Back to kitchen remodel contractors
Rdz Construction
- Based in
- Sonoma
- On San Francisco permits
- Sep 2022 to Apr 2023
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 1 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2023 | Completed final sign-off Sep 2023 | 1177 California St | #1510: remodeling of 1660 sq 3 bdrm & 3 bathrooms on 15th floor on front of bldg. in kind work of bathroom & kitchen plmg/elec. fixtures, plmg & appliances. reconfigure 2 bathrooms, remove toilet from powder bath install stackable washer/dryer unit. open kitchen wall into living area,Details
#1510: remodeling of 1660 sq 3 bdrm & 3 bathrooms on 15th floor on front of bldg. in kind work of bathroom & kitchen plmg/elec. fixtures, plmg & appliances. reconfigure 2 bathrooms, remove toilet from powder bath install stackable washer/dryer unit. open kitchen wall into living area, | $62,000 |
| Sep 20, 2022 | Never finaled issued Sep 2022, no final | 1177 California St | unit 608: replace tub in bathroom, shower, replace fixtures, sink, toilet; replace kitchen counters, sink, repair/replace lighting fixtures. replace in-kind.Details
unit 608: replace tub in bathroom, shower, replace fixtures, sink, toilet; replace kitchen counters, sink, repair/replace lighting fixtures. replace in-kind. | $13,000 |