Rcgc
- Based in
- Galt
- On San Francisco permits
- Oct 2012 to Jan 2024
- Last 24 months
- 0 permits filed
29 permits since 2000: 24 completed, 5 never finaled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 69 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2021 | Never finaled issued May 2021, no final | 2151 45th Av | 1st fl: partial new slab to create a minimum 8'0" ceiling space to include a new family room, bedroom, & walk-in closet. 2nd fl: renovate (e) kitchen, bathroom, & new stairs to connect to 1st floor.Details
1st fl: partial new slab to create a minimum 8'0" ceiling space to include a new family room, bedroom, & walk-in closet. 2nd fl: renovate (e) kitchen, bathroom, & new stairs to connect to 1st floor. | $85,000 |