Back to bathroom remodel contractors
R P Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Jul 2026
- Last 24 months
- 6 permits filed
94 permits since 2000: 86 completed, 1 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
50 bathroom remodel permits: 47 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2026 | In progress issued Jul 2026 | 40 Rockwood Ct | remodel existing bath at upper floor. no wall removal. no exterior work. general mep updates.Details
remodel existing bath at upper floor. no wall removal. no exterior work. general mep updates. | $25,000 |
| Jun 5, 2026 | Completed final sign-off Sep 2026 | 2314 43rd Av | add 37.5 sqft bathroom (1)garage for convenience. add new(18"x36" window for ventilation. no structural work. no footprint changes, no foundation work. general mep upgrades as needed.Details
add 37.5 sqft bathroom (1)garage for convenience. add new(18"x36" window for ventilation. no structural work. no footprint changes, no foundation work. general mep upgrades as needed. | $28,000 |
| Apr 28, 2025 | Completed final sign-off Oct 2025 | 2246 47th Av | convert e storage rm on gr fl to family guest bedroom. legalize e bath. add new 1 hr. fire rated exit corridor from yard to street. change 1 window escape type. relocate furnace and laundry. no structural changes, general mep upgrades.Details
convert e storage rm on gr fl to family guest bedroom. legalize e bath. add new 1 hr. fire rated exit corridor from yard to street. change 1 window escape type. relocate furnace and laundry. no structural changes, general mep upgrades. | $80,392 |
| Oct 9, 2024 | Completed final sign-off Dec 2024 | 1567 38th Av | remodel upstair kitchen, replace cabinets, counter, flooring, sink. replace master bath shower. hallway bath, tiles, upgrade plumbing fixtures in kind. no structure changes.Details
remodel upstair kitchen, replace cabinets, counter, flooring, sink. replace master bath shower. hallway bath, tiles, upgrade plumbing fixtures in kind. no structure changes. | $48,000 |
| Jan 16, 2024 | Completed final sign-off Oct 2024 | 1566 20th Av | develop ground fl rooms for den, mudroom, full bath, maintain laundry room, add partitions, no structural changes. repair concrete slab as needed. provide sleeper floors where possible. shear wealls at new space. insulate walls and ceiling. general mep upgrades.Details
develop ground fl rooms for den, mudroom, full bath, maintain laundry room, add partitions, no structural changes. repair concrete slab as needed. provide sleeper floors where possible. shear wealls at new space. insulate walls and ceiling. general mep upgrades. | $110,000 |
| Sep 8, 2023 | Completed final sign-off Mar 2024 | 2254 25th Av | remodel kitchen and bathroom in kind no location changeDetails
remodel kitchen and bathroom in kind no location change | $45,000 |
| Sep 8, 2023 | Completed final sign-off Dec 2023 | 1822 47th Av | remodel master bath in kind no change in locationDetails
remodel master bath in kind no change in location | $15,000 |
| Mar 27, 2023 | Completed final sign-off Oct 2023 | 535 Wilde Av | remodel kitchen, open wall, add beam and col, add plywood panels on (e) wall col. in garage add a bath at bedroom, no window or exterior door changes, bolt (e)foundtion as needed, relocate (e)furnace & wh general mep upgardes as neededDetails
remodel kitchen, open wall, add beam and col, add plywood panels on (e) wall col. in garage add a bath at bedroom, no window or exterior door changes, bolt (e)foundtion as needed, relocate (e)furnace & wh general mep upgardes as needed | $64,300 |
| Sep 8, 2021 | Completed final sign-off Jan 2022 | 1710 47th Av | kitchen and bathroom remodel in-kind no structural work. led lights with sensor. replace exh fan at bathroom.Details
kitchen and bathroom remodel in-kind no structural work. led lights with sensor. replace exh fan at bathroom. | $40,000 |
| Jul 2, 2021 | Completed final sign-off Sep 2021 | 551 Lakeview Av | remodel 2 bathrooms one with shower pan in kind at 2nd floor. no structural work.Details
remodel 2 bathrooms one with shower pan in kind at 2nd floor. no structural work. | $29,000 |
