Back to kitchen remodel contractors
Radiant Construction Company
- Based in
- Oakland
- On San Francisco permits
- Apr 2002 to Sep 2026
- Last 24 months
- 10 permits filed
82 permits since 2000: 68 completed, 4 in progress, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 14 completed, 2 in progress, 1 expired or cancelled. Typically 2 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 4, 2026 | In progress issued Jun 2026 | 1983 15th Av | interior kitchen (2/f) and bathroom (3/f) remodel of (e) single family residential. no exterior changes. no change to existing square footage.Details
interior kitchen (2/f) and bathroom (3/f) remodel of (e) single family residential. no exterior changes. no change to existing square footage. | $15,000 |
| Oct 31, 2025 | In progress issued Oct 2025 | 742 33rd Av | remodel kitchen and 1/2 bathroom on the 2/f, replce window in the kitchen, not street visible.Details
remodel kitchen and 1/2 bathroom on the 2/f, replce window in the kitchen, not street visible. | $25,000 |
| Jun 12, 2025 | Completed final sign-off Feb 2026 | 5125 Anza St | violation for 201879892; 1) demolish basement bathroom and kitchen. 2) legalize existing non-load bearing partitions. 3) legalize lights and outlets.Details
violation for 201879892; 1) demolish basement bathroom and kitchen. 2) legalize existing non-load bearing partitions. 3) legalize lights and outlets. | $8,500 |
| Dec 11, 2024 | Completed final sign-off Apr 2025 | 539 Nevada St | kitchen remodel in-kind w/ new appliances & plumbing fixtures.Details
kitchen remodel in-kind w/ new appliances & plumbing fixtures. | $8,000 |
| Aug 8, 2024 | Completed final sign-off Feb 2025 | 587 41st Av | 2nd fl remodel kitchen and bath. add 1 full bathDetails
2nd fl remodel kitchen and bath. add 1 full bath | $60,000 |
| Oct 4, 2019 | Completed final sign-off Aug 2020 | 3251 20th Av | interior ti for small cafe in e vacant gr fl mall. commercia ti space. work to include removal of e interior partitons and equip, new int partitions, new kitchen and related equip, new casework, finishes, lighting.Details
interior ti for small cafe in e vacant gr fl mall. commercia ti space. work to include removal of e interior partitons and equip, new int partitions, new kitchen and related equip, new casework, finishes, lighting. | $195,000 |
| Aug 13, 2019 | Completed final sign-off Feb 2021 | 106 Gaven St | revision to 201907267110, remodel kitchen and bath on 2nd fl, add 1 full bath, convert e storage at 1st fl to 2 bedrooms, 2 bath, family rmDetails
revision to 201907267110, remodel kitchen and bath on 2nd fl, add 1 full bath, convert e storage at 1st fl to 2 bedrooms, 2 bath, family rm | $90,000 |
| Mar 28, 2019 | Completed final sign-off Feb 2020 | 1 Stanyan Bl | unit #2 inter ti for small cafe in an (e) vacant ground flr commercial tenant space. work to include new partitions, new accessible restroom, new kitchen and related equip, new casework. new finishes, and new lighting. (e) mech unit to remain, plm to design-build by cont.Details
unit #2 inter ti for small cafe in an (e) vacant ground flr commercial tenant space. work to include new partitions, new accessible restroom, new kitchen and related equip, new casework. new finishes, and new lighting. (e) mech unit to remain, plm to design-build by cont. | $180,000 |
| Aug 5, 2016 | Completed final sign-off Aug 2016 | 400 Beale St | replace kitchen cabinets and floor tilesDetails
replace kitchen cabinets and floor tiles | $2,500 |
| Sep 19, 2014 | Completed final sign-off Feb 2016 | 30 Aloha Av | interior renovation of 2nd floor, scope of work to include new 3/4 bath, renovation of (e) bathroom. removal of existing living room/kitchen walls, and reduction of size of (e) windows. mep. on seperate permit.Details
interior renovation of 2nd floor, scope of work to include new 3/4 bath, renovation of (e) bathroom. removal of existing living room/kitchen walls, and reduction of size of (e) windows. mep. on seperate permit. | $30,000 |
| Dec 17, 2013 | Completed final sign-off Mar 2014 | 200 Felton St | 1. remodel (3) three bathroom and kitchen. replace windows along front, side, and rear of building.Details
1. remodel (3) three bathroom and kitchen. replace windows along front, side, and rear of building. | $25,000 |
| May 1, 2013 | Expired or cancelled expired Apr 2015 | 24 Castle St | renovation of extg kitchen and additional bathroom at extg upper level. approx 165 sq ft.Details
renovation of extg kitchen and additional bathroom at extg upper level. approx 165 sq ft. | $25,000 |
| Jun 16, 2010 | Completed final sign-off Sep 2010 | 35 Lobos St | kitchen remodel; (n) cabinets, countertop, flooring. ground flr. bath, (n) tiles for shower enclosure & (n) shower pan. 2nd. flr. bath-(n) floor tiles. replace 4-windows & 2-sliding doors. windows 2-@ front (aluminum) & 2-@ back with sliding doors. provide high efficacy lights or t-24 occupancyDetails
kitchen remodel; (n) cabinets, countertop, flooring. ground flr. bath, (n) tiles for shower enclosure & (n) shower pan. 2nd. flr. bath-(n) floor tiles. replace 4-windows & 2-sliding doors. windows 2-@ front (aluminum) & 2-@ back with sliding doors. provide high efficacy lights or t-24 occupancy | $16,000 |
| Oct 15, 2008 | Completed final sign-off Jun 2009 | 1395 Silver Av | rework interior non-load bearing walls, new partitions, rework kitchen & bathrm, reconfigure interior stair, new flooring, new central gas furnance, new fence.Details
rework interior non-load bearing walls, new partitions, rework kitchen & bathrm, reconfigure interior stair, new flooring, new central gas furnance, new fence. | $85,000 |
| Aug 24, 2007 | Completed final sign-off Oct 2007 | 1042 Lake St | remodel kitchen.Details
remodel kitchen. | $8,000 |
| Apr 10, 2006 | Completed final sign-off Jun 2006 | 3483 18th St | (1) bathroom & kitchen, laundry room remodel . non structural.Details
(1) bathroom & kitchen, laundry room remodel . non structural. | $25,000 |
| Apr 7, 2006 | Completed final sign-off Sep 2006 | 4013 24th St | (1) bathroom and (1) kitchen remodel - non structuralDetails
(1) bathroom and (1) kitchen remodel - non structural | $20,000 |