Reeland Investments
- Based in
- Upland
- On San Francisco permits
- Apr 2022 to Feb 2023
- Last 24 months
- 0 permits filed
4 permits since 2000: 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 expired or cancelled. Typically 13 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2022 | Expired or cancelled expired Apr 2024 | 153 Silliman St | to comply with nov 202289094: remodel like for like repair: new plumbing, electrical: remodel kitchen - replace fixtures, flooring, & cabinets. bathroom remodel - replace tiles & fixtures: no moving walls. not layout changes.Details
to comply with nov 202289094: remodel like for like repair: new plumbing, electrical: remodel kitchen - replace fixtures, flooring, & cabinets. bathroom remodel - replace tiles & fixtures: no moving walls. not layout changes. | $70,000 |