| Apr 28, 2021 | Completed final sign-off Mar 2022 | 518 25th Av | 1st flr unit- remodeling kitchen, bathroom and laundry room in kind. replace (e) (8) windows 1st & 2nd fl. visible from street. no structure work, no framing modification. windows at front to be wood aluminum clad or wood.Details
1st flr unit- remodeling kitchen, bathroom and laundry room in kind. replace (e) (8) windows 1st & 2nd fl. visible from street. no structure work, no framing modification. windows at front to be wood aluminum clad or wood. | $50,000 |
| Feb 22, 2021 | Completed final sign-off Nov 2025 | 310 29th Av | revision to pa# 8608381, to document elements changed. delete fire escape. 3rd fl revised full length rear deck, add bath. 2nd fl add shower to bath. fill in aclove. remove stove. move rear stair.Details
revision to pa# 8608381, to document elements changed. delete fire escape. 3rd fl revised full length rear deck, add bath. 2nd fl add shower to bath. fill in aclove. remove stove. move rear stair. | |
| Jun 29, 2020 | Completed final sign-off Apr 2021 | 518 25th Av | remodeling kitchen, two bathroom & laundry room in kind. remove (e) plaster, replace with sheetrock. add insulation & painting inside units. no structure work. all work in kind. all work on 3rd floorDetails
remodeling kitchen, two bathroom & laundry room in kind. remove (e) plaster, replace with sheetrock. add insulation & painting inside units. no structure work. all work in kind. all work on 3rd floor | $60,000 |
| Oct 7, 2019 | Completed final sign-off Dec 2020 | 763 26th Av | add new open interior stair between grd & 2nd flrs. add ground fl. acessory rooms: family room, bedroom, full bath, new patio doors & windows not visible from street, no work at front except repair terrazo steps, general mep upgradeDetails
add new open interior stair between grd & 2nd flrs. add ground fl. acessory rooms: family room, bedroom, full bath, new patio doors & windows not visible from street, no work at front except repair terrazo steps, general mep upgrade | $93,252 |
| Sep 26, 2019 | Completed final sign-off Aug 2020 | 1822 47th Av | remodel kitchen and hallway bath and add recessed lights for living and dining areaDetails
remodel kitchen and hallway bath and add recessed lights for living and dining area | $35,000 |
| Sep 26, 2019 | Completed final sign-off Nov 2019 | 18 Wayne Pl | replace bathroom wall tile around bathtub and install floor tile tooDetails
replace bathroom wall tile around bathtub and install floor tile too | $5,000 |
| Jan 14, 2019 | Completed final sign-off Jul 2019 | 100 Augusta St | remodel one full bathroom and half bath at 3rd floor. remodel kitchen and laundry room and power room at 2nd floor. no walls moved, removed, added nor infilled. all existing layouts to remain unchanged.Details
remodel one full bathroom and half bath at 3rd floor. remodel kitchen and laundry room and power room at 2nd floor. no walls moved, removed, added nor infilled. all existing layouts to remain unchanged. | $55,000 |
| Jan 14, 2019 | Completed final sign-off Mar 2019 | 2054 30th Av | remodel 2nd floor bathroom and install new exhaust fan with heater. no walls moved, added installed. all existing layouts to remain unchanged.Details
remodel 2nd floor bathroom and install new exhaust fan with heater. no walls moved, added installed. all existing layouts to remain unchanged. | $15,000 |
| Jan 7, 2019 | Completed final sign-off Jun 2019 | 367 31st Av | replace open powder room at garage with full bath and remodel 2nd floor kitchen. include replacement window to patioDetails
replace open powder room at garage with full bath and remodel 2nd floor kitchen. include replacement window to patio | $30,000 |
| Oct 30, 2018 | Completed final sign-off Jan 2019 | 1459 Green St | remodel upstairs bath and replace 1 window, bathtub ceiling fan, wall light, vanity and plumbing fictures and tiles. (window not visible from street) (sq ft 6 x 6)Details
remodel upstairs bath and replace 1 window, bathtub ceiling fan, wall light, vanity and plumbing fictures and tiles. (window not visible from street) (sq ft 6 x 6) | $15,000 |
