprint.Details
ground floor interior remodel: excavation at (e) ground floor mechanical and storage space for relocated master bath and closet, new office and new bathroom. no expansion to building envelope or footprint. | $250,000 |
| Jan 11, 2021 | Completed final sign-off Jun 2021 | 2410 Green St | kitchen, 2 bath remodel.Details
kitchen, 2 bath remodel. | $55,000 |
| Dec 23, 2020 | Expired or cancelled expired Dec 2024 | 18 Harlow St | remodel kitchen/2 baths in kind. upgrade electrical. upgrade 125a subpanel.Details
remodel kitchen/2 baths in kind. upgrade electrical. upgrade 125a subpanel. | $41,000 |
| Dec 21, 2020 | Completed final sign-off Jun 2021 | 1697 Newcomb Av | kitchen bath remodel in kind. upgrade house electricalDetails
kitchen bath remodel in kind. upgrade house electrical | $41,000 |
| Dec 15, 2020 | Completed final sign-off Apr 2021 | 651 Scott St | unit#10: kitchen/ bathroom remodel in kind upgrade, electrical throughout, plumbing upgrade. no structural changes.Details
unit#10: kitchen/ bathroom remodel in kind upgrade, electrical throughout, plumbing upgrade. no structural changes. | $38,000 |
| Dec 14, 2020 | Completed final sign-off Jun 2021 | 1915 Keith St | interior remodel: add 1 bedroom, office, 1/2 bath. remodel kitchen & bathroom. downstairs: add 3 bedrooms, remodel laundry & add full bath. (n) spiral stair at rear yard. no expansion of building envelope.Details
interior remodel: add 1 bedroom, office, 1/2 bath. remodel kitchen & bathroom. downstairs: add 3 bedrooms, remodel laundry & add full bath. (n) spiral stair at rear yard. no expansion of building envelope. | $50,000 |
| Dec 9, 2020 | Completed final sign-off Feb 2023 | 262 Hahn St | remodel kitchen & 2 bathrooms in-kind. install 2 furnaces, upgrade house electrical & sub panelDetails
remodel kitchen & 2 bathrooms in-kind. install 2 furnaces, upgrade house electrical & sub panel | $53,000 |
| Dec 9, 2020 | Completed final sign-off May 2021 | 3238 Broderick St | remodel kitchen & bathroom in-kind. upgrade house electrical & sub panelDetails
remodel kitchen & bathroom in-kind. upgrade house electrical & sub panel | $59,000 |
| Nov 25, 2020 | Completed final sign-off Mar 2022 | 2318 09th Av | 1/f: add new bathroom, laundry and activity room. 2/f: remodel (e) kitchen, living room & bathroom. 3/f: remodel (e) bedrooms and bathrooms.Details
1/f: add new bathroom, laundry and activity room. 2/f: remodel (e) kitchen, living room & bathroom. 3/f: remodel (e) bedrooms and bathrooms. | $90,000 |
| Nov 16, 2020 | Completed final sign-off Jun 2021 | 1915 Keith St | remodel kitchen, baths & laundry in kind. no structural changes. upgrade electrical throughout. replace rotten siding at rear side wall. remove old and install new furnaces.Details
remodel kitchen, baths & laundry in kind. no structural changes. upgrade electrical throughout. replace rotten siding at rear side wall. remove old and install new furnaces. | $38,000 |
| Nov 3, 2020 | Completed final sign-off Oct 2023 | 30 Camellia Av | ground floor rooms down + minor lightwell infill: new bedroom, bathroom & family room. remodel stair. no exterior work visible from public right-of-way.Details
ground floor rooms down + minor lightwell infill: new bedroom, bathroom & family room. remodel stair. no exterior work visible from public right-of-way. | $75,000 |
| Oct 19, 2020 | Completed final sign-off Jan 2021 | 651 Scott St | unit #9: kitchen/bath remodel in kind. upgrade electrical, plumbing. no structural changes.Details
unit #9: kitchen/bath remodel in kind. upgrade electrical, plumbing. no structural changes. | $38,000 |
| Sep 28, 2020 | Completed final sign-off Apr 2022 | 1422 Thomas Av | convert a bed rm into study,· convert master br on top floor into 2 bedroom w/ 195 sf addition,· move (e) 47 sf bath, add (n) 47 sf bath,· convert 416 sf of (e) 888 sf basement space into family rm & laundry,· new stair throughout all 3 levels,· relocate mechanical in basement.Details
convert a bed rm into study,· convert master br on top floor into 2 bedroom w/ 195 sf addition,· move (e) 47 sf bath, add (n) 47 sf bath,· convert 416 sf of (e) 888 sf basement space into family rm & laundry,· new stair throughout all 3 levels,· relocate mechanical in basement. | $240,000 |
| Aug 31, 2020 | Completed final sign-off May 2023 | 2546 42nd Av | rear horizontal addition & interior remodel: add (3) bedrooms & (2) bathrooms, remodel kitchen & dining, add new rear deck & stair, new exterior windows, doors, & skylights at rear. no exterior work visible from street.Details
rear horizontal addition & interior remodel: add (3) bedrooms & (2) bathrooms, remodel kitchen & dining, add new rear deck & stair, new exterior windows, doors, & skylights at rear. no exterior work visible from street. | $180,000 |
| Aug 21, 2020 | Completed final sign-off Nov 2024 | 1180 Plymouth Av | comply w/ nov #202184388: revision to #201910316044: demo more than 75% interior floors & walls throughout. interior remodel at (e) dwelling unit: (n) kitchen, living, dining, 4 bedrooms, 2 baths. adu under density: (n) kitchen, living, dining, 4 bedrooms, 2 baths.Details
comply w/ nov #202184388: revision to #201910316044: demo more than 75% interior floors & walls throughout. interior remodel at (e) dwelling unit: (n) kitchen, living, dining, 4 bedrooms, 2 baths. adu under density: (n) kitchen, living, dining, 4 bedrooms, 2 baths. | $35,000 |
| Jun 22, 2020 | Completed final sign-off Sep 2020 | 1072 Gilman Av | 1 kitchen & 1 bath remodel in-kind: replace finishes, cabinetry, new drywall in kind. existing plumbing fixtures to remain in same location. interior work only: no structural work or work visible from the street.Details
1 kitchen & 1 bath remodel in-kind: replace finishes, cabinetry, new drywall in kind. existing plumbing fixtures to remain in same location. interior work only: no structural work or work visible from the street. | $8,000 |