Back to kitchen remodel contractors
Redoak Construction
- Based in
- El Sobrante
- On San Francisco permits
- Jul 2018 to Sep 2024
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 489 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 12, 2023 | Completed final sign-off May 2024 | 172 16th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). alteration of service equipment. installing gas line. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). alteration of service equipment. installing gas line. need a "green tag" for electrical service equipment. | $145,000 |