| Oct 30, 2018 | Completed final sign-off Dec 2018 | 1280 28th Av | remodel upstair hall bath and install sun tunnel skylight, replace ceiling fan, wall light, plumbing fixtures and new tiles.Details
remodel upstair hall bath and install sun tunnel skylight, replace ceiling fan, wall light, plumbing fixtures and new tiles. | $15,000 |
| Jul 16, 2018 | Completed final sign-off Oct 2018 | 2622 18th Av | remodel one bath and shower unit. replace in same locationDetails
remodel one bath and shower unit. replace in same location | $15,000 |
| Jul 16, 2018 | Completed final sign-off Oct 2018 | 24 Ashbury St | 3rd floor: remodel one bath at 26 ashbury. replace in same locationDetails
3rd floor: remodel one bath at 26 ashbury. replace in same location | $15,000 |
| Jun 14, 2018 | Completed final sign-off Mar 2019 | 504 Joost Av | *ground fl accesory rooms - add 1 bedrm, family rm, 1 full bath, laundry closet in hall. remove door and wall @ entrance, open to stairs. add 2 skylights upstairs. new exterior deck and stairs to yard. general bolting of (e) foundation as needed. seismic upgrade new rooms on ground fl. general mepDetails
*ground fl accesory rooms - add 1 bedrm, family rm, 1 full bath, laundry closet in hall. remove door and wall @ entrance, open to stairs. add 2 skylights upstairs. new exterior deck and stairs to yard. general bolting of (e) foundation as needed. seismic upgrade new rooms on ground fl. general mep | $48,000 |
| Apr 13, 2018 | Completed final sign-off Jul 2018 | 1567 19th Av | unit # 3: remodel kitchen and bathroom in kind no structural work. no wall removal or relocationDetails
unit # 3: remodel kitchen and bathroom in kind no structural work. no wall removal or relocation | $30,000 |
| May 8, 2017 | Completed final sign-off Oct 2017 | 2024 Wawona St | remodel existing 2/f bathroom.Details
remodel existing 2/f bathroom. | $8,000 |
| May 2, 2017 | Completed final sign-off Oct 2017 | 2496 43rd Av | interior remodel of (e) family dwelling - remodel bath and install (n) dumbwaiterDetails
interior remodel of (e) family dwelling - remodel bath and install (n) dumbwaiter | $35,000 |
| Dec 29, 2016 | Completed final sign-off Jul 2017 | 1890 23rd Av | remodel (e) kitchen, remove 2 non bearing walls, eliminate int stairs btwn flrs. use space for kitchen, frame floor. add new bath, remodel 1 bath both on 2nd flr. replace 2 skylights. close 2. add plywd to 2 walls, add holddowns, no work at grnd flr. insulate where accessible. general mep upgrdsDetails
remodel (e) kitchen, remove 2 non bearing walls, eliminate int stairs btwn flrs. use space for kitchen, frame floor. add new bath, remodel 1 bath both on 2nd flr. replace 2 skylights. close 2. add plywd to 2 walls, add holddowns, no work at grnd flr. insulate where accessible. general mep upgrds | $40,737 |
| Dec 14, 2016 | Completed final sign-off Apr 2017 | 2719 39th Av | remodel uppger bathroom. new fixtures andupgrade electrical wire. install new shower unit and tiles.Details
remodel uppger bathroom. new fixtures andupgrade electrical wire. install new shower unit and tiles. | $10,000 |
| Sep 16, 2016 | Completed final sign-off Sep 2017 | 425 Lake St | remodel (e) kitchen, convert toilet room to full bathroom & home office at 1st flr. remodel one (e) bathroom, add two new full bathroom & construct staircase up to attic space at 2nd flr. construct (4) dormers of roof.Details
remodel (e) kitchen, convert toilet room to full bathroom & home office at 1st flr. remodel one (e) bathroom, add two new full bathroom & construct staircase up to attic space at 2nd flr. construct (4) dormers of roof. | $70,000 |
| May 4, 2016 | Completed final sign-off Sep 2016 | 1519 Noriega St | 1st floor remodel only: add (n) exercise room. ocnvert (e) storage to (n) home office room. add (n) half bath. elarge (e) two windows @ rear side. add (n) laundry sink @ (e) laundry room. replace (e) storage water heaters to (n) gas tankless water heaters.Details
1st floor remodel only: add (n) exercise room. ocnvert (e) storage to (n) home office room. add (n) half bath. elarge (e) two windows @ rear side. add (n) laundry sink @ (e) laundry room. replace (e) storage water heaters to (n) gas tankless water heaters. | $40,000 |
