Back to kitchen remodel contractors
Ray Tom Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2010 to Jul 2024
- Last 24 months
- 0 permits filed
17 permits since 2000: 13 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 87 days from filing to permit and 393 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2023 | Completed final sign-off Dec 2023 | 2642 19th Av | interior remodel in 2nd flr: remodel extg kitchen and bathroom; in 1st flr: add 2-bedrooms and 1-bathroom, 1- media room w/ wet bar and a storage room.Details
interior remodel in 2nd flr: remodel extg kitchen and bathroom; in 1st flr: add 2-bedrooms and 1-bathroom, 1- media room w/ wet bar and a storage room. | $80,000 |
| Jul 18, 2022 | Completed final sign-off Feb 2025 | 1632 Quint St | abate violation#2021-78477.kitchen setup and all work done to the ground floor unit should be up to code/standard with adu.include n/ lighting & plumbing.provide an independent entry door for adu,provide exist passageway by bldg and one hour fire rated partition wall @ garage.per ordinance #162-16Details
abate violation#2021-78477.kitchen setup and all work done to the ground floor unit should be up to code/standard with adu.include n/ lighting & plumbing.provide an independent entry door for adu,provide exist passageway by bldg and one hour fire rated partition wall @ garage.per ordinance #162-16 | $38,000 |
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 136 Kingston St | replace water damaged drywall; replace water damanged kitchen cabinets and count top; install 1 tankless water heater.Details
replace water damaged drywall; replace water damanged kitchen cabinets and count top; install 1 tankless water heater. | $25,000 |
| Dec 10, 2018 | Completed final sign-off Nov 2019 | 854 Prague St | no change to bldg footprint. relocate interior stair. remodel kitchen and bath at floor 2. new bath and bedroom at floor 1. new windows at north, west of east facade.Details
no change to bldg footprint. relocate interior stair. remodel kitchen and bath at floor 2. new bath and bedroom at floor 1. new windows at north, west of east facade. | $105,000 |
| Aug 6, 2018 | Completed final sign-off Jul 2021 | 135 Wawona St | horizontal rear addition @ 3rd flr & interior renovation of (e) 3 story single family bldg. 2nd flr: relocate (e) kitchen, laundry rm & bathrm/(n) powder rm. 3rd flr: interior renovation of (e) bedrms & bathrm/ rear horizontal extension of (e) bedrm & new private deck, bathrm & study rm.Details
horizontal rear addition @ 3rd flr & interior renovation of (e) 3 story single family bldg. 2nd flr: relocate (e) kitchen, laundry rm & bathrm/(n) powder rm. 3rd flr: interior renovation of (e) bedrms & bathrm/ rear horizontal extension of (e) bedrm & new private deck, bathrm & study rm. | $200,000 |
| Feb 16, 2017 | Expired or cancelled expired Apr 2025 | 1727 Hayes St | interior remodel unit 1727a to reloc kitchen&provide open flr plan w/enlarged lr.remodel(e)bathrm finishes&enlarge shower.add 2nd bathroom& laundry area.add skylite to gable roof btwn(e)rafters.no chg to strucl rafters,no chg visible fr public right of way to exterior facade of bldg.Details
interior remodel unit 1727a to reloc kitchen&provide open flr plan w/enlarged lr.remodel(e)bathrm finishes&enlarge shower.add 2nd bathroom& laundry area.add skylite to gable roof btwn(e)rafters.no chg to strucl rafters,no chg visible fr public right of way to exterior facade of bldg. | $80,000 |