Back to kitchen remodel contractors
Raum
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Sep 2017
- Last 24 months
- 0 permits filed
52 permits since 2000: 42 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 18 completed, 1 never finaled. Typically 0 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2017 | Completed final sign-off Mar 2018 | 1338 24th Av | to comply with nov 201649281: renovation of (e) 932 sf residential unit. improve bathroom & legalize (e) kitchen areas. mech/ele/plbg work under sep permitDetails
to comply with nov 201649281: renovation of (e) 932 sf residential unit. improve bathroom & legalize (e) kitchen areas. mech/ele/plbg work under sep permit | $40,000 |
| Mar 23, 2015 | Completed final sign-off Jul 2015 | 2751 42nd Av | at garage level, construct new wall for new full bath, bedrooms and laundry. 2/f- remove wall @ dining, remodel (e) bath and kitchen, new fixtures and outlets, replace window @ rear and skylights. repair/replace (e) concrete slab @ 1/f.Details
at garage level, construct new wall for new full bath, bedrooms and laundry. 2/f- remove wall @ dining, remodel (e) bath and kitchen, new fixtures and outlets, replace window @ rear and skylights. repair/replace (e) concrete slab @ 1/f. | $45,000 |
| Mar 23, 2015 | Completed final sign-off Oct 2015 | 1282 39th Av | at garage level, construct new wall for new bath, legalized (e) family room. at 2/f, reconfigure (e) floor layout, remodel (e) bath & kitchen. new skylights, new outlets and light fixtures. replace front & rear windows, new stucco at front facade.Details
at garage level, construct new wall for new bath, legalized (e) family room. at 2/f, reconfigure (e) floor layout, remodel (e) bath & kitchen. new skylights, new outlets and light fixtures. replace front & rear windows, new stucco at front facade. | $45,000 |
| Jun 26, 2014 | Completed final sign-off Dec 2014 | 1818 Broadway | unit 102: remodel kitchen (15'x8')-cabinets, countertop, plumging & lighting fixtures, appliances, flooring; remodel bathroom (8'x8')-floor & wall tiles, vanity cabinet, countertop, plumbing & light fixture; upgrade electrical panel; install 8 recessed lights @ living room, 2 recessed lights @ hallDetails
unit 102: remodel kitchen (15'x8')-cabinets, countertop, plumging & lighting fixtures, appliances, flooring; remodel bathroom (8'x8')-floor & wall tiles, vanity cabinet, countertop, plumbing & light fixture; upgrade electrical panel; install 8 recessed lights @ living room, 2 recessed lights @ hall | $20,000 |
| May 22, 2014 | Completed final sign-off May 2014 | 1774 38th Av | revision to appl #2014.0213.8435: kitchen cabinet layout revision (upper floor), remodel existing bathroom (upper floor) instead of previous proposed two bathrooms.Details
revision to appl #2014.0213.8435: kitchen cabinet layout revision (upper floor), remodel existing bathroom (upper floor) instead of previous proposed two bathrooms. | |
| Apr 9, 2014 | Completed final sign-off Aug 2014 | 559 05th Av | remodel exiting kitchen and conversion of exisitng water cloet and pantry into 2 full bathrooms. existing bathroom and kitchen windows to be replaced. no exterior changes proposed. all work on the top floor. new skylightDetails
remodel exiting kitchen and conversion of exisitng water cloet and pantry into 2 full bathrooms. existing bathroom and kitchen windows to be replaced. no exterior changes proposed. all work on the top floor. new skylight | $27,000 |
| Feb 13, 2014 | Completed final sign-off May 2014 | 1774 38th Av | remodel (e) kitchen, replace 4 windows at center patio with (n) vinyl windows, remodel/reconfigure bathroom, new powder room, new electrical panel upgrade, new furnace & water heater.Details
remodel (e) kitchen, replace 4 windows at center patio with (n) vinyl windows, remodel/reconfigure bathroom, new powder room, new electrical panel upgrade, new furnace & water heater. | $20,000 |
| Jul 3, 2013 | Completed final sign-off Dec 2013 | 818 Shields St | work at 2nd floor - alternate existing floor layout included removing & construction interior walls, new light fixtures & outlets, remodel (e) bathroom & kitchen, new skylight.Details
work at 2nd floor - alternate existing floor layout included removing & construction interior walls, new light fixtures & outlets, remodel (e) bathroom & kitchen, new skylight. | $32,000 |
| May 28, 2013 | Completed final sign-off Aug 2013 | 219 States St | 1. remodel existing kitchen 2. replace existing wood burning fireplace with new gas insert fireplace unit. 3. install new ceiling fan at upper floor study areaDetails
1. remodel existing kitchen 2. replace existing wood burning fireplace with new gas insert fireplace unit. 3. install new ceiling fan at upper floor study area | $12,000 |
