R.L.Jones Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Aug 2026
- Last 24 months
- 3 permits filed
78 permits since 2000: 32 completed, 4 in progress, 26 never finaled, 16 expired or cancelled.
Of the 26 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 18 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2019 | Completed final sign-off Aug 2019 | 936 Wisconsin St | replace rotting structural members of rear covered decks in-kind, 1st & 2nd levelDetails
replace rotting structural members of rear covered decks in-kind, 1st & 2nd level | $5,000 |
| Sep 26, 2016 | Completed final sign-off Jan 2021 | 515 Goettingen St | add (2) new bedrooms and a bathroom at the rear of the (e) garage, to include leveling a portion of the main level and repairs to the foundation. also installation of a new rear deck and stairs from main level to yardDetails
add (2) new bedrooms and a bathroom at the rear of the (e) garage, to include leveling a portion of the main level and repairs to the foundation. also installation of a new rear deck and stairs from main level to yard | $110,000 |
| May 13, 2015 | Completed final sign-off Oct 2015 | 2163 19th Av | r&r (e) beam and post which have dry rot at stairs and deck. it is less than 50% replacement. additionally, some stucco wall repair.Details
r&r (e) beam and post which have dry rot at stairs and deck. it is less than 50% replacement. additionally, some stucco wall repair. | $16,000 |
| Jan 12, 2015 | Completed final sign-off Apr 2015 | 254 Collingwood St | repairs to existing rear yard deck and stairs. replace dry rot, less than 50% replacement.Details
repairs to existing rear yard deck and stairs. replace dry rot, less than 50% replacement. | $15,000 |