Back to kitchen remodel contractors
Rake Construction Inc
- Based in
- San Jose
- On San Francisco permits
- Jun 2023 to Jul 2026
- Last 24 months
- 6 permits filed
9 permits since 2000: 7 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 150 days from filing to permit and 261 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2024 | Completed final sign-off Mar 2025 | 2483 27th Av | new dwelling unit (adu) per california goverment code section 65852.2. 1/f modify (e) floor space to adu included bedroom bathroom, family, and new kitchen (571 sq ft). - 2483a 27th ave.Details
new dwelling unit (adu) per california goverment code section 65852.2. 1/f modify (e) floor space to adu included bedroom bathroom, family, and new kitchen (571 sq ft). - 2483a 27th ave. | $145,000 |
| Mar 29, 2024 | Completed final sign-off Sep 2025 | 8 Regent St | new dwelling unit(adu) (8a regent st) per government code section 65852.2 at 1st floor, new unit included bedroom, bathroom, media room and kitchen, 953 sf.Details
new dwelling unit(adu) (8a regent st) per government code section 65852.2 at 1st floor, new unit included bedroom, bathroom, media room and kitchen, 953 sf. | $105,000 |