R W Simone Company
- Based in
- San Francisco
- On San Francisco permits
- Oct 2003 to Oct 2014
- Last 24 months
- 0 permits filed
15 permits since 2000: 14 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2014 | Completed final sign-off Apr 2016 | 126 Post St | 2nd floor t.i. - adding partitions to create consultation rooms, treatment, office breakroom, existing bathrooms will have fixtures & finishes updated.new led lighting will replace existing lighting. mep work will be design build.Details
2nd floor t.i. - adding partitions to create consultation rooms, treatment, office breakroom, existing bathrooms will have fixtures & finishes updated.new led lighting will replace existing lighting. mep work will be design build. | $350,000 |
| Feb 10, 2014 | Completed final sign-off Oct 2015 | 765 Market St | project proposes an interior remodel to a single residential unit which includes a remodeled master bedroom, master bathroom, powder room, laundry room and kitchen. mechanical, electrical & plumbing on deferred permit submittal.Details
project proposes an interior remodel to a single residential unit which includes a remodeled master bedroom, master bathroom, powder room, laundry room and kitchen. mechanical, electrical & plumbing on deferred permit submittal. | $60,000 |
| Oct 11, 2013 | Completed final sign-off Nov 2013 | 227 Steiner St | replace deck boards in 3rd story deck. less than 50%. not visible from the street. no structural workDetails
replace deck boards in 3rd story deck. less than 50%. not visible from the street. no structural work | $3,300 |
| May 16, 2006 | Completed final sign-off Aug 2006 | 1632 Vallejo St | unit #3 - remove &replace kitchen cabinets to same locations, existing in kind doors & windows with low e insulated glass at back deck. change bathroom doors with pocket doors, in existing non-bearing wall.Details
unit #3 - remove &replace kitchen cabinets to same locations, existing in kind doors & windows with low e insulated glass at back deck. change bathroom doors with pocket doors, in existing non-bearing wall. | $40,000 |
| Mar 10, 2006 | Completed final sign-off Jul 2006 | 530 Mangels Av | kitchen remodel, replace cbinets in same location. replace floor. appliances, upgrade electric to grcis & tile 24 lighting.Details
kitchen remodel, replace cbinets in same location. replace floor. appliances, upgrade electric to grcis & tile 24 lighting. | $30,000 |
| Oct 19, 2005 | Completed final sign-off Mar 2006 | 220 Arguello Bl | repair water leak to back of house in bathroom where there is a deck above.open sheetrock to find leak & repair.examine siding & window & repair as needed.dry rot repair.Details
repair water leak to back of house in bathroom where there is a deck above.open sheetrock to find leak & repair.examine siding & window & repair as needed.dry rot repair. | $10,000 |
| Aug 26, 2005 | Completed final sign-off Feb 2006 | 723 Bay St | remodel bathroom install soaking tub handicap shower remove closet wall (non structural) for showerDetails
remodel bathroom install soaking tub handicap shower remove closet wall (non structural) for shower | $40,000 |
| Aug 18, 2005 | Completed final sign-off Oct 2005 | 1632 Vallejo St | erect scaffold to front at all side dry rot repair (for entire bldng all sides), replace some windowDetails
erect scaffold to front at all side dry rot repair (for entire bldng all sides), replace some window | $40,000 |
| Jul 7, 2005 | Completed final sign-off Oct 2005 | 2139 Green St | #b- remodel kitchen,using same floor plan.new appliances,cabinets,countertops.2/f level,same locatioDetails
#b- remodel kitchen,using same floor plan.new appliances,cabinets,countertops.2/f level,same locatio | $45,000 |
| Apr 19, 2004 | Completed final sign-off Sep 2004 | 1632 Vallejo St | 1ts floor remodel of entry floor, kitchen & gas fire place.Details
1ts floor remodel of entry floor, kitchen & gas fire place. | $90,000 |
| Apr 14, 2004 | Completed final sign-off Jul 2004 | 41 Santa Ana Av | install fireplace (gas) & cabinet.gas to fireplace,add lights in sunroom.construction on sunroom onlDetails
install fireplace (gas) & cabinet.gas to fireplace,add lights in sunroom.construction on sunroom onl | $10,000 |
| Mar 23, 2004 | Completed final sign-off Mar 2004 | 345 Franklin St | repair brick verneer that was damaged by auto accident. some light framing, replace existing windowDetails
repair brick verneer that was damaged by auto accident. some light framing, replace existing window | |
| Feb 26, 2004 | Completed final sign-off Mar 2004 | 345 Franklin St | repair brick veneer that was damaged by auto accicent someight framing. replace (e) window (rebuild)Details
repair brick veneer that was damaged by auto accicent someight framing. replace (e) window (rebuild) | $3,000 |
| Dec 4, 2003 | Completed final sign-off Dec 2003 | 3233 Jackson St | put in beams in ceiling to support 3 ceiling joistsDetails
put in beams in ceiling to support 3 ceiling joists | $5,000 |
| Oct 8, 2003 | Expired or cancelled expired Apr 2014 | 2100 Vallejo St | demo existing cabinet, install new cabinet in bedroomDetails
demo existing cabinet, install new cabinet in bedroom | $5,700 |