Recon Dragon & Building
- Based in
- Pittsburg
- On San Francisco permits
- Aug 2025 to Sep 2026
- Last 24 months
- 8 permits filed
8 permits since 2000: 2 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress. Typically 357 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2025 | In progress issued Sep 2026 | 2320 Ulloa St | renovate (e)ground flr w/ new bedrm & bathrm. relocated laundry to garage. enclose (e) lightwell, new inter connecting stair. relocated bathrm @ main flr, new finishes @ (e)kitchen. new elec wiring & lighting @ reconfigured areas & throughout lower lvl. adjust slab on grade. repairs & infill @ roofDetails
renovate (e)ground flr w/ new bedrm & bathrm. relocated laundry to garage. enclose (e) lightwell, new inter connecting stair. relocated bathrm @ main flr, new finishes @ (e)kitchen. new elec wiring & lighting @ reconfigured areas & throughout lower lvl. adjust slab on grade. repairs & infill @ roof | $259,417 |