Back to bathroom remodel contractors
Ramos General Construction Inc.
- Based in
- San Francsico
- On San Francisco permits
- Aug 2016 to May 2026
- Last 24 months
- 9 permits filed
50 permits since 2000: 34 completed, 8 in progress, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 19 completed, 3 in progress, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2026 | In progress issued Jun 2026 | 1961 California St | 1) convert (e) storage to media room @ ground floor. build (n) bathroom at ground floor.Details
1) convert (e) storage to media room @ ground floor. build (n) bathroom at ground floor. | $20,000 |
| Feb 4, 2026 | In progress issued Feb 2026 | 1515 Golden Gate Av | remodel (e) bathroom. (e) layout to remain. new shower pan.Details
remodel (e) bathroom. (e) layout to remain. new shower pan. | $25,000 |
| Jul 3, 2025 | In progress issued Sep 2025 | 432 Dewey Bl | renovate the (e) playroom into a master bathroom. renovate the (e) bedroom closet to provide for stairs to the room above the (e) garage. (e) storage room above the garage to be renovated into an office and closet w/ 8' ceiling.Details
renovate the (e) playroom into a master bathroom. renovate the (e) bedroom closet to provide for stairs to the room above the (e) garage. (e) storage room above the garage to be renovated into an office and closet w/ 8' ceiling. | $75,000 |
| Jul 2, 2025 | Completed final sign-off Mar 2026 | 25 Admiral Av | remove unpermitted construction at 1st fl. convert rear portion of garage into day care room. day care room max 12 kids. install (n) bathroom at 1st fl. install fire rated corridor along garage. replace rear yard entry door.Details
remove unpermitted construction at 1st fl. convert rear portion of garage into day care room. day care room max 12 kids. install (n) bathroom at 1st fl. install fire rated corridor along garage. replace rear yard entry door. | $75,000 |
| Jun 16, 2025 | Completed final sign-off Sep 2025 | 932 Stanyan St | unit #3: bathroom remodel and shower pan in kind. new electrical upgrade. (e) panel to remain.Details
unit #3: bathroom remodel and shower pan in kind. new electrical upgrade. (e) panel to remain. | $45,000 |
| Dec 13, 2024 | Completed final sign-off Jun 2025 | 200 Brannan St | 3 bathroom remodel in (e) covered multi-story dwelling unit. (e) layout to remain. new curbed shower pan at master bathroom to replace tub. maintain existing adaptabiity per2001 cbc chapter 11a at main entry floor bathroom. replace all fixtures like for likeDetails
3 bathroom remodel in (e) covered multi-story dwelling unit. (e) layout to remain. new curbed shower pan at master bathroom to replace tub. maintain existing adaptabiity per2001 cbc chapter 11a at main entry floor bathroom. replace all fixtures like for like | $65,000 |
| Dec 9, 2024 | Expired or cancelled expired Feb 2026 | 276 States St | half bathroom remodel (e) toilet layout to remain upgrade vanity angle stopsDetails
half bathroom remodel (e) toilet layout to remain upgrade vanity angle stops | $34,000 |
| Jun 20, 2024 | Completed final sign-off Aug 2024 | 458 Liberty St | remodel (e) (1) bathroom. no layout changes or wall removal. upgrade to mep and new shower pan.Details
remodel (e) (1) bathroom. no layout changes or wall removal. upgrade to mep and new shower pan. | $36,000 |
| Apr 24, 2024 | Completed final sign-off Jun 2024 | 454 Liberty St | bathroom remodel, existing layout to remain , upgrade plumbing fixtures, new shower pan, upgrade electrical and new heat mat flooring. (no moving walls).Details
bathroom remodel, existing layout to remain , upgrade plumbing fixtures, new shower pan, upgrade electrical and new heat mat flooring. (no moving walls). | $36,000 |
| Feb 22, 2024 | Completed final sign-off Jan 2025 | 989 Duncan St | 1st/f: kitchen remodel, full bath & half bath remodel (e) layout to remain. 2nd/f: kitchen remodel, taken & replace (e) layout to remain (interior only) total 2 kitchens & 2 bathsDetails