| Jan 25, 2016 | Completed final sign-off Mar 2016 | 1814 22nd Av | work in unit #4:remodel bathroom;replace sheetrock in one bedroom wall with 5/8" type x gyp. board & ceiling plaster & install insulation. replace two kitchen side windows in-kind,u-factor 0.32, not visible from street. no (n)wall & no (e)wall relocation. lighting shall comply w/cec 150.0(k)5Details
work in unit #4:remodel bathroom;replace sheetrock in one bedroom wall with 5/8" type x gyp. board & ceiling plaster & install insulation. replace two kitchen side windows in-kind,u-factor 0.32, not visible from street. no (n)wall & no (e)wall relocation. lighting shall comply w/cec 150.0(k)5 | $23,000 |
| Dec 23, 2015 | Completed final sign-off Aug 2016 | 2745 Ulloa St | upgrade e half bath ro full bath 1st fl. enlarge e family room at 1st fl. remodel baths at 2nd fl, remodel e kitchen at 2nd flDetails
upgrade e half bath ro full bath 1st fl. enlarge e family room at 1st fl. remodel baths at 2nd fl, remodel e kitchen at 2nd fl | $80,000 |
| Oct 15, 2015 | Completed final sign-off Sep 2016 | 449 Melrose Av | develop grnd flr accessory tooms for a masterbedrm, full bath, laundry/exercise area. open rail at (e) stairs at bottom. open wall partway @ top of steps to kitchen. enclose (e) furn,w/h utility closet. enlarge window at grn flr facing street. no strtral changes. add plywood panels & holddowns..Details
develop grnd flr accessory tooms for a masterbedrm, full bath, laundry/exercise area. open rail at (e) stairs at bottom. open wall partway @ top of steps to kitchen. enclose (e) furn,w/h utility closet. enlarge window at grn flr facing street. no strtral changes. add plywood panels & holddowns.. | $57,365 |
| Sep 10, 2015 | Completed final sign-off Sep 2016 | 16 Melrose Av | fill-in under sunroom on ground floor. ground floor are bath, study, bedrooms, storage/closet. partial fill-in inside garage for storage/closet. excavate to gain headroom as needed. new footings for fill-in bedroom. no work upstairs except remove door to stair & fill-in a door opening @ bedroom.Details
fill-in under sunroom on ground floor. ground floor are bath, study, bedrooms, storage/closet. partial fill-in inside garage for storage/closet. excavate to gain headroom as needed. new footings for fill-in bedroom. no work upstairs except remove door to stair & fill-in a door opening @ bedroom. | $60,000 |
| Jun 12, 2015 | Completed final sign-off Jan 2016 | 266 Gates St | open wall between living room & front bedroom, provide header beams. remodel kitchen, remodel bath, general mep upgrades. no change in area.Details
open wall between living room & front bedroom, provide header beams. remodel kitchen, remodel bath, general mep upgrades. no change in area. | $24,282 |
| Nov 20, 2012 | Completed final sign-off Aug 2013 | 40 Ceres St | convert existing playroom to a bedroom and a laundry room on 1st floor per plan. add one bath, one mud room and two storage room on 1st floor per planDetails
convert existing playroom to a bedroom and a laundry room on 1st floor per plan. add one bath, one mud room and two storage room on 1st floor per plan | $40,000 |
| Sep 6, 2011 | Completed final sign-off Dec 2011 | 2551 31st Av | remodel upper bathroom. remove existing bathtub and install new shower and new vanity sink, toilet and fan, lights and mirror.Details
remodel upper bathroom. remove existing bathtub and install new shower and new vanity sink, toilet and fan, lights and mirror. | $9,500 |
| Dec 14, 2010 | Completed final sign-off Apr 2011 | 465 15th Av | revision & reduce of pa #200711309295: reduction includes removal & mudroom & stairs in basement, eliminate half bath @ 1st floor, reduce size of deck, & misc. window reductions at addition. structural moment frame eliminated to be replaced by shear walls.Details
revision & reduce of pa #200711309295: reduction includes removal & mudroom & stairs in basement, eliminate half bath @ 1st floor, reduce size of deck, & misc. window reductions at addition. structural moment frame eliminated to be replaced by shear walls. | |
