Back to bathroom remodel contractors
Red House Construction
- Based in
- Antioch
- On San Francisco permits
- Nov 2017 to Feb 2026
- Last 24 months
- 3 permits filed
16 permits since 2000: 9 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 2 completed, 2 in progress, 2 never finaled. Typically 26 days from filing to permit and 286 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2026 | In progress issued Jun 2026 | 667 02nd Av | ground/f garage level interior remodeling, replace foundations & slab on grade per plan, add a bathroom to e) storage areaDetails
ground/f garage level interior remodeling, replace foundations & slab on grade per plan, add a bathroom to e) storage area | $10,000 |
| Oct 25, 2024 | Completed final sign-off May 2025 | 2963 Pacific Av | remodel master bathroom and guest bathroom no change on framing two sconce light on guess bathrooom- maintain accessibility details- adaDetails
remodel master bathroom and guest bathroom no change on framing two sconce light on guess bathrooom- maintain accessibility details- ada | $55,000 |
| Dec 22, 2023 | In progress issued Apr 2024 | 667 02nd Av | reconfigure extg bathroom and add a half bath in both unit floors. 2 remodel bath and 2 new half bath. total 4.Details
reconfigure extg bathroom and add a half bath in both unit floors. 2 remodel bath and 2 new half bath. total 4. | $20,000 |
| Jun 5, 2023 | Never finaled issued Jun 2023, no final | 669 02nd Av | remodel bathroom kitchen and update electric siding repair on both units (light well) and windows (8) replace no front facing of buiding. install new drywall 5/8 like for like. no structural, no framing modificationDetails
remodel bathroom kitchen and update electric siding repair on both units (light well) and windows (8) replace no front facing of buiding. install new drywall 5/8 like for like. no structural, no framing modification | $65,000 |
| Dec 16, 2022 | Never finaled issued Dec 2022, no final | 667 02nd Av | remodel kitchen, bathroom, update electric new panel and add subpanel. replace garage door, and replace all windows at rear facade, and comply with with nov# 202298661.Details
remodel kitchen, bathroom, update electric new panel and add subpanel. replace garage door, and replace all windows at rear facade, and comply with with nov# 202298661. | $150,000 |
| Jul 25, 2019 | Completed final sign-off Sep 2020 | 1049 Stanyan St | 1st fl: add office, family room, and 1 full bath. add interior staircase.Details
1st fl: add office, family room, and 1 full bath. add interior staircase. | $18,000 |