1st/f: kitchen remodel, full bath & half bath remodel (e) layout to remain. 2nd/f: kitchen remodel, taken & replace (e) layout to remain (interior only) total 2 kitchens & 2 baths | $68,000 |
| Oct 19, 2023 | Completed final sign-off Mar 2024 | 88 King St | kitchen remodel (existing layout to remain) plumbing fixtures to remain. electrical fixtures to remain, and replacing vanity at two bathrooms, existing plumbing rough to remain.Details
kitchen remodel (existing layout to remain) plumbing fixtures to remain. electrical fixtures to remain, and replacing vanity at two bathrooms, existing plumbing rough to remain. | $15,000 |
| Jun 14, 2023 | Never finaled issued Jul 2023, no final | 1139 Vallejo St | kitchen and bathroom remodel. upgrade electrical/ sub panel and new laundry. work located on 3rd floor. new hot water heater & heat pump. new washer and dryer. replace (e) fire place. add 2 new skylightsDetails
kitchen and bathroom remodel. upgrade electrical/ sub panel and new laundry. work located on 3rd floor. new hot water heater & heat pump. new washer and dryer. replace (e) fire place. add 2 new skylights | $15,000 |
| Mar 13, 2023 | Never finaled issued Mar 2023, no final | 200 Brannan St | kitchen remodel and guest bathroom updateDetails
kitchen remodel and guest bathroom update | $20,000 |
| Dec 10, 2021 | Completed final sign-off May 2023 | 650 De Haro St | replace (e) kitchen cabinets,exsiting layout to remain. remodel master bathroom, existing layout to remain. upgrade existing fireplace (to electric).Details
replace (e) kitchen cabinets,exsiting layout to remain. remodel master bathroom, existing layout to remain. upgrade existing fireplace (to electric). | $50,000 |
| Aug 9, 2021 | Completed final sign-off Jun 2022 | 198 Chattanooga St | 2nd fl: remodel kitchen, master bathroom led light and guest bathroom in-kind. (e) layout to remain. 3rd fl: replace (e) window in-kind @ master bath (not visible from street). no structual work. no alteration to wall & door, same size & location.Details
2nd fl: remodel kitchen, master bathroom led light and guest bathroom in-kind. (e) layout to remain. 3rd fl: replace (e) window in-kind @ master bath (not visible from street). no structual work. no alteration to wall & door, same size & location. | $55,000 |
| Mar 2, 2021 | Never finaled issued Mar 2021, no final | 2611 California St | lower bathroom remodel: replace plumbing fixtures at same location, electrical fixtures reamin in same location.Details
lower bathroom remodel: replace plumbing fixtures at same location, electrical fixtures reamin in same location. | $20,000 |
| Jul 21, 2020 | Completed final sign-off Jan 2021 | 2611 California St | in place kitchen remodel 2nd fl. in place bathroom remodel 2/f, 3/f fl. partial demo @ (e) brick chimney, gas insert fplc at master bath.Details
in place kitchen remodel 2nd fl. in place bathroom remodel 2/f, 3/f fl. partial demo @ (e) brick chimney, gas insert fplc at master bath. | $75,000 |
| Feb 12, 2020 | Completed final sign-off Sep 2021 | 177 Day St | interior renovation with conversion of partial garage to living. partial foundation & slab replacement. kitchen renovation. relocate & reno 2 full baths. add 1 full bath at 1st fl. relocate connecting stair between 1st & 2nd fl. nw rear roof deck over 1st fl. new front door opening. 4 replacementDetails
interior renovation with conversion of partial garage to living. partial foundation & slab replacement. kitchen renovation. relocate & reno 2 full baths. add 1 full bath at 1st fl. relocate connecting stair between 1st & 2nd fl. nw rear roof deck over 1st fl. new front door opening. 4 replacement | $200,000 |