| Nov 10, 2010 | Completed final sign-off Apr 2011 | 315 Bacon St | revise application 201007277542 - rearrange ktichen & bath, replace stairs, relocate garage door.Details
revise application 201007277542 - rearrange ktichen & bath, replace stairs, relocate garage door. | $3,000 |
| Sep 16, 2010 | Completed final sign-off Apr 2011 | 55 Crestlake Dr | remodel (e) kitchen, 2 bathrooms. add new powder room and laundry room at first floor as shown on plans. relocate windows at kitchen.Details
remodel (e) kitchen, 2 bathrooms. add new powder room and laundry room at first floor as shown on plans. relocate windows at kitchen. | $40,000 |
| Jul 27, 2010 | Completed final sign-off Apr 2011 | 315 Bacon St | comply w/nov #200908542 dated 10/14/09- convert (e) bedroom to master bedroom, add a bedroom & a full bath, remodel kitchen & bathrooms on the 2nd flr. add two bedroom, one family, playroom & 2 full bath on ground floor. remove stairs @ lightwell. relocate water heaters & furnace. replace windows.Details
comply w/nov #200908542 dated 10/14/09- convert (e) bedroom to master bedroom, add a bedroom & a full bath, remodel kitchen & bathrooms on the 2nd flr. add two bedroom, one family, playroom & 2 full bath on ground floor. remove stairs @ lightwell. relocate water heaters & furnace. replace windows. | $60,000 |
| Jul 8, 2009 | Completed final sign-off Oct 2009 | 465 15th Av | remodeling upper bathroom and replace two windows in bathroom (toleit, whirlpoor, shower and sink) u factor for (n) windows 0.67 max.Details
remodeling upper bathroom and replace two windows in bathroom (toleit, whirlpoor, shower and sink) u factor for (n) windows 0.67 max. | $10,000 |
| Nov 20, 2008 | Never finaled issued Nov 2008, no final | 2193 18th Av | remodel 2 kitchens, 2 baths, replace e windows at lightwell, general mep upgrades, bolt foundation if needed. replace skylights. remove wall between hall and kitchen. install steel or paralam beam and post and footing.Details
remodel 2 kitchens, 2 baths, replace e windows at lightwell, general mep upgrades, bolt foundation if needed. replace skylights. remove wall between hall and kitchen. install steel or paralam beam and post and footing. | $36,000 |
| Oct 29, 2008 | Completed final sign-off Feb 2009 | 2667 20th Av | remodel bath one on second floor.Details
remodel bath one on second floor. | $12,000 |
| Oct 9, 2007 | Completed final sign-off Jun 2008 | 1377 22nd Av | remodel kitchen & bathroom, add full bathroom, combine sun room & bedroom to master bedroom, convert dining room to bedroom on 2/f. add 2 bedrooms, laundry, 2 full bathroom & master bedroom on 1/f.Details
remodel kitchen & bathroom, add full bathroom, combine sun room & bedroom to master bedroom, convert dining room to bedroom on 2/f. add 2 bedrooms, laundry, 2 full bathroom & master bedroom on 1/f. | $60,000 |
| Dec 15, 2006 | Completed final sign-off Jul 2007 | 2458 34th Av | add three bedrooms, two full bath, one sawna, one laundry room on ground floor. add one full bath, convert one bedroom to master bedroom, convert kchn to bedroom, convert living to kchn on 2nd floor per plan. infill extg 4'x4' lightwellDetails
add three bedrooms, two full bath, one sawna, one laundry room on ground floor. add one full bath, convert one bedroom to master bedroom, convert kchn to bedroom, convert living to kchn on 2nd floor per plan. infill extg 4'x4' lightwell | $85,000 |
| Jun 22, 2006 | Completed final sign-off Jan 2007 | 100 Beaumont Av | converting partial basement/garage to game room and storage, including electrical and plumbing work. add 1/2 bath.Details
converting partial basement/garage to game room and storage, including electrical and plumbing work. add 1/2 bath. | $20,000 |
| Jul 25, 2003 | Completed final sign-off Sep 2003 | 721 16th Av | remodeling kitchen and bathroom (one)Details
remodeling kitchen and bathroom (one) | $12,000 |
| Sep 6, 2002 | Expired or cancelled expired Feb 2003 | 2418 Funston Av | revision to pa 200107093242 add closet in master bedroom,add 2 & 1/2 baths in family room,musical rmDetails
revision to pa 200107093242 add closet in master bedroom,add 2 & 1/2 baths in family room,musical rm |