Back to kitchen remodel contractors
Ramlochan Construction
- Based in
- San Leandro
- On San Francisco permits
- Dec 2018 to May 2019
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 27 days from filing to permit and 375 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2019 | Completed final sign-off Jun 2020 | 658 15th Av | remove wall between dining rm and kitchen, remove wall between sitting rm and kitchen/dining rm. install a beam of e removed wall in order to carry load of the 2nd story load/joists. rebuild garage stairs. redesign kitchen cabnts with a new elec layout. legalize gr fl full bathDetails
remove wall between dining rm and kitchen, remove wall between sitting rm and kitchen/dining rm. install a beam of e removed wall in order to carry load of the 2nd story load/joists. rebuild garage stairs. redesign kitchen cabnts with a new elec layout. legalize gr fl full bath | $52,000 |