| Jun 5, 2019 | Never finaled issued Aug 2023, no final | 774 Duncan St | 2nd fl rear & side expansion. (n) roof deck @ 2nd fl. interior renovation including kitchen, relocate powder room, add 2nd full bath @ 1st fl, (e) full bath renovation @ 2nd fl. (n) interior stair, (n) exterior doors & windows @ rear sides, (n) skylightsDetails
2nd fl rear & side expansion. (n) roof deck @ 2nd fl. interior renovation including kitchen, relocate powder room, add 2nd full bath @ 1st fl, (e) full bath renovation @ 2nd fl. (n) interior stair, (n) exterior doors & windows @ rear sides, (n) skylights | $300,000 |
| May 13, 2019 | Completed final sign-off Nov 2019 | 2667 Clay St | revision to 201812047384, reverse stair direction. reconfigure powder room and office. reconfigure 1st fl bath, laundry, storage. replace dining room doors & kitchen windows at rearDetails
revision to 201812047384, reverse stair direction. reconfigure powder room and office. reconfigure 1st fl bath, laundry, storage. replace dining room doors & kitchen windows at rear | |
| May 8, 2019 | Completed final sign-off Aug 2019 | 408 Laurel St | master bathroom remodel. fixts will remain at same location, new tile & shower pan. replace floor tile in powder bathroom.Details
master bathroom remodel. fixts will remain at same location, new tile & shower pan. replace floor tile in powder bathroom. | $50,000 |
| Dec 4, 2018 | Completed final sign-off Nov 2019 | 2667 Clay St | expansion of existing garage and remodel of 1st & 2nd floor. 1st floor - garage expansion, relocation of bath and w/d. new storage, wind cellar and stairs;2nd fl - kitchen expansion and new officeDetails
expansion of existing garage and remodel of 1st & 2nd floor. 1st floor - garage expansion, relocation of bath and w/d. new storage, wind cellar and stairs;2nd fl - kitchen expansion and new office | $20,000 |
| Sep 18, 2018 | Completed final sign-off Nov 2019 | 2667 Clay St | first floor new bedroom, new bathroom, new closet. change to front facade lower door & 2 new windows.Details
first floor new bedroom, new bathroom, new closet. change to front facade lower door & 2 new windows. | $10,000 |
| Aug 21, 2018 | Completed final sign-off May 2019 | 300 Beale St | bathroom remodel. demo the existing tile floors and wall. new toilet. new fixturesDetails
bathroom remodel. demo the existing tile floors and wall. new toilet. new fixtures | $35,000 |
| May 7, 2018 | Completed final sign-off Aug 2018 | 2253 Filbert St | remove existing bath/shower, toilet & sink, demo existing partition wall bewtween hall & bath. add new partition wall between hall & bath, install new floor & wall tile, install new led lighting & gfi's & dimmers, install new plumbing for bath shower, install new tub, install new plumbing forDetails
remove existing bath/shower, toilet & sink, demo existing partition wall bewtween hall & bath. add new partition wall between hall & bath, install new floor & wall tile, install new led lighting & gfi's & dimmers, install new plumbing for bath shower, install new tub, install new plumbing for | $10,000 |
| Jan 23, 2018 | Completed final sign-off Jul 2018 | 300 Beale St | unit #602 - minor interior renovation of select areas, some new fixture bathroom. addition of partition wall in lower bedrooms.Details
unit #602 - minor interior renovation of select areas, some new fixture bathroom. addition of partition wall in lower bedrooms. | $50,000 |
| Aug 11, 2016 | Completed final sign-off Nov 2021 | 130 Saint Germain Av | renovation & addition to single family house. addition is underneath the (e) house. renovate & expand 2nd fl to include master bedroom, (2) baths, bedroom, office, laundry. add (n) 1st fl with (2) bedrooms, (2)baths. (n) interior stair.Details
renovation & addition to single family house. addition is underneath the (e) house. renovate & expand 2nd fl to include master bedroom, (2) baths, bedroom, office, laundry. add (n) 1st fl with (2) bedrooms, (2)baths. (n) interior stair. | $380,000 |