| Apr 3, 2013 | Completed final sign-off May 2013 | 1720 48th Av | remove/replace 4'-0" base sink cabinet @ kitchen, tile kitchen floor.Details
remove/replace 4'-0" base sink cabinet @ kitchen, tile kitchen floor. | $900 |
| Jan 2, 2013 | Completed final sign-off Mar 2013 | 847 40th Av | demo & remove (e) deteriorated wood deck & patio. new deck. replace all windows except front facade windows. 2nd & 3rd flrs remodel (e) kitchen & (e) bathroom, (n) interior walls, (n) light, fixts & outlets. new master bathroom on 3rd fl.Details
demo & remove (e) deteriorated wood deck & patio. new deck. replace all windows except front facade windows. 2nd & 3rd flrs remodel (e) kitchen & (e) bathroom, (n) interior walls, (n) light, fixts & outlets. new master bathroom on 3rd fl. | $48,000 |
| Dec 18, 2012 | Completed final sign-off Jan 2013 | 3033 Turk St | unit #4-remodel (e) apartment on 2nd floor-includes remodel kitchen, new gyp board & insulation throughout unit in kind. new flooring at bathroomDetails
unit #4-remodel (e) apartment on 2nd floor-includes remodel kitchen, new gyp board & insulation throughout unit in kind. new flooring at bathroom | $12,000 |
| Jul 23, 2012 | Completed final sign-off Dec 2012 | 1109 Montgomery St | unit #1109-remodel & relocate kitchen to (e) bedroom & convert (e) kitchen location into new study, remodel bathroom, add 1 new bathroom & laundry closet. new wood floors or refinish (e) flooring. replace window visible from the street, 12 totalDetails
unit #1109-remodel & relocate kitchen to (e) bedroom & convert (e) kitchen location into new study, remodel bathroom, add 1 new bathroom & laundry closet. new wood floors or refinish (e) flooring. replace window visible from the street, 12 total | $55,000 |
| Jul 18, 2012 | Completed final sign-off May 2013 | 2472 39th Av | remodel kitchen, no wall changes. new skylight. remodel baths, upper fl, master bath, hall bath. add recessed lights to family rm at gr fl, 8 fixtures. replace elec/plumbing fixtures, wall, ceiling, flooring, finishes.Details
remodel kitchen, no wall changes. new skylight. remodel baths, upper fl, master bath, hall bath. add recessed lights to family rm at gr fl, 8 fixtures. replace elec/plumbing fixtures, wall, ceiling, flooring, finishes. | $27,000 |
| Jul 20, 2011 | Completed final sign-off Dec 2011 | 2686 40th Av | add one new full bathroom, bedroom, and family room at ground floor. replace (e) slab w/ new conc. slab. remodel (e) bath and kitchen at 2nd flDetails
add one new full bathroom, bedroom, and family room at ground floor. replace (e) slab w/ new conc. slab. remodel (e) bath and kitchen at 2nd fl | $40,000 |
| Jul 11, 2011 | Completed final sign-off Oct 2011 | 258 16th Av | remodel bathroom on 3rd floor; convert existing toilet room in 3rd floor to laundry room; add 10' linear feet of cabinets at kitchen; dry rot repair at garage opening; relocate/replace (e) laundry sink at garage & replace water heater & furnace. update electrical outlets at 2nd flr living rm,Details
remodel bathroom on 3rd floor; convert existing toilet room in 3rd floor to laundry room; add 10' linear feet of cabinets at kitchen; dry rot repair at garage opening; relocate/replace (e) laundry sink at garage & replace water heater & furnace. update electrical outlets at 2nd flr living rm, | $14,000 |
| Feb 7, 2011 | Completed final sign-off Feb 2012 | 125 Juanita Wy | 1st floor:convert extg family room to new master bedroom and bathroom.2nd floor: modify extg kitchen and bedrooms. construct new stair from 2nd floor to 1st floor. new patio and landscape wall at rear yard. provide laterial resistance system to bldg voluntary.Details
1st floor:convert extg family room to new master bedroom and bathroom.2nd floor: modify extg kitchen and bedrooms. construct new stair from 2nd floor to 1st floor. new patio and landscape wall at rear yard. provide laterial resistance system to bldg voluntary. | $122,000 |
| Jan 25, 2011 | Completed final sign-off Oct 2011 | 258 16th Av | 2nd fl: remodel e kitchen and half toilet. 3rd fl: convert e closet to full bathDetails
2nd fl: remodel e kitchen and half toilet. 3rd fl: convert e closet to full bath | $18,000 |
| Nov 18, 2010 | Never finaled issued Nov 2010, no final | 2602 Sacramento St | (1) remove all sheetrock (damaged) at kitchen, bath, bedroom, upgrade electrical. (2) replace existing kitchen cabinet, countertop (full remodel); (3) replace existing plumbing fixtures @ bathroom (full remodel) not moving or adding structural walls.Details
(1) remove all sheetrock (damaged) at kitchen, bath, bedroom, upgrade electrical. (2) replace existing kitchen cabinet, countertop (full remodel); (3) replace existing plumbing fixtures @ bathroom (full remodel) not moving or adding structural walls. | $6,800 |