R M I Mechanical Contractors
- Based in
- South San Francisco
- On San Francisco permits
- Dec 2007 to May 2026
- Last 24 months
- 7 permits filed
42 permits since 2000: 36 completed, 6 never finaled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 78 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2017 | Completed final sign-off Dec 2017 | 325 Newhall St | add 1 heat pump unit, add 2 supply fans, 1 restroom exhaust fan, 1 kitchen exhaust fan, 1 exhaust fan for elec room, provide sheet metal ductwork and 5 pipes for the above. ref 2016-1229-6154.Details
add 1 heat pump unit, add 2 supply fans, 1 restroom exhaust fan, 1 kitchen exhaust fan, 1 exhaust fan for elec room, provide sheet metal ductwork and 5 pipes for the above. ref 2016-1229-6154. | $50,000 |