Back to bathroom remodel contractors
R W Simone Company
- Based in
- San Francisco
- On San Francisco permits
- Oct 2003 to Oct 2014
- Last 24 months
- 0 permits filed
15 permits since 2000: 14 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2014 | Completed final sign-off Apr 2016 | 126 Post St | 2nd floor t.i. - adding partitions to create consultation rooms, treatment, office breakroom, existing bathrooms will have fixtures & finishes updated.new led lighting will replace existing lighting. mep work will be design build.Details
2nd floor t.i. - adding partitions to create consultation rooms, treatment, office breakroom, existing bathrooms will have fixtures & finishes updated.new led lighting will replace existing lighting. mep work will be design build. | $350,000 |
| Feb 10, 2014 | Completed final sign-off Oct 2015 | 765 Market St | project proposes an interior remodel to a single residential unit which includes a remodeled master bedroom, master bathroom, powder room, laundry room and kitchen. mechanical, electrical & plumbing on deferred permit submittal.Details
project proposes an interior remodel to a single residential unit which includes a remodeled master bedroom, master bathroom, powder room, laundry room and kitchen. mechanical, electrical & plumbing on deferred permit submittal. | $60,000 |
| May 16, 2006 | Completed final sign-off Aug 2006 | 1632 Vallejo St | unit #3 - remove &replace kitchen cabinets to same locations, existing in kind doors & windows with low e insulated glass at back deck. change bathroom doors with pocket doors, in existing non-bearing wall.Details
unit #3 - remove &replace kitchen cabinets to same locations, existing in kind doors & windows with low e insulated glass at back deck. change bathroom doors with pocket doors, in existing non-bearing wall. | $40,000 |
| Oct 19, 2005 | Completed final sign-off Mar 2006 | 220 Arguello Bl | repair water leak to back of house in bathroom where there is a deck above.open sheetrock to find leak & repair.examine siding & window & repair as needed.dry rot repair.Details
repair water leak to back of house in bathroom where there is a deck above.open sheetrock to find leak & repair.examine siding & window & repair as needed.dry rot repair. | $10,000 |
| Aug 26, 2005 | Completed final sign-off Feb 2006 | 723 Bay St | remodel bathroom install soaking tub handicap shower remove closet wall (non structural) for showerDetails
remodel bathroom install soaking tub handicap shower remove closet wall (non structural) for shower | $40,000 |