Back to kitchen remodel contractors
R M G Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to May 2010
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2010 | Completed final sign-off Sep 2010 | 555 Myra Wy | replace existing kitchen with new cabinets, counter top, flooring, back splash, sink, faucet & appliances. no change to room and wall layout. all work at 2nd floor.Details
replace existing kitchen with new cabinets, counter top, flooring, back splash, sink, faucet & appliances. no change to room and wall layout. all work at 2nd floor. | $